Tourism development of the swimming pool of Boucan Canot — Construction phase (Q3712381)

From EU Knowledge Graph
Revision as of 06:37, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Das Projekt zur Erschließung des Beckens von Boucan Canot zielt auf die Sanierung des Beckens, die Einrichtung eines Systems zur Erhaltung der Wasserqualität, die Einrichtung und Sicherung der Zugänge sowie die Einrichtung des Zugangs zum Strand ab., translated_summary)
Jump to navigation Jump to search
Project Q3712381 in France
Language Label Description Also known as
English
Tourism development of the swimming pool of Boucan Canot — Construction phase
Project Q3712381 in France

    Statements

    0 references
    403,636.44 Euro
    0 references
    576,623.48 Euro
    0 references
    70.0 percent
    0 references
    1 February 2015
    0 references
    31 October 2019
    0 references
    COMMUNE DE SAINT PAUL
    0 references
    0 references
    Le projet d’aménagement du Bassin de Boucan Canot a pour objet la réhabilitation du bassin, la mise en place d'un système de maintien de qualité de l'eau, l’aménagement et la sécurisation des accès ainsi que l’aménagement de l’accès à la plage. (French)
    0 references
    The purpose of the Boucan Canot Basin development project is to rehabilitate the basin, establish a system to maintain water quality, develop and secure access and develop access to the beach. (English)
    22 November 2021
    0 references
    Das Projekt zur Erschließung des Beckens von Boucan Canot zielt auf die Sanierung des Beckens, die Einrichtung eines Systems zur Erhaltung der Wasserqualität, die Einrichtung und Sicherung der Zugänge sowie die Einrichtung des Zugangs zum Strand ab. (German)
    2 December 2021
    0 references

    Identifiers

    RE0003270
    0 references