Removal of fibrocement coverage in elementary school and secondary school Artur Gonçalves (Q2871100)

From EU Knowledge Graph
Revision as of 14:30, 21 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: modifying budgets in portugal one item from slovenia)
Jump to navigation Jump to search
Project Q2871100 in Portugal
Language Label Description Also known as
English
Removal of fibrocement coverage in elementary school and secondary school Artur Gonçalves
Project Q2871100 in Portugal

    Statements

    0 references
    8,187.0 Euro
    0 references
    8,187.0 Euro
    0 references
    100.0 percent
    0 references
    22 September 2020
    0 references
    31 December 2020
    0 references
    MUNICÍPIO DE TORRES NOVAS
    0 references
    0 references

    39°29'56.40"N, 8°30'28.76"W
    0 references
    Um total de investimento de 8 187,44€, permitirá que seja removida a totalidade das coberturas contendo amianto ainda existentes no recinto escolar da Escola Básica e Secundária Artur Gonçalves, dotando o espaço de condições de higiene e segurança adequadas á sua frequência. A substituição da cobertura permitirá, ainda, a melhoria do desempenho energético do edifico intervencionado. (Portuguese)
    0 references
    A total investment of EUR 8 187.44 will allow the removal of all asbestos-containing roofs still in the school grounds of the Artur Gonçalves Basic and Secondary School, providing the space with adequate hygiene and safety conditions for their frequency. The replacement of the coverage will also allow the improvement of the energy performance of the intervened building. (English)
    7 July 2021
    0 references
    Torres Novas, União das freguesias de Torres Novas (Santa Maria, Salvador e Santiago)
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000278
    0 references