Energy modernisation of public utility buildings of the City of Jasła (Q118688)

From EU Knowledge Graph
Revision as of 15:43, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q118688 in Poland
Language Label Description Also known as
English
Energy modernisation of public utility buildings of the City of Jasła
Project Q118688 in Poland

    Statements

    0 references
    8,643,226.37 zloty
    0 references
    2,074,374.33 Euro
    13 January 2020
    0 references
    10,168,501.76 zloty
    0 references
    2,440,440.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 February 2016
    0 references
    29 December 2017
    0 references
    MIASTO JASŁO
    0 references
    0 references
    Przedmiotem projektu jest modernizacja energet. 7 budynków użyteczności publicznej w Jaśle: Urząd Miasta (m.in. ocieplenie ścian, stropu, stropodachu, lukarn, wymiana okien i drzwi zewn., wymiana grzejników, montaż zaworów termostat., wymiana przewodów, izolacja przewodów, wymiana kotła na wysokosprawny 166 kW, wymiana oświetlenia, inst. odgromowa); SP nr 2 (m.in. docieplenie ścian, stropodachu, wymiana okien i drzwi, docieplenie kominów, demontaż i montaż nowych elementów inst. CO, wymiana inst. elekt. i opraw oświetleniowych, inst. odgromowa); SP nr 4 (m.in. docieplenie ścian, stropodachu, wymiana stolarki okiennej i drzwiowej, wykonanie obróbek blacharskich, remont kominów, wymiana oświetlenia, montaż wywietrznika wraz z rekuperatorem, modernizacja inst. CO); SP nr 11 (m.in. docieplenie ścian, stropodachu, stropu żelbetowego, kominów, przebudowa szachtów piwniczych, wymiana stolarki okienno-drzwiowej, prace przy inst. CO, inst. odgromowa, wymiana oświetlenia); ZSM nr 5 (m.in. docieplenie ścian i dachu, wymiana stolarki drzwiowej i okiennej, docieplenie kominów, inst. CO - demontaż, wymiana kotła na gazowy 200 kW, montaż systemu – grzejników, głowic termostatycznych, wykonanie inst. elekt., miedzianej, puszek rozdzielczych, wymiana opraw, inst. odgromowa); budynek siłowni MOSiR (m.in. docieplenia ścian i dachu, docieplenie kominów, wymiana stolarki okienno-drzwiowej, inst. CO - wodna pompowa wraz z armaturą i grzejnikami, wymiana oświetlenia, inst. odgromowa); budynek techniczno-administracyjny MOSiR (m.in. docieplenie ścian i dachu, docieplenie kominów, wymiana stolarki okienno-drzwiowej, wymiana grzejników, modernizacja oświetlenia, inst. odgromowa). Cel strategiczny projektu: zmniejszenie zapotrzebowania na energię oraz poprawa efektywności energet. obiektów. Wskaźnik energii pierwotnej 984,825 [kWh/(m2rok)], zmniejszenie zapotrzebowania na zużycie energii o 60,85 %. Wskazany zakres robót jest zgodny z optymalnymi wariantami z audytów energ. budynków. (Polish)
    0 references
    The subject of the project is the modernisation of the energet. 7 public buildings in Jaslo: City Hall (e.g. wall warming, ceiling, ceiling, glazing, window and exterior doors, replacement of radiators, installation of thermostat valves, wiring, insulation of wires, replacement of boiler for high performance 166 kW, replacement of lighting, lightning protection); SP nr 2 (including warming of walls, ceiling, window and door replacement, chimney warming, dismantling and assembly of new elements inst. What, replacement of electrical equipment and luminaires, lightning protection); SP nr 4 (e.g. insulation of walls, ceiling, replacement of window and door carpentry, metalworking, chimney repair, lighting replacement, installation of vents with recuperator, modernisation of inst. CO; SP nr 11 (e.g. warming of walls, ceiling, reinforced concrete ceiling, chimneys, reconstruction of cellar chess, replacement of window and door carpentry, work on the inst. What, lightning protection, lighting exchange); ZSM No 5 (e.g. insulation of walls and roof, replacement of door and window joinery, chimney warming, inst. What – dismantling, replacement of the boiler for gas 200 kW, installation of the system – radiators, thermostatic heads, manufacture of electrical, copper, distribution cans, exchange of luminaires, lightning protection); building of the MOSiR gym (e.g. insulation of walls and roof, warming of chimneys, replacement of window and door carpentry, inst. Co – water pump with fittings and radiators, lighting exchange, lightning protection); technical and administrative building MOSiR (e.g. insulation of walls and roof, warming of chimneys, replacement of window and door joinery, replacement of radiators, modernisation of lighting, lightning protection). Strategic objective of the project: reduce energy demand and improve energy efficiency of objects. Primary energy ratio 984,825 [kWh/(m2year)], reduction of energy consumption by 60,85 %. The scope of works indicated is consistent with optimal variants of energy audits of buildings. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.02.00-18-0056/16
    0 references