Construction of the S19 expressway Lublin – Rzeszów, w. Lublin Węglin – w. Kraśnik Południe (Q85871)

From EU Knowledge Graph
Revision as of 11:00, 3 December 2021 by DG Regio (talk | contribs) (‎Removed claim: contained in NUTS (P1845): Lubelski (Q2577118), Removing duplicate contained in NUTS)
Jump to navigation Jump to search
Project Q85871 in Poland
Language Label Description Also known as
English
Construction of the S19 expressway Lublin – Rzeszów, w. Lublin Węglin – w. Kraśnik Południe
Project Q85871 in Poland

    Statements

    0 references
    0 references
    0 references
    0 references
    736,586,673.09 zloty
    0 references
    176,780,801.54 Euro
    13 January 2020
    0 references
    866,572,556.58 zloty
    0 references
    207,977,413.58 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2022
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    50°56'36.6"N, 22°12'30.2"E
    0 references

    50°59'11.8"N, 22°19'40.8"E
    0 references

    51°13'34.3"N, 22°27'41.4"E
    0 references

    51°6'51.1"N, 22°23'16.1"E
    0 references

    51°2'49.9"N, 22°26'12.1"E
    0 references
    Projekt ma na celu budowę drogi ekspresowej S19 Lublin – Rzeszów, odc. w. Lublin Węglin – w . Kraśnik Południe o długości 41,93 km. Przedmiotowy Projekt, składa się z trzech odcinków realizacyjnych: 1. Część nr 1 - w. Lublin Węglin (bez węzła) – w. Niedrzwica Duża (z węzłem) – od km 0+000,00 do km 12+046,36; 2. Części nr 2 - w. Niedrzwica Duża (bez węzła) – w. Kraśnik Północ (bez węzła) – od km 12+046,36 do km 32+000,00; 3. Części nr 3 - w. Kraśnik Północ (z węzłem) – w. Kraśnik Południe (z węzłem) – od km 32+000,00 do km 41+934,40; Inwestycja jest realizowana w systemie Projektuj & Buduj. Na całym odcinku przedmiotowej inwestycji przewidziano przekrój dwujezdniowy z dwoma pasami ruchu (i rezerwą na dodatkowy pas ruchu, do przekroju docelowego 2x3 pasy ruchu) oraz pasem awaryjnym, dostosowany do prognozowanego poziomu ruchu. Zaprojektowane, w ramach przedmiotowej inwestycji, węzły drogowe, umożliwią bezpieczną komunikację i rozprowadzenie ruchu po pozostałej sieci drogowej oraz obsługę przyległego terenu poprzez sieć dróg serwisowych. Przedmiotowy Projekt, obejmujący drogę ekspresową S19, zlokalizowany jest w województwie lubelskim, w powiecie lubelskim na terenie: gminy Konopnica, Niedrzwica Duża i Strzyżewice oraz w powiecie kraśnickim na terenie gminy Wilkołaz i Kraśnik oraz na terenie miasta Kraśnik. (Polish)
    0 references
    The project aims to build an expressway S19 Lublin – Rzeszów, odc. w. Lublin Węglin – w. Kraśnik South with a length of 41.93 km. The project consists of three sections of the project: 1. Part no. 1 – w. Lublin Węglin (without a node) – w. Nie doorzwica Duża (with a node) – from km 0 + 000.00 to km 12 + 046,36; 2. Part No. 2 – w. Nie doorzwica Large (without a node) – w. Kraśnik Północ (without a node) – from km 12 + 046.36 to km 32 + 000,00; 3. Part No. 3 – w. Kraśnik Północ (with a node) – w. Kraśnik Południe (with a knot) – from km 32 + 000.00 to km 41 + 934,40; The investment is implemented in the Design & Build system. A two-way cross-section with two lanes (and a reserve for additional lanes for the 2x3 lanes target section) and an emergency lane, adapted to the forecast traffic level, is provided for the entire section of the investment. The road junctions designed, as part of this investment, will allow safe communication and distribution of traffic on the rest of the road network and the operation of adjacent land through the network of service roads. The project, including the S19 expressway, is located in Lubelskie Voivodeship, Lublin County in the following areas: the communes of Konopnica, Niedrzwica Duża and Strzyżewice and in Kraśnik County, Wilkołaz and Kraśnik, and Kraśnik. (English)
    14 October 2020
    0 references
    Le projet vise à construire la voie express S19 Lublin — Rzeszów, à partir de Lublin Węglin — w. Kraśnik Sud, 41,93 km de long. Le projet en question se compose de trois volets de mise en œuvre: 1. Partie no 1 — w. Lublin Węglin (sans jonction) — Niedrzwica Duża (avec jonction) — du km 0+ 00.00 au km 12 + 046,36; 2. Partie no 2 — Niedrzwica Duża (sans le nœud) — Kraśnik Północ (sans le nœud) — du km 12 + 046,36 au km 32 + 000,00; 3. Partie no 3 — Kraśnik Północ (avec jonction) — Kraśnik Południe (avec jonction) — du km 32 + 000,00 au km 41 + 934,40; L’investissement est réalisé dans le système Design & Build. Un tronçon à deux voies avec deux voies (et une réserve pour une voie supplémentaire, jusqu’à la cible de 2x3 voies) et une voie d’urgence, adaptée au niveau de trafic prévu, ont été prévus pour l’ensemble du tronçon de l’investissement. Les carrefours routiers conçus dans le cadre de cet investissement permettront une communication et une distribution sûres du trafic sur le reste du réseau routier et l’exploitation du terrain adjacent par le réseau routier de service. Ce projet, qui comprend l’autoroute S19, est situé dans la voïvodie de Lubelskie, dans le comté de Lubelskie, dans les zones suivantes: les communes de Konopnica, Niedrzwica Duża et Strzyżewice et dans le comté de Kraśnice dans les communes de Wilkołaz et Kraśnik et dans la ville de Kraśnik. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.03.01.00-00-0051/19
    0 references