Construction of the N-S Route in Ruda Śląskie connecting the Road Medium Route with the A4 motorway – stage II (Q124482)

From EU Knowledge Graph
Revision as of 16:59, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q124482 in Poland
Language Label Description Also known as
English
Construction of the N-S Route in Ruda Śląskie connecting the Road Medium Route with the A4 motorway – stage II
Project Q124482 in Poland

    Statements

    0 references
    110,483,864.63 zloty
    0 references
    26,516,127.51 Euro
    13 January 2020
    0 references
    165,395,006.93 zloty
    0 references
    39,694,801.66 Euro
    13 January 2020
    0 references
    66.8 percent
    0 references
    7 October 2014
    0 references
    23 December 2020
    0 references
    MIASTO RUDA ŚLĄSKA
    0 references
    0 references

    50°16'13.1"N, 18°51'51.8"E
    0 references
    Przedmiotem projektu jest budowa ostatniego odcinka trasy N-S, która ma na celu utworzenie bezkolizyjnego połączenia Drogowej Trasy Średnicowej z autostradą A4. Odcinek ten obejmuje budowę trasy N-S o długości 1670 m od ul. Kokota do połączenia z autostradą A4 w węźle „Wirek”. W ramach projektu przewidziano budowę m.in.: - obiektów inżynierskich - elementów systemu odwodnienia - chodników i ścieżek rowerowych - elementów bezpieczeństwa ruchu drogowego takich jak: bariery ochronne, oznakowanie poziome i pionowe - oświetlenia wzdłuż całej trasy - przepustów zintegrowanych z przejściem dla małych zwierząt. Celem projektu jest: - zwiększenie dostępności DTŚ i autostrady A4 - bezkolizyjne połączenie DTŚ z autostradą A4 - zwiększenie przepustowości DW 925 w kierunku pn.– pd. - zwiększenie bezpieczeństwa ruchu na ul. 1 Maja - skrócenie czasu przejazdu pomiędzy pn. i pd. dzielnicami miasta oraz ul. 1 Maja - podniesienie atrakcyjności inwestycyjnej terenów położonych w ciągu ul. 1 Maja i N-S (Polish)
    0 references
    The object of the project is the construction of the last section of the N-S route, which aims to establish an uncollid connection of the Road Medium Route with the A4 motorway. This section includes the construction of the N-S route 1670 m from the street. Kokota to connect to the A4 motorway in the “Wirek” junction. The project included the construction of: — engineering facilities – elements of the drainage system – pavements and cycle paths – road safety elements such as: protective barriers, horizontal and vertical markings – illumination along the whole route – culverts integrated into the transition for small animals. The aim of the project is to: — increasing the availability of DTŚ and the A4 motorway – a collision-free connection between the DTŚ and the A4 motorway – increasing the capacity of DW 925 in the direction BC – pd. — increasing traffic safety on ul. 1 May – shortening the journey time between BC and south of the city districts and street. 1 May – increase the investment attractiveness of areas located in the street. 1 May and N-S (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.06.01.00-24-09EE/16
    0 references