Construction of fibre manufacturing plant in Simitli (Q3833754)
Jump to navigation
Jump to search
Project Q3833754 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of fibre manufacturing plant in Simitli |
Project Q3833754 in Bulgaria |
Statements
298,542.47 Bulgarian lev
0 references
702,452.89 Bulgarian lev
0 references
0.42 percent
0 references
10 September 2020
0 references
10 September 2023
0 references
Проекта, включва инвестиции в строително-ремонтни дейности с цел изграждане на нова производствена база за произвеждане на оптични кабели. При реализиране на проектните дейности ще бъдат изградени: производствен цех с административно помещение, ажурна ограда около имота с цел охрана, дейности по озеленяване и вертикална планировка (описани в табл. 1 от Бизнес плана). За изпълнение на СМР е получена една оферта, тъй като разходите са включени в списъка с референтни стойности на ДФЗ (посочени в ТДИ). На базата на тази оферта е сключен договор за извършване на строително – ремонти дейности. За обезпечаване на производството е предвидено закупуване на технологично оборудване, описано в част „Технологична“, което ще бъде извършено със собствени средства (посочено в Таблица 1А).При реализирането на дейностите по проекта ще бъдат назначени 10 нови служителя на работни позиции, описани в част „Технологична“. (Bulgarian)
0 references
The project includes investments in construction and repair works in order to build a new production base for the production of optical cables. In the implementation of the project activities will be built: production workshop with administrative room, open-air fence around the property for security purposes, landscaping activities and vertical planning (described in tab. 1 of the Business Plan). One offer was received for the implementation of the works, as the costs were included in the list of reference values of the SFA (referred to in the TDI). On the basis of this offer, a contract for carrying out construction and repair works was concluded. The purchase of technological equipment described in the “Technological” part, which will be carried out by its own means (listed in Table 1A) is foreseen to cover the production. When the project activities are carried out, 10 new employees will be appointed to work positions described in the “Technological” part. (English)
2 December 2021
0 references
Симитли
0 references