Connector Western Node A-4 – Straszecin – Dębica (Q119056)

From EU Knowledge Graph
Revision as of 07:00, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q119056 in Poland
Language Label Description Also known as
English
Connector Western Node A-4 – Straszecin – Dębica
Project Q119056 in Poland

    Statements

    0 references
    14,738,153.22 zloty
    0 references
    3,537,156.77 Euro
    13 January 2020
    0 references
    17,339,003.82 zloty
    0 references
    4,161,360.92 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 March 2017
    0 references
    7 December 2018
    0 references
    POWIAT DĘBICKI
    0 references
    Celem ogólnym projektu jest poprawa powiązań komunikacyjnych i systemu komunikacji publicznej w województwie podkarpackim poprzez zwiększenie dostępności komunikacyjnej Powiatu Dębickiego. W tym celu na terenie Gminy Żyraków wybudowany zostanie łącznik do Węzła Zachodniego A4 Dębica – Zachód. Łącznik uzupełni braki w sieci drogowej, przełoży się na wzrost płynności ruchu i dostępności do sieci dróg wyższego rzędu oraz poprawę bezpieczeństwa.Zakres rzeczowy zadania inwestycyjnego obejmuje:• budowę nowego odcinka drogi długości ok. 1,80 km o parametrach technicznych jak dla drogi klasy G i konstrukcji nawierzchni dostosowanej do kategorii ruchu KR4, wraz z budową chodników i ścieżki rowerowej, oświetlenia ulicznego oraz systemu odwodnienia drogi,• budowę skrzyżowań typu rondo w miejscach włączenia projektowanego łącznika do drogi powiatowej nr 1180R i węzła A4 Dębica-Zachód, oraz drogi powiatowej nr 1290R wraz korektą dojazdów do rond,• korekta dojazdu drogi powiatowej nr 1180R (odcinek 0) do projektowanego ronda na długości ok. 990m (początek w km 3+440):o 830m od centrum ronda w kierunku Dębicy,o 160m od centrum ronda w kierunku Żyrakowa,• korekta dojazdu drogi prowadzącej do węzła autostradowego A4 Dębica-Zachód do projektowanego ronda na długości ok. 56m od centrum ronda,• korekta dojazdu drogi powiatowej nr 1290R do projektowanego ronda na długości ok. 405m (początek w km 1+770,70):o 130m od centrum ronda w kierunku Dębicy,o 275m od centrum ronda w kierunku Straszęcina.Istotnym czynnikiem decydującym o konieczności podjęcia planowanego przedsięwzięcia jest stworzenie infrastruktury drogowej niezbędnej do ukierunkowania ruchu samochodowego zjeżdżającego z węzła Dębica-Zachód autostrady A4 co polepszy organizację ruchu i czas przejazdu na odcinkach objętych zakresem inwestycji. Budowa łącznika będzie realizowana z myślą usprawnienia ruchu drogowego oraz zapewnienia jego bezpieczeństwa, a także zapewnienia bezpieczeństwa pieszym i rowerzystom. (Polish)
    0 references
    The general objective of the project is to improve communication links and the public transport system in Podkarpackie voivodship by increasing the communication accessibility of the Dębicki District. For this purpose, a link to the Western Node A4 Dębica – West will be built in the Zyraków commune. The connector will fill the gaps in the road network, translate into an increase in traffic flow and access to the network of higher order roads and improve safety.The material scope of the investment task includes:• construction of a new section of the road length approx. 1.80 km with technical parameters as for the G-class road and surface structure adapted to the KR4 traffic category, including the construction of pavements and cycle paths, street lighting and road drainage system,• construction of junctions of a roundabout type at the places of integration of the design connector to district road No. 1180R and node A4 Dębica-West, and district road No. 1290R with correction of access to the roundabout,• correction of the access to the district road no.1180 990 m (beginning in km 3+ 440):about 830 m from the centre of the roundabout in the direction of Dębica, about 160 m from the centre of the roundabout in the direction of Żyrakow,• correction of the road leading to the Dębica-West motorway junction to the designed roundabout approx. 56 m from the centre of the roundabout,• correction of the access of district road No 1290R to the designed roundabout approx. 405 m (beginning in km 1 + 770.70):about 130 m from the centre of the roundabout in the direction of Dębica, about 275 m from the centre of the roundabout in the direction of Straszecin.An important factor determining the need to undertake the planned project is to create the road infrastructure necessary to direct the traffic from the Dębica-West junction of the A4 motorway, which will improve the organisation of traffic and travel time on the sections falling within the scope of the investment. The construction of the connector will be implemented with a view to improving road traffic and ensuring its safety, as well as ensuring the safety of pedestrians and cyclists. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.05.01.00-18-0011/16
    0 references