Construction of 250 kW photovoltaic power plant in Bobrowniki and purchase of power banks along with necessary infrastructure (Q137683)

From EU Knowledge Graph
Revision as of 20:07, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q137683 in Poland
Language Label Description Also known as
English
Construction of 250 kW photovoltaic power plant in Bobrowniki and purchase of power banks along with necessary infrastructure
Project Q137683 in Poland

    Statements

    0 references
    2,465,008.0 zloty
    0 references
    591,601.92 Euro
    13 January 2020
    0 references
    3,081,260.0 zloty
    0 references
    739,502.4 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 July 2016
    0 references
    28 March 2019
    0 references
    DOBRA SP. Z O.O.
    0 references
    0 references
    Projekt polega na budowie instalacji fotowoltaicznej o mocy 250 kW oraz zakupie banku energii wraz z niezbędną infrastrukturą. Instalacja zostanie zlokalizowana na działce nr 185,186. położonej w obrębie geodezyjnym Bobrowniki, gmina Chociwel, powiat Stargard Szczeciński województwo zachodniopomorskie. W ramach realizacji projektu Wnioskodawca wybuduje instalację fotowoltaiczną wraz z niezbędną infrastrukturą. Pod planowaną inwestycję przeznaczony jest obszar nie przekraczający 0,50 ha. Wnioskodawca jest właścicielem nieruchomości. Aktualnie teren pod planowane przedsięwzięcie jest niezabudowany, porośnięty w głównej mierze roślinnością łąkową. Po podpisaniu umowy o dofinansowanie Wnioskodawca wyłoni wykonawcę, który dostarczy instalację i ją zamontuje. Następnie zostanie zamówiona instalacja, a po jej dostarczeniu nastąpi jej montaż i odbiór. Planowana do wykonania instalacja jest dosyć kosztochłonna w przeliczeniu na jednostkę jej mocy produkcyjnej. Jest to związane z wysokim kosztem jej wyposażenia w banki energii. Jednak jest to element niezbędny ze względu na fakt, że zakłada się wykorzystanie wyprodukowanej energii praktycznie w jednym miejscu przyłączenia tj. odbiorcą , który jest zdecydowany odebrać całość energii wytworzonej z instalacji na jego potrzeby (list intencyjny). Zakłada się, że jedynie marginalna część energii skierowana będzie do sieci. Natomiast niemalże cała wyprodukowana energia trafi do odbiorcy przez przyłącze lub po wcześniejszym jej zmagazynowaniu w banku energii. Takie podejście gwarantuje uzyskanie znacznie lepszej ceny za energię uzasadniając konieczność poniesienia wyższych nakładów, co założono w analizie finansowej przedmiotowego projektu. Dodatkowym uzasadnieniem jest fakt, że dostawa energii odbędzie się praktycznie bez najmniejszych strat (Polish)
    0 references
    The project consists of the construction of a 250 kW photovoltaic installation and the purchase of an energy bank together with the necessary infrastructure. The installation will be located on plot no.185.186. located within the geodesic area of Bobrowniki, Chociwel commune, Stargard Szczeciński Voivodeship Zachodniopomorskie. As part of the project, the applicant will build a photovoltaic installation together with the necessary infrastructure. The planned investment is intended for an area not exceeding 0,50 ha. The applicant owns the property. Currently, the area under the planned project is unbuilt, mainly covered with meadow vegetation. After signing the grant agreement, the applicant will select the contractor who will supply the installation and install it. The installation will then be ordered, and after delivery it will be assembled and received. The planned installation is quite cost-intensive per unit of its production capacity. This is due to the high cost of its equipment with energy banks. However, this is a necessary element due to the fact that the energy produced is assumed to be used in practically one connection point, i.e. the customer, who is determined to collect all the energy generated from the installation for its needs (list of intent). It is assumed that only a marginal part of the energy will be directed to the grid. On the other hand, almost all the energy produced will be delivered to the recipient via the connection or after its earlier storage in the energy bank. This approach ensures a much better price for energy, justifying the need for higher costs, as set out in the financial analysis of the project in question. An additional justification is the fact that the supply of energy will take place practically without the slightest losses (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-A027/16
    0 references