SOFIA METRO EXTENSION PROJECT: LINE 3, STAGE I — SECTION “BLVD. VLADIMIR VAZOV — CGC — ZHITNITSA STR.” (Q3878210)

From EU Knowledge Graph
Revision as of 15:22, 3 December 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Jump to navigation Jump to search
Project Q3878210 in Bulgaria
Language Label Description Also known as
English
SOFIA METRO EXTENSION PROJECT: LINE 3, STAGE I — SECTION “BLVD. VLADIMIR VAZOV — CGC — ZHITNITSA STR.”
Project Q3878210 in Bulgaria

    Statements

    0 references
    547,853,811.89 Bulgarian lev
    0 references
    279,405,444.06 Euro
    1 December 2021
    0 references
    778,768,904.21 Bulgarian lev
    0 references
    397,172,141.15 Euro
    1 December 2021
    0 references
    0.7 percent
    0 references
    15 September 2015
    0 references
    31 December 2021
    0 references
    0 references

    42°41'52.30"N, 23°19'19.85"E
    0 references
    Етап І от проекта за реализация на Линия 3, включва подземния участък от линията в централната градска част (ЦГЧ) от метростанция 5 (разположена на кръстовището на бул.Владимир Вазов с ул.Панайот Хитов) до метростанция 14 (разположена под ул.Житница в близост до кръстовището с бул.Цар Борис ІІІ) с дължина 7,8км, 8 метростанции, депо и доставка на необходимия подвижен състав.С реализацията на настоящото проектно предложение, Етап І „бул.Владимир Вазов – ЦГЧ – ул.Житница” на Линия 3, ще бъде изградена значителна част от заложената в ОУП трета линия на метрото по направление североизток-югозапад, която ще прави връзка с другите две линии в ЦГЧ. По този начин в най-близко бъдеще се създават условия за интегрирана работа на системите метро, автомобилен, ж.п. и въздушен транспорт, което пряко води до още по-ефективното развитие на приоритета за интермодалност при превоза на пътници.Прогнозният стойност на инвестициите за изграждането на Етап І от Линия 3 от разширението на метрото в София е приета около 433 млн.евро (без ДДС) базирана, на постигнатата тръжна цена за другите участъци, изградени по ОП”Транспорт”2007-2014 от Проекта за разширение на метрото в София. По настоящото проектно предложение ще бъдат изградени: трасе на метрото с обща дължина 7,8км, 8 метростанци и депо, които са оборудвани със системи за експлоатация по части: Електроинсталации, Слаботокови системи, Траспортна автоматика, Топлоснабдяване, отопление, вентилация и климатизация, Водоснабдяване и Канализация, Релсов път, репери, пътни и сигнални знаци и Контактна мрежа, като общата стойност на строително-монтажните работи и на машините и оборудването е 317млн.евро .В Проекта е предвидена и доставката на Подвижен състав на стойност 95млн.евро. (Bulgarian)
    0 references
    Stage I of the project for the implementation of Line 3 includes the underground section of the line in the central part of the city from metro station 5 (located at the intersection of Vladimir Vazov Blvd. with Panayot Hitov Street) to metro station 14 (located under Zhitnitsa Str. near the intersection with Tsar Boris III Blvd.) with length 7.8 km, 8 metro stations, depot and delivery of the necessary rolling stock.With the implementation of this project proposal, Stage I “Vladimir Vazov Blvd. — CGC — Zhitnitsa Str.” of Line 3, will be built a significant part of the third line of the metro line set in the GSP in the north-east-southwest direction, which will connect with the other two lines in the CGC. Thus, in the near future conditions for integrated operation of the metro, road, rail and air transport systems are being created, which directly leads to the even more effective development of the priority for intermodality in passenger transport. The estimated value of the investments for the construction of Stage I of Line 3 of the Sofia Metro Extension was adopted around EUR 433 million (excluding VAT) based on the achieved tender price for the other sections built under OP Transport 2007-2014 of the Sofia Metro Extension Project. Under this project proposal, the following will be built: metro route with a total length of 7.8 km, 8 metro stations and a depot, which are equipped with systems for operation on a part basis: Electrical installations, Weak current systems, transport automation, heating, ventilation and air conditioning, Water supply and drainage, rail, tracks, road and signal signs and contact network, the total value of the construction and installation works and of the machinery and equipment is EUR 317 million. The project also provides for the supply of rolling stock worth EUR 95 million. (English)
    2 December 2021
    0 references
    София
    0 references

    Identifiers

    BG16M1OP001-3.001-0001
    0 references