Addition of two laboratory rooms to the 1st municipal school of Gorgopotam (Q2791685)

From EU Knowledge Graph
Revision as of 19:26, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet prévoit la construction d’un nouveau bâtiment comprenant deux ateliers d’une superficie totale de 132,92 m², en tant que bâtiment indépendant sur le plan fonctionnel à l’extrémité sud-est de la parcelle. En outre, afin d’assurer l’accessibilité au complexe scolaire, des dispositions sont prévues pour le développement d’une zone routière aveugle et la configuration des rampes sur le trottoir existant sur la rue I. Metaxas. Cet événement...)
Jump to navigation Jump to search
Project Q2791685 in Greece
Language Label Description Also known as
English
Addition of two laboratory rooms to the 1st municipal school of Gorgopotam
Project Q2791685 in Greece

    Statements

    0 references
    106,278.0 Euro
    0 references
    20 February 2020
    0 references
    15 February 2022
    0 references
    ΔΗΜΟΣ ΛΑΜΙΕΩΝ
    0 references
    0 references

    38°35'26.70"N, 22°37'5.92"E
    0 references
    Με τι συγκεκριμένο έργο προβλέπεται η ανέγερση νέου κτιρίου που θα περιλαμβάνει δύο αίθουσες εργαστηρίων συνολικού εμβαδού 132,92μ2, ως λειτουργικά ανεξάρτητο κτίριο στο νοτιοανατολικό άκρο του οικοπέδου. Επιπλέον, για την εξασφάλιση της προσβασιμότητας στο σχολικό συγκρότημα, προβλέπεται η διαμόρφωση ζώνης όδευσης τυφλών και διαμόρφωση ραμπών πρόσβασης στο υφιστάμενο πεζοδρόμιο επί της οδού Ι. Μεταξά. Το γεγονός αυτό προέκυψε ως ανάγκη κατόπιν χαρτογράφησης των υφιστάμενων σχολικών υποδομών της προσχολικής , πρωτοβάθμιας και δευτεροβάθμιας εκπαίδευσης του Δήμου Λαμιέων , του αριθμού των μαθητών καθώς και του αιτήματος του σχολείου, που έγινε από την Τεχνική Υπηρεσία του Δήμου σε συνεργασία με το τμήμα Παιδείας- Δια Βίου Μάθησης. Το έργο αναμένεται να ολοκληρωθεί σε περίπου 270 ημέρες από την έναρξη κατασκευής του. (Greek)
    0 references
    With what specific project is the construction of a new building comprising two workshop halls with a total area of 132.92 m², as a functionally independent building at the southeastern end of the plot. In addition, in order to ensure accessibility to the school complex, provision is made for the development of a blind road zone and the configuration of access ramps to the existing pavement on I.Metaxas street. This event arose as a need following mapping of the existing school infrastructures of the pre-school, primary and secondary education of the Municipality of Lamias, the number of students and the school’s request, made by the Technical Service of the Municipality in cooperation with the Department of Education-Life Learning. The project is expected to be completed in about 270 days from the start of construction. (English)
    2 July 2021
    0 references
    Le projet prévoit la construction d’un nouveau bâtiment comprenant deux ateliers d’une superficie totale de 132,92 m², en tant que bâtiment indépendant sur le plan fonctionnel à l’extrémité sud-est de la parcelle. En outre, afin d’assurer l’accessibilité au complexe scolaire, des dispositions sont prévues pour le développement d’une zone routière aveugle et la configuration des rampes sur le trottoir existant sur la rue I. Metaxas. Cet événement est apparu comme un besoin à la suite d’une cartographie de l’infrastructure scolaire existante de l’enseignement préscolaire, primaire et secondaire de la municipalité de Lamia, du nombre d’élèves ainsi que de la demande de l’école, faite par le service technique de la municipalité en coopération avec le Département de l’éducation et de l’apprentissage tout au long de la vie. Le projet devrait être achevé dans environ 270 jours à compter du début de sa construction. (French)
    29 November 2021
    0 references

    Identifiers

    5.021.500
    0 references