Construction of a 97.2 kW photovoltaic installation with the necessary infrastructure in Piotrków in the commune of Janowiec Kościelny (Q2717152)

From EU Knowledge Graph
Revision as of 00:40, 22 September 2021 by DG Regio (talk | contribs) (‎Changed claim: budget (P474): 150,586.02 euro)
Jump to navigation Jump to search
Project Q2717152 in Poland
Language Label Description Also known as
English
Construction of a 97.2 kW photovoltaic installation with the necessary infrastructure in Piotrków in the commune of Janowiec Kościelny
Project Q2717152 in Poland

    Statements

    0 references
    575,790.0 zloty
    0 references
    127,998.12 Euro
    0.2223 Euro
    0 references
    677,400.0 zloty
    0 references
    150,586.02 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 September 2020
    0 references
    31 October 2020
    0 references
    VANS ENERGY
    0 references
    0 references

    53°17'21.8"N, 20°31'22.4"E
    0 references
    Projekt polega na ( etapy): 1. Opracowaniu dokumentacji i wykonaniu zadań zgodnie z harmonogramem pkt 2.4.3 Studium i przygotowaniem i złożeniem wniosku o dofinansowanie 2. Budowie instalacji fotowolt. naziemnej o mocy do 97,2 kW składającej się z 360 modułów o mocy 270 Wp każdy i 2 inwerterów trójfazowych o mocy 50kW. Realizacja zadania zakłada sfinansowanie instalacji, jej montaż i uruchomienie wraz z dostarczeniem wszelkich niezbędnych do wykonania prac części i narzędzi (systemów montażowych do zabudowy modułów, kabli, przewodów, sprzętów elektroinstalacyjnych do instalacji DC i AC). Instalacja wyposażona będzie w system intelig.zarządzania e.e.(TiK). 3. Budowie stacji transformatorowej. Aby instalacja mogła zostać podłączona do sieci istnieje konieczność budowy transformatora. Realizacja zadania polega na zakupie stacji transformatorowej z niezbędnymi elementami składowymi, jej montaż i uruchomienie. Wnioskodawca posiada aktualne warunki przyłączenia, warunki zabudowy i pozwolenie na budowę W wyniku realizacji projektu nastąpi: Redukcja emisji CO2-83,326 ton/rok Instalacja wytworzy ok 102,872 MWh/rok, która zostanie odsprzedana do sieci. Miejsce realizacji: Piotrkowo, gm.Janowiec Kościelny, pow.nidzicki (dz.nr ew. 33), woj. warm.-mazurskie Koszty kwalifikowane projektu wyniosą 677400,00 zł, a wnioskowane dofinansow. wynosi 575 790, 00 zł, zgodnie 85% pomocy de minimis. VAT jest niekwalifikowalny. Wnioskodawca ma prawną możliwość odzyskania VAT. Projekt wpisuje się w założenia określone w SzOOP RPO WiM dla IV Osi Priorytetowej, jest zgodny z: celem szczegółowym dla działania 4.1, którym jest: "Zwiększony udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu";Typem projektu przewidzianym w SzOOP czyli "budowie, rozbudowie oraz przebudowie infrastruktury (w tym zakup niezbędnych urządzeń) mające na celu produkcję e.e z oze"; Limitami i ograniczeniami, typem beneficjenta oraz pozostałymi zapisami SzOOP i Regulaminu konkursu (Polish)
    0 references
    The project consists of (stages): 1. Preparation of documentation and performance of tasks in accordance with the schedule of point 2.4.3 Study and preparation and submission of the application for funding 2. The construction of a terrestrial photovoltage installation up to 97.2 kW consisting of 360 modules with a power of 270 Wp each and 2 three-phase inverters with a power of 50 kW. The implementation of the task involves financing the installation, its assembly and commissioning together with the delivery of all necessary parts and tools (mounting systems for the installation of modules, cables, wires, electrical equipment for DC and AC installations). The installation will be equipped with a system of intelligence.management e.e.(TiK). 3. Construction of a transformer station. For the installation to be connected to the network, it is necessary to build a transformer. The task consists of purchasing a transformer station with the necessary components, assembling and commissioning it. The applicant has current connection conditions, building conditions and building permit As a result of the project: Reduction of CO2-83,326 tonnes/year The installation will produce approximately 102,872 MWh/year, which will be sold to the network. Place of implementation: Piotrkowo, Janowiec Kościelny, Pow.nidzicki (dz. nr. ev. 33), warm.-Mazury voivodship, eligible costs of the project amount to PLN 677400.00, and the requested co-financing amounts to PLN 575 790.00, in accordance with 85 % of the de minimis aid. VAT is ineligible. The applicant has the legal possibility to recover the VAT. The project is in line with the assumptions set out in the SzOOP ROP WiM for Priority Axis IV, complies with: specific objective for Action 4.1, which is: “Increased share of renewable energy sources in the region’s overall energy balance”;The type of project provided for in the SzOOP, i.e. “construction, extension and reconstruction of infrastructure (including the purchase of necessary equipment) for the production of e.e. from oze”; Limits and limitations, type of beneficiary and other provisions of the SzOOP and the Competition Regulations (English)