INSTALLATIONS AND NETWORKS (BIOMASS) (Q3176646)

From EU Knowledge Graph
Revision as of 18:59, 12 October 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The operation is aimed at the improvement of biomass installations and their connection to municipal public buildings, and is part of the Action Line 4 Improvement, adaptation and installation of equipment and networks for supply (biomass) and the ERDF specific objective OE4.5.3. Improving energy efficiency and increasing renewable energy in urban areas. This action will effectively contribute to the enhancement of existing biomass resources in...)
Jump to navigation Jump to search
Project Q3176646 in Spain
Language Label Description Also known as
English
INSTALLATIONS AND NETWORKS (BIOMASS)
Project Q3176646 in Spain

    Statements

    0 references
    200,000.0 Euro
    0 references
    250,000.0 Euro
    0 references
    80.0 percent
    0 references
    1 January 2019
    0 references
    31 December 2020
    0 references
    AYUNTAMIENTO DE CUENCA
    0 references

    40°4'5.23"N, 2°8'5.35"W
    0 references

    40°4'5.23"N, 2°8'5.35"W
    0 references
    16078
    0 references
    La operación está dirigida a la mejora de instalaciones de biomasa y su conexión con edificios públicos municipales, y se enmarca en la Línea de Actuación 4 Mejora, adaptación e instalación de equipos y redes para suministro (biomasa) y el objetivo específico FEDER OE4.5.3. Mejora de la eficiencia energética y aumento de energía renovable en las áreas urbanas. Esta actuación contribuirá de forma efectiva a la puesta en valor de los recursos de biomasa existentes en el municipio, pudiendo hacer uso de los mismos en beneficio de las instalaciones municipales y de la ciudadanía en general al generar un menor impacto medioambiental y de emisiones de GEI a la atmósfera. _x000D_ La operación comprenderá también un análisis de edificios e instalaciones dotadas de sistemas de climatización basados en el consumo de energías fósiles, determinando igualmente las eficiencias producidas por la sustitución de unos sistemas por otros. _x000D_ _x000D_ Con ello se estiman, entre otras, las siguientes actuaciones derivadas de la operación propuesta: _x000D_ _x000D_ • Estudios y análisis previos para la determinación de la tipología de caldera a implantar y de las eficiencias estimadas_x000D_ • Obras y adaptaciones necesarias para la instalación de calderas y conexiones a los circuitos de calefacción y ACS _x000D_ • Habilitación de espacios, obras y adaptaciones para la creación de silos de pellets o astillas conexos o próximos a los cuartos de calderas _x000D_ • Certificaciones y auditorías energéticas necesarias _x000D_ • Instalación y adaptación de sistemas de calefacción tales como termostatos o válvulas termostáticas que fuesen necesarias _x000D_ • Otros gastos derivados de los procesos de análisis, diseño e implantación de medidas (Spanish)
    0 references
    The operation is aimed at the improvement of biomass installations and their connection to municipal public buildings, and is part of the Action Line 4 Improvement, adaptation and installation of equipment and networks for supply (biomass) and the ERDF specific objective OE4.5.3. Improving energy efficiency and increasing renewable energy in urban areas. This action will effectively contribute to the enhancement of existing biomass resources in the municipality, being able to make use of them for the benefit of municipal facilities and the general public by generating a lower environmental impact and GHG emissions to the atmosphere. _x000D_ the operation will also include an analysis of buildings and installations equipped with air conditioning systems based on fossil energy consumption, also determining the efficiencies produced by the replacement of one system by another. _x000D_ _x000D_ thus estimate, among others, the following actions arising from the proposed operation: _x000D_ _x000D_ • Preliminary studies and analyses for the determination of the type of boiler to be implemented and the estimated efficiencies_x000D_ • Works and adaptations necessary for the installation of boilers and connections to heating circuits and ACS _x000D_ • Enabling spaces, works and adaptations for the creation of pellet silos or splinters related or close to boiler rooms _x000D_ • Energy certifications and audits required _x000D_ • Installation and adaptation of heating systems such as thermostats or thermostatic valves required _x000D_ • Other costs arising from the analysis, design and implementation of measures (English)
    12 October 2021
    0 references
    Cuenca
    0 references

    Identifiers

    FDU01CM1814
    0 references