Commissioning of a furniture manufacturing plant (Q3832542)

From EU Knowledge Graph
Revision as of 11:23, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project provides for the creation of a high-tech workshop for the production of solid wood furniture. The workshop will be housed in the town of Aytos, municipality. Aytos, region. Burgas, namely: Two rooms with an area of 144 m² and 72 m² located side by side and connected to each other, having a separate entrance, one to the ramp of the northern one-storey part of Main Corps Inv. No. 1 located in the central part of R & D II — 307 of sq. 2...)
Jump to navigation Jump to search
Project Q3832542 in Bulgaria
Language Label Description Also known as
English
Commissioning of a furniture manufacturing plant
Project Q3832542 in Bulgaria

    Statements

    0 references
    121,837.5 Bulgarian lev
    0 references
    62,137.12 Euro
    1 December 2021
    0 references
    180,500.0 Bulgarian lev
    0 references
    92,055.0 Euro
    1 December 2021
    0 references
    0.68 percent
    0 references
    17 December 2020
    0 references
    17 December 2022
    0 references
    0 references
    Проекта предвижда създаване на високо технологичен цех за производство на мебели от масивно дърво. Цеха ще се помещава в гр. Айтос, общ. Айтос, обл. Бургас, а именно: Две помещения с площ 144 м² и 72 м² намиращи се едно до друго и свързани помежду си, имащи отделен вход васяко едно към рампа на северната едноетажна част на Главен Корпус Инв.№1 находящ се в централната част на УПИ II – 307от кв. 259, включваща едноетажна част със ЗП 6615 м² и РЗП 6615 м² и двуетажна част – хладилник със ЗП 883 м² и РЗП 1766 м² или общо ЗП 7498 м² и РЗП 8381 м²Ще бъдат закупени :-Форматен циркуляр за дървени плоскости – 1бр.;-Машина за рязане на трупи – 1бр.;-Разкрояваща цифрова машина за дървени плоскости – 1бр.;-Вентилационна филтрираща система – 1бр.;-Пелетираща машина – 1бр.;-Калибрираща машина за дървени плоскости – 1р.;-Полираща машина за дървени плоскости – 1бр.;-Ръчна преса за слепване на дървени плоскости – 1бр.;-Струг за дървени плоскости – 1бр.;Ще бъдат назначени 4 нови работници. За производството е предвидена пневмотранспортна инсталация, за улавяне на дървесните частици, отделяни при обработката на ПДЧ плоскостите. За целта ще се монтира система от въздуховоди свързваща дървообработващите машини в цеха с циклона и бункера, разположени вън от сградата.За производството е предвидена инсталация за сгъстен въздух. Изпълнението е предвидено с тръби и фитинги от полипропилен.Режим на работа на предприятието, ще, е 252 дни годишно на една работна смяна, при продължителност на работната смяна 8 часа. Избрано технологично оборудване. отговаря на съвременните норми и изисквания на предприятията от бранша. (Bulgarian)
    0 references
    The project provides for the creation of a high-tech workshop for the production of solid wood furniture. The workshop will be housed in the town of Aytos, municipality. Aytos, region. Burgas, namely: Two rooms with an area of 144 m² and 72 m² located side by side and connected to each other, having a separate entrance, one to the ramp of the northern one-storey part of Main Corps Inv. No. 1 located in the central part of R & D II — 307 of sq. 259, comprising a one-storey part with DF 6 615 m² and total area of 6 615 m² and a two-storey part — refrigerator with 883 m² and total area of 1 766 m² or total FD 7 498 m² and total area of 8 381 m²will be purchased:-Formal circular saw for wooden boards — 1 piece;- Log cutting machine — 1pcs.;-Decision digital wood board machine — 1pc;-Ventilation filtering system — 1pcs;-Pelting machine — 1pcs;-Calibrating machine for wooden boards — 1p.;-Polishing machine for wooden boards — 1pcs;-Manual press for gluing wooden boards — 1 piece;- Wood panel lathe — 1pcs.;-will be recruited 4 new workers. For the production, a pneumatic transport installation is provided for the capture of particles emitted during the processing of chipboards. For this purpose, a system of air ducts connecting woodworking machines will be installed in the workshop with the cyclone and the bunker located outside the building. The performance is provided with pipes and fittings of polypropylene.The working mode of the enterprise, will, is 252 days per year on one shift, with the duration of the working shift 8 hours. Selected technological equipment. meets the modern norms and requirements of the enterprises in the industry. (English)
    2 December 2021
    0 references
    Айтос
    0 references

    Identifiers

    BG06RDNP001-19.270-0004
    0 references