Construction of a bicycle path on the section Świebodzin – Szczaniec. (Q100355)

From EU Knowledge Graph
Revision as of 08:42, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet concerne la construction d’un réseau de pistes cyclables, qui servira de corridors de transport en remplacement d’autres modes de transport. Le projet est un investissement routier qui consiste à construire des pistes cyclables. Il prévoit des travaux de construction dans les secteurs suivants: route, pont, construction et construction — petite architecture (stop-bike stop 2 pcs: stand à vélo, table de pique-nique, poubelle, panneau d’...)
Jump to navigation Jump to search
Project Q100355 in Poland
Language Label Description Also known as
English
Construction of a bicycle path on the section Świebodzin – Szczaniec.
Project Q100355 in Poland

    Statements

    0 references
    0 references
    0 references
    1,349,818.33 zloty
    0 references
    323,956.40 Euro
    13 January 2020
    0 references
    2,081,347.33 zloty
    0 references
    499,523.36 Euro
    13 January 2020
    0 references
    64.85 percent
    0 references
    30 January 2018
    0 references
    30 September 2020
    0 references
    GMINA SZCZANIEC
    0 references

    52°16'9.5"N, 15°41'7.8"E
    0 references

    52°14'59.3"N, 15°31'57.0"E
    0 references
    Przedmiotem projektu jest budowa sieci ścieżek rowerowych, które będą pełniły funkcję korytarzy transportowych, będących alternatywą dla innych środków transportu. Przedsięwzięcie to inwestycja drogowa polegająca na budowie ścieżek rowerowych. W jej ramach przewiduje się roboty budowlane w branżach: drogowej, mostowej, konstrukcyjno-budowlanej – mała architektura (miejsca postoju-bike stop 2 szt: stojak na rowery, stół piknikowy, kosz na odpady, tablica info. ustawione na utwardzonej nawierzchni). We wszystkich koniecznych przypadkach będą wykonane roboty branżowe związane z usunięciem kolizji ścieżek rowerowych z infrastr. podziemną i naziemną. Inwestycja realizowana jest w partnerstwie: Gm. Szczaniec (lider), Gm. Świebodzin, Gm. Zbąszynek, Pow. Świebodziński. Usytuowana jest w woj. lubuskim na terenie Gm. Szczaniec (pow. świebodziński). Obejmuje budowę ścieżki rowerowej o długości ok. 4,7 km, na odcinkach dróg ze Szczańca w kierunku Świebodzina, w tym na obszarze miejscowości Jerzyce i Szczaniec (gm. Szczaniec). Gr. docelowe: Mieszkańcy Pow. Świebodzińskiego; Inwestorzy i przedsiębiorcy; Władze JST: gm. Szczaniec, gm. Świebodzin, gm. Zbąszynek, pow. Świebodzińskiego; Instytucje systemu ochrony środowiska. Gł. celem projektu jest ograniczenie niskiej emisji zanieczyszczeń z sektora transportu poprzez rozwój infrastruktury rowerowej na terenie Pow. Świebodzińskiego. Do celów szczegółowych należą: 1. Rozwój infrastruktury dla rowerzystów 2. Poprawa jakości i funkcjonowania oferty systemu transportowego 3. Zwiększenie bezpieczeństwa rowerzystów na drogach publ. W. Produktu: Dł. wspartej infr. rowerowej: 4,7 km, L. obiektów dost. do potrzeb osób z niepełn.: 1 szt. L. proj., w których sfinansowano koszty racjonalnych usprawnień dla osób z niepełn.: 1 szt. W. Rezultatu: Szac. roczny spadek emisji g. ciepl. (CI 34): 25,15 Tony równoważnika CO2/rok W. zatr: 1 EPC W. zatr. - kobiety: 0 EPC W. zatr. – mężczyźni: 1 EPC (Polish)
    0 references
    The subject of the project is the construction of a network of bicycle paths, which will serve as transport corridors, which are an alternative to other modes of transport. The project is a road investment involving the construction of bicycle paths. It envisages construction works in the following sectors: road, bridge, construction and construction – small architecture (staying-bike stop 2 pcs: bicycle stand, picnic table, waste basket, table info. set on paved surface). In all cases necessary, industry work will be done to remove collisions of bicycle paths from underground and terrestrial infrastr. The investment is carried out in partnership: GM. Szczaniec (leader), Gm. Świebodzin, Gm. Zbąszynek, Pow. It’s a freshman. It is located in Lubuskie Voivodeship in the area of Gm. Szczaniec (Pow. Świbodziński). It includes the construction of a bicycle path with a length of approx. 4.7 km, on sections of the roads from Szczaniec towards Świebodzina, including in the area of Jerzyce and Szczaniec (gm. Szczaniec). Target: Residents of Pow. Świebodziński; Investors and entrepreneurs; The authorities of the HST shall: Gm. Szczaniec, gm. Świebodzin, gm. Zbuszynek, pow. Świebodziński; Environmental protection system institutions. The aim of the project is to reduce the low emissions of pollutants from the transport sector through the development of cycling infrastructure in Pow. It’s Świebodziński. The specific objectives shall include: 1. Development of infrastructure for cyclists 2. Improving the quality and functioning of the transport system offer 3. Increase the safety of cyclists on publ roads. W. Product: D. in support of bicycle infr.: 4,7 km, L. facilities available for the needs of persons with incomplete.: 1 pcs L. project, which financed the costs of rational improvement for persons incomplete: 1 pcs W. Result: Estimated annual decrease in emissions of g. heat. (CI 34): 25,15 tonnes of CO2 equivalent/year W. zatr: 1 FTE W. zatr. — women: 0 FTE W. zatr. — men: 1 FTE (English)
    16 October 2020
    0 references
    Le projet concerne la construction d’un réseau de pistes cyclables, qui servira de corridors de transport en remplacement d’autres modes de transport. Le projet est un investissement routier qui consiste à construire des pistes cyclables. Il prévoit des travaux de construction dans les secteurs suivants: route, pont, construction et construction — petite architecture (stop-bike stop 2 pcs: stand à vélo, table de pique-nique, poubelle, panneau d’information. mis sur surface pavée). Dans tous les cas nécessaires, des travaux industriels relatifs à l’élimination des collisions entre les pistes cyclables et les infrastructures souterraines et terrestres seront réalisés. L’investissement est réalisé en partenariat: GM. Szczaniec (leader), Świebodzin, Zbąszynek, Pow. C’est Saint-Pétersbourg. Il est situé dans la province de Lubuskie à Szczaniec (Pow. swiebodziński). Comprend la construction d’une piste cyclable d’une longueur d’env. 4,7 km, sur des tronçons de routes de Szczańca vers Świebodzin, y compris dans la zone de Jerzyce et Szczaniec (municipalité de Szczaniec). Cible: Les habitants du Pow. Stiebodziński; Investisseurs et entrepreneurs; Autorités de la JST: Szczaniec, Świebodzin, Zbąszynek, région Stiebodziński; Institutions du système de protection de l’environnement. L’objectif principal du projet est de réduire les faibles émissions de polluants provenant du secteur des transports en développant des infrastructures cyclables dans le Pow. C’est à Saint-Pétersbourg. Les objectifs spécifiques sont les suivants: 1. Développement de l’infrastructure pour les cyclistes 2. Amélioration de la qualité et du fonctionnement du système de transport 3. Accroître la sécurité des cyclistes sur les routes de publ. W. Produit: Supporté par vélo infr.: 4,7 km, L. installations accès aux besoins des personnes incomplètes: 1 pcs. L. proj., qui a financé le coût des aménagements raisonnables pour les personnes en partie: 1 pcs. W. Résultat: Diminution annuelle estimée des émissions de g. chaleur. (CIR. 34): 25,15 tonnes d’équivalent CO2/an W. zatr: 1 ETP W. zatr. — femmes: 0 ETP W. zatr. — hommes: 1 ETP (French)
    1 December 2021
    0 references

    Identifiers

    RPLB.03.03.01-08-0003/18
    0 references