Reducing the energy performance of building 15. Elementary school in ul. J. A. Comenius No. 474, Most – recovery (Q73856)

From EU Knowledge Graph
Revision as of 01:16, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet est d’améliorer l’environnement de travail interne des 15 pavillons du bâtiment. École primaire La plupart, en installant la climatisation à l’aide de chaleur résiduelle (activité 5.1b).Le projet est présenté en même temps que le projet, qui résout l’isolation du bâtiment de l’école primaire appelé "Réduire la performance énergétique du bâtiment 15. École primaire dans la rue. J. A. Comenius no 474, Most — isolation" (activi...)
Jump to navigation Jump to search
Project Q73856 in Czech Republic
Language Label Description Also known as
English
Reducing the energy performance of building 15. Elementary school in ul. J. A. Comenius No. 474, Most – recovery
Project Q73856 in Czech Republic

    Statements

    0 references
    5,402,304.6 Czech koruna
    0 references
    216,092.18 Euro
    10 January 2020
    0 references
    7,717,578.0 Czech koruna
    0 references
    308,703.12 Euro
    10 January 2020
    0 references
    70 percent
    0 references
    30 November 2020
    0 references
    Statutární město Most
    0 references
    0 references
    0 references

    50°29'52.15"N, 13°38'50.46"E
    0 references
    43401
    0 references
    Cílem projektu je zlepšení vnitřního pracovního prostředí v pavilonech areálu budovy 15. ZŠ Most, a to instalací vzduchotechniky s využitím odpadního tepla (aktivita 5.1b).Projekt je podáván současně s projektem, který řeší zateplení budovy ZŠ s názvem "Snížení energetické náročnosti budovy 15. Základní školy v ul. J. A. Komenského č.p. 474, Most - zateplení" (aktivita 5.1a), hash Hs3WfP, jiná výše dotace. (Czech)
    0 references
    The aim of the project is to improve the internal working environment in the pavilions of building 15. Elementary school Most, namely by installation of ventilation equipment using waste heat (activity 5.1b).The project is administered simultaneously with a project that deals with insulation of the primary school building called "Reduction of energy performance of building 15. Elementary school in ul. J. A. Comenius No. 474, Most – Insulated" (activity 5.1a), hash Hs3WfP, other amount of subsidy. (English)
    23 October 2020
    0 references
    L’objectif du projet est d’améliorer l’environnement de travail interne des 15 pavillons du bâtiment. École primaire La plupart, en installant la climatisation à l’aide de chaleur résiduelle (activité 5.1b).Le projet est présenté en même temps que le projet, qui résout l’isolation du bâtiment de l’école primaire appelé "Réduire la performance énergétique du bâtiment 15. École primaire dans la rue. J. A. Comenius no 474, Most — isolation" (activité 5.1a), hachage Hs3WfP, autre montant de subvention. (French)
    29 November 2021
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/18_100/0009228
    0 references