Rehabilitation of Largo da Feira and surrounding (Q2895142)

From EU Knowledge Graph
Revision as of 20:50, 21 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: modifying budgets in portugal one item from slovenia)
Jump to navigation Jump to search
Project Q2895142 in Portugal
Language Label Description Also known as
English
Rehabilitation of Largo da Feira and surrounding
Project Q2895142 in Portugal

    Statements

    0 references
    0 references
    778,102.0 Euro
    0 references
    915,414.0 Euro
    0 references
    85.0 percent
    0 references
    14 June 2018
    0 references
    31 March 2021
    0 references
    MUNICÍPIO DA PÓVOA DE LANHOSO
    0 references

    41°34'35.69"N, 8°16'2.28"W
    0 references
    Esta intervenção infraestrutural numa área de 25.230m2 correspondente ao largo da Feira e à sua envolvente é constituída por trabalhos de: pavimentação nos arruamentos e passeios, paisagismo rede de iluminação rede de águas pluviais construção de infraestruturas e mobiliário urbano. Esta operação pretende estabelecer uma dinâmica de uso que, integrada com a envolvente, torne a sua frequência atrativa. (Portuguese)
    0 references
    This infrastructural intervention in an area of 25,230 m² corresponding to the exterior of the Fair and its surroundings consists of works of: Paving in the streets and walks, landscaping network lighting network of rainwater construction of infrastructures and urban furniture. This operation aims to establish a dynamic of use that, integrated with the surroundings, makes its frequency attractive. (English)
    8 July 2021
    0 references
    Póvoa de Lanhoso, Póvoa de Lanhoso (Nossa Senhora do Amparo)
    0 references

    Identifiers

    NORTE-04-2316-FEDER-000187
    0 references