Purchase and assembly of photovoltaic micro-installation by PPHUiG “Magda” in Piecky (Q132066)

From EU Knowledge Graph
Revision as of 09:22, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q132066 in Poland
Language Label Description Also known as
English
Purchase and assembly of photovoltaic micro-installation by PPHUiG “Magda” in Piecky
Project Q132066 in Poland

    Statements

    0 references
    83,793.0 zloty
    0 references
    20,110.32 Euro
    13 January 2020
    0 references
    98,580.0 zloty
    0 references
    23,659.2 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 April 2017
    0 references
    19 July 2018
    0 references
    GRZEGORZ GRABOWSKI- PRZEDSIĘBIORSTWO PRODUKCYJNO-HANDLOWO-USŁUGOWE I GASTRONOMICZNE "MAGDA"
    0 references
    0 references

    53°44'57.1"N, 21°20'28.3"E
    0 references
    Inwestycja objęta niniejszym projektem polega na zakupie i montażu elektrowni fotowoltaicznej o mocy 16,50 kW. w Pieckach, na działce nr 929. Projekt wpisuje się w typ projektu wymieniony w SzOOP RPO WiM 2014-2020 dla działania 4.1 - instalacji wykorzystujących energię słońca (np. kolektory słoneczne, fotowoltaika) - do 2 MWe/MWth. Instalacja będzie służyła potrzebom własnym przedsiębiorstwa i będzie podłączona do sieci, jednakże ze względu na moc instalacji (do 40 kW) zgodnie z art. 5 ustawy o odnawialnych źródłach energii (Dz.U. 2015 poz. 478) oraz Art. 7 ust. 8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U. Dz.U. 1997 nr 54 poz. 348) będzie ona dokonywana na podstawie zgłoszenia bez konieczności posiadania przez beneficjenta ważnych technicznych warunków przyłączenia wszystkich ujętych w projekcie źródeł wytwarzania energii do sieci elektroenergetycznej. Wnioskodawca posiada obecnie przyłącze gdzie moc umowna wynosi 20 kW. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP RPO WiM 2014-2020. Niniejszy projekt zakłada dostawę i montaż dachowej instalacji fotowoltaicznej z wykorzystaniem technologii polikrystalicznej do produkcji energii elektrycznej. Inwestycja polega na montażu 60 paneli fotowoltaicznych o łącznej mocy 16,50 kW połączonych w samodzielne układy wraz z falownikami, z niezbędnym okablowaniem i osprzętem. Panele fotowoltaiczne wykorzystują zjawisko fotowoltaiczne do przetwarzania promieniowania słonecznego na energię elektryczną. Za pomocą połączeń kablowych przekazują one energię do falowników, gdzie następuje zmiana prądu stałego w prąd zmienny. Elektrownia będzie podłączona do sieci, natomiast nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą energię wyprodukowaną przez system fotowoltaiczny. Wyprodukowana energia elektryczna będzie wykorzystywana bezpośrednio na potrzeby własne a ewentualna nadwyżka będzie wprowadzona do sieci. (Polish)
    0 references
    The investment covered by this project consists of the purchase and assembly of a photovoltaic power plant with a capacity of 16,50 kW. in Piecky, on plot No. 929. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – solar energy installations (e.g. solar collectors, photovoltaics) – up to 2 MWe/MWth. The installation will serve the company’s own needs and will be connected to the grid, however due to the capacity of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Sources Act (Journal of Laws 2015 item. 478) and Article 7. 8d with stamp 4-9 of the Act – Energy Law (Journal of Laws, Journal of Laws 1997 No. 54, item. 348) it will be made on the basis of a notification without the beneficiary having to have important technical conditions for connecting all energy generation sources included in the project to the electricity grid. The applicant now has a connection with a contractual capacity of 20 kW. The project meets all the shore conditions specified in the SHOOP RPO WiM 2014-2020. This project involves the supply and installation of a PV roof installation using polycrystalline technology to produce electricity. The investment consists of mounting 60 photovoltaic panels with a total power of 16.50 kW connected to independent circuits with inverters, with the necessary wiring and fittings. Photovoltaic panels use the photovoltaic phenomenon to convert solar radiation into electricity. By means of cable connections, they transmit energy to inverters, where the direct current changes to alternating current. The power plant will be connected to the grid, but there will be no need to install batteries and charge regulators, as the network is able to absorb all the energy produced by the photovoltaic system. The electricity produced will be used directly for own use and any surplus will be introduced into the grid. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0486/16
    0 references