Works on railway lines no. 140, 148, 157, 159, 173, 689, 691 on the section Chybie – Żory – Rybnik – Nędza/Tur (Q86014)

From EU Knowledge Graph
Revision as of 10:21, 3 December 2021 by DG Regio (talk | contribs) (‎Removed claim: contained in NUTS (P1845): Rybnicki (Q2577112), Removing duplicate contained in NUTS)
Jump to navigation Jump to search
Project Q86014 in Poland
Language Label Description Also known as
English
Works on railway lines no. 140, 148, 157, 159, 173, 689, 691 on the section Chybie – Żory – Rybnik – Nędza/Tur
Project Q86014 in Poland

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    265,702,600.22 zloty
    0 references
    63,768,624.05 Euro
    13 January 2020
    0 references
    312,591,294.38 zloty
    0 references
    75,021,910.65 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 January 2017
    0 references
    31 December 2019
    0 references
    PKP POLSKIE LINIE KOLEJOWE S.A.
    0 references
    Q2515024 (Deleted Item)
    0 references
    0 references

    49°53'48.8"N, 18°48'54.7"E
    0 references

    49°55'1.6"N, 18°45'49.0"E
    0 references

    49°57'39.2"N, 18°42'58.3"E
    0 references

    50°8'29.8"N, 18°18'46.8"E
    0 references

    50°6'25.6"N, 18°25'37.9"E
    0 references

    50°6'21.6"N, 18°28'22.4"E
    0 references

    50°6'53.3"N, 18°20'58.2"E
    0 references

    50°6'38.2"N, 18°33'11.5"E
    0 references

    50°2'20.0"N, 18°40'50.2"E
    0 references
    Projekt obejmuje rehabilitację odcinków linii kolejowych, łączących bezpośrednio ze sobą dwa ciągi TEN-T, to jest E65/C-E65 i E59/C-E59. Jest zlokalizowany w południowo-zachodniej części województwa śląskiego, na obszarze Rybnickiego Okręgu Węglowego, i jest istotnym elementem zarówno lokalnej, jak i europejskiej infrastruktury kolejowej w Polsce. Projekt obejmuje rehabilitację (przywrócenie pierwotnych parametrów technicznych) na nw. odcinkach linii kolejowych (wszystkie odcinki są liniami zelektryfikowanymi): -nr 691 odcinek Nędza Wieś–Turze, od km (-0,011) do km 1,474 o długości 1,485 km; -nr 140 odcinek Nędza–Nędza Wieś–Sumina, od km 57,764 do km 67,862 o długości 10,098 km (odcinek jest objęty umową AGTC); -nr 173 odcinek Rybnik–Sumina, od km (-0,500) do km 13,353 o długości 13,853 km; -nr 148 odcinek Rybnik–Żory, od km 21,873 do km 35,980 o długości 14,107 km (odcinek należy do sieci kompleksowej TEN-T i jest objęty umową AGCT); -nr 159 odcinek Żory–Studzionka, od km 12,800 do km 24,444 o długości 11,644 km; -nr 689 odcinek Studzionka–Dębina, od km 0,000 do km 2,507 o długości 2,507 km; -nr 157 odcinek Dębina–Chybie, od km 2,390 do km 8,600 o długości 6,210 km; Vmax - pociągi pasażerskie i towarowe 100 km/h (na LK 140 odcinek Nędza–Nędza Wieś - 80 km/h, LK 691 - 60 km/h), dopuszczalny nacisk na oś 221 kN Łączna długość linii kolejowych objętych projektem wynosi 59,904 km ( tym 14,107 km stanowi sieć kompleksową TEN-T) W ramach zakresu rzeczowego Projektu planuje się remont/przebudowę 16 wiaduktów, 14 mostów i 1 kładki dla pieszych (łącznie 31 obiektów inżynieryjnych). Projekt obejmuje przystosowanie peronów (19 szt.) do potrzeb obsługi osób niepełnosprawnych i o ograniczonej możliwości poruszania się na 5 stacjach i 5 przystankach osobowych oraz poprawę bezpieczeństwa na 5 przejazdach kolejowych. (Polish)
    0 references
    The project involves rehabilitation of railway sections directly connecting two TEN-T lines, i.e. E65/C-E65 and E59/C-E59. It is located in the south-western part of the Silesian Voivodeship, in the area of Rybnik Węglowa District, and is an important element of both local and European railway infrastructure in Poland. The project includes rehabilitation (restoration of the original technical parameters) on the new sections of railway lines (all sections are electrified lines): —No 691 section of Nędza Wieś-Tura, from km (-0.011) to 1.474 km with a length of 1.485 km; —No. 140 section of Nędza-Ladza Wieś-Sumina, from km 57.764 to km 67.862 with a length of 10.098 km (the section is covered by the AGTC agreement); —No 173 of the Rybnik-Sumina section, from km (-0.500) to 13.353 km with a length of 13,853 km; —No 148 Rybnik-Żory section, from km 21.873 to km 35.980 with a length of 14,107 km (the section belongs to the TEN-T comprehensive network and is covered by the AGCT Agreement); —No 159 section of Żory-Studzionka, from km 12.800 to km 24.444 with a length of 11.644 km; —No 689 section of Studzionka-Dębina, from km 0.000 to km 2.507 with a length of 2.507 km; —No 157 of the section of Dębina-Chybie, from km 2.390 to km 8.600 with a length of 6,210 km; Vmax – passenger and freight trains 100 km/h (for LK 140 section Nędza-Lodza Wieś – 80 km/h, LK 691-60 km/h), permissible pressure on axis 221 kN The total length of the railway lines covered by the project is 59.904 km (including 14.107 km is the TEN-T comprehensive network) The project’s material scope is planned to renovate/reconstruction 16 viaducts, 14 bridges and 1 footbridges (connectingly 31). The project includes the adaptation of platforms (19 pieces) to the needs of disabled people with reduced mobility at 5 stations and 5 passenger stops and to improve safety at 5 railway crossings. (English)
    14 October 2020
    0 references
    Le projet prévoit la remise en état de tronçons de lignes ferroviaires reliant directement les deux lignes RTE-T, à savoir les lignes E65/C-E65 et E59/C-E59. Il est situé dans la partie sud-ouest de la voïvodie de Silésie, dans la zone du district du charbon de Rybnicki, et est un élément important de l’infrastructure ferroviaire locale et européenne en Pologne. Le projet comprend la remise en état (restauration des paramètres techniques d’origine) des tronçons de lignes de chemin de fer susmentionnés (tous les tronçons sont des lignes électrifiées): — No 691 tronçon de Nędza Wieś-Turze, de km (-0,011) à 1,474 km d’une longueur de 1,485 km; —No 140 section Nędza-Nędza Wieś-Sumina, du km 57,764 au km 67.862 d’une longueur de 10,098 km (la section est couverte par l’accord AGTC); —No 173 section Rybnik-Sumina, du km (-0,500) au km 13 353 d’une longueur de 13,853 km; —No 148 du tronçon Rybnik-″ory, du km 21.873 au km 35.980 d’une longueur de 14,107 km (le tronçon appartient au réseau global du RTE-T et est couvert par l’accord AGCT); — La section no 159 de la section «Studzionka», du km 12 800 au km 24 444, d’une longueur de 11,644 km; — No 689 tronçon Studzionka-Dębin, de km 0,000 à km 2,507 km de long; —No 157 du tronçon Dębin-Chybie, du km 2390 au km 8 600 avec une longueur de 6,210 km; Vmax — trains de voyageurs et de marchandises 100 km/h (pour le tronçon LK 140 Nędza-Nędza Wieś — 80 km/h, 691-60 km/h), charge par essieu admissible de 221 kN La longueur totale des lignes ferroviaires couvertes par le projet est de 59,904 km (dont 14,107 km est le réseau global RTE-T). Le projet comprend l’adaptation des quais (19 unités) aux besoins des personnes handicapées et des personnes à mobilité réduite dans 5 gares et 5 arrêts de passagers, ainsi que l’amélioration de la sécurité aux 5 passages à niveau. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.05.02.00-00-0004/16
    0 references