II/388 Beaver – Choose, 1st section (Q74873)

From EU Knowledge Graph
Revision as of 01:30, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet a pour objet la modernisation de la route II/388 Bobrová — Zvole, 1er tronçon, qui suit le 2e tronçon déjà reconstruit à intravilán dans le village de Zvole nad Perštejnem, situé sur le km 25.843 du Passeport et se terminant au km 26.281 et mis en œuvre en 2015 sur les ressources propres de la requérante. Le projet résout des paramètres techniques insatisfaisants de la communication qui ne répondent pas aux exigences actuelles en matiè...)
Jump to navigation Jump to search
Project Q74873 in Czech Republic
Language Label Description Also known as
English
II/388 Beaver – Choose, 1st section
Project Q74873 in Czech Republic

    Statements

    0 references
    74,089,688.43 Czech koruna
    0 references
    2,963,587.54 Euro
    10 January 2020
    0 references
    87,164,339.34 Czech koruna
    0 references
    3,486,573.57 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    6 October 2015
    0 references
    1 February 2017
    0 references
    2 March 2017
    0 references
    Kraj Vysočina
    0 references

    49°24'8.6"N, 15°35'7.1"E
    0 references
    58601
    0 references
    Předmětem projektu je modernizace komunikace II/388 Bobrová - Zvole, 1. úsek, která navazuje na již rekonstruovaný 2. úsek v intravilánu v obci Zvole nad Perštejnem, který se nachází v pasportním km 25,843 a končí v km 26,281 a byl realizován roce 2015 z vlastních zdrojů žadatele. Projekt řeší nevyhovující technické parametry komunikace, které neodpovídají současným dopravním požadavkům. Celková délka modernizace je 3,681 km a základní návrhová kategorie komunikace II/388 je S 6,5/50. (Czech)
    0 references
    The object of the project is modernisation of the communication II/388 Bobrová – Zvole, the 1st section that follows the already reconstructed 2nd section in the intravilan in the village of Zvole nad Perštejnem, which is located on the passport km 25.843 and ends in km 26.281 and was realised in 2015 from the applicant’s own resources. The project solves unsatisfactory technical parameters of communication that do not meet current transport requirements. The total length of the modernisation is 3.681 km and the basic design category of communication II/388 is S 6,5/50. (English)
    23 October 2020
    0 references
    Le projet a pour objet la modernisation de la route II/388 Bobrová — Zvole, 1er tronçon, qui suit le 2e tronçon déjà reconstruit à intravilán dans le village de Zvole nad Perštejnem, situé sur le km 25.843 du Passeport et se terminant au km 26.281 et mis en œuvre en 2015 sur les ressources propres de la requérante. Le projet résout des paramètres techniques insatisfaisants de la communication qui ne répondent pas aux exigences actuelles en matière de trafic. La longueur totale de la modernisation est de 3,681 km et la catégorie de conception de base de la route II/388 est de S 6.5/50. (French)
    29 November 2021
    0 references

    Identifiers

    CZ.06.1.42/0.0/0.0/15_002/0000808
    0 references