Demolition, reconstruction of Schoelcher High School — Tranche 1: Deconstruction, Supporting, Terraces, VRD, Outdoor fittings & Structure second work (Q3687013)

From EU Knowledge Graph
Revision as of 09:04, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Im Jahr 2006 hielt die Region den Wiederaufbau des Victor Schoelcher Gymnasiums an ihrem heutigen Standort zurück. Tatsächlich wurden die in Betrieb genommenen Gebäude zwischen 1933 und 1937 gebaut. Grund für diesen Wiederaufbau waren der Zustand der Struktur des Gebäudes, die Entwicklung der pädagogischen Vorkehrungen und die Notwendigkeit neuer Maßnahmen für die Sicherheit und Zugänglichkeit von Personen mit eingeschränkter Mobilität, die es n...)
Jump to navigation Jump to search
Project Q3687013 in France
Language Label Description Also known as
English
Demolition, reconstruction of Schoelcher High School — Tranche 1: Deconstruction, Supporting, Terraces, VRD, Outdoor fittings & Structure second work
Project Q3687013 in France

    Statements

    0 references
    18,059,430.35 Euro
    0 references
    42,393,028.99 Euro
    0 references
    42.6 percent
    0 references
    1 January 2017
    0 references
    30 March 2020
    0 references
    COLLECTIVITE TERRITORIALE DE MARTINIQUE
    0 references
    0 references

    14°36'36.50"N, 61°3'56.84"W
    0 references
    97200
    0 references
    En 2006, la Région a retenu la reconstruction du lycée Victor Schoelcher sur son site actuel. En effet, les bâtiments en service ont été construits entre 1933 et 1937. Cette reconstruction a été motivé par l’état de la structure du bâti, l’évolution des dispositions pédagogiques et l’exigence notamment de nouvelles mesures de sécurité et d’accessibilité aux PMR qui ne permettaient pas d’envisager une réhabilitation dans des conditions satisfaisantes de sûreté, de fonctionnalité, de confort, de coût de travaux et de coût de maintenance. Toutefois, la prise en compte de l’indéniable intérêt de cet ensemble architectural de type moderniste a conduit à renforcer la proposition du projet lauréat du concours, d’une conservation et d’une rénovation des bâtiments et escaliers constituant l’entrée historique. Pour mémoire, jusqu’à juin 2016, ce lycée d’enseignement général et technologique accueillait une communauté scolaire regroupée dans 18 bâtiments et composée de 1 426 élèves, 125 enseignants et 75 personnels. La capacité du nouveau lycée sera d’environ 1 400 élèves et étudiants avec un renforcement du post-bac. L’opération comprend la démolition, la reconstruction et la mise en place d’un nouvel équipement aux normes parasismiques. (French)
    0 references
    In 2006, the Region retained the reconstruction of Victor Schoelcher High School at its current site. Indeed, the buildings in service were built between 1933 and 1937. This reconstruction was motivated by the state of the structure of the building, the evolution of educational arrangements and the requirement, in particular, of new safety and accessibility measures for PRMs which did not allow for rehabilitation under satisfactory conditions of safety, functionality, comfort, cost of work and maintenance costs. However, taking into account the undeniable interest of this modernist architectural ensemble has led to strengthening the proposal of the winning project of the competition, for the conservation and renovation of the buildings and staircases constituting the historic entrance. For the record, until June 2016, this school of general and technological education hosted a school community grouped in 18 buildings and composed of 1,426 pupils, 125 teachers and 75 staff. The capacity of the new high school will be about 1,400 students with a reinforcement of the post-bac. The operation includes the demolition, reconstruction and installation of new seismic equipment. (English)
    18 November 2021
    0 references
    Im Jahr 2006 hielt die Region den Wiederaufbau des Victor Schoelcher Gymnasiums an ihrem heutigen Standort zurück. Tatsächlich wurden die in Betrieb genommenen Gebäude zwischen 1933 und 1937 gebaut. Grund für diesen Wiederaufbau waren der Zustand der Struktur des Gebäudes, die Entwicklung der pädagogischen Vorkehrungen und die Notwendigkeit neuer Maßnahmen für die Sicherheit und Zugänglichkeit von Personen mit eingeschränkter Mobilität, die es nicht ermöglichten, eine Sanierung unter zufrieden stellenden Bedingungen in Bezug auf Sicherheit, Funktionalität, Komfort, Arbeitskosten und Wartungskosten in Betracht zu ziehen. Die Berücksichtigung des unbestreitbaren Interesses dieses modernistischen architektonischen Komplexes hat jedoch dazu geführt, dass der Vorschlag für das erfolgreiche Projekt des Wettbewerbs, die Erhaltung und Renovierung der Gebäude und Treppen, die den historischen Eingang bilden, gestärkt wurde. Es sei daran erinnert, dass dieses Gymnasium für allgemeine und technologische Bildung bis Juni 2016 eine Schulgemeinschaft in 18 Gebäuden beherbergte, die sich aus 1 426 Schülern, 125 Lehrern und 75 Mitarbeitern zusammensetzte. Die Kapazität des neuen Gymnasiums wird etwa 1.400 Schüler und Studenten mit einer Stärkung der Post-Bac. Die Operation umfasst den Abriss, den Wiederaufbau und die Einrichtung einer neuen Ausrüstung nach Erdbebenstandards. (German)
    1 December 2021
    0 references

    Identifiers

    MQ0015413
    0 references