Conservation works on the Ruin Castle in Rytra (Q112755)

From EU Knowledge Graph
Revision as of 14:06, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q112755 in Poland
Language Label Description Also known as
English
Conservation works on the Ruin Castle in Rytra
Project Q112755 in Poland

    Statements

    0 references
    1,367,104.75 zloty
    0 references
    328,105.14 Euro
    13 January 2020
    0 references
    1,953,076.55 zloty
    0 references
    468,738.37 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    1 April 2017
    0 references
    28 February 2019
    0 references
    GMINA RYTRO
    0 references
    0 references
    Podstawowym problemem konserwatorskim reliktów murów zamku Rytro jest dezintegracja zaprawy i przepalonych w ostatnim pożarze kamieni licowych w wielu miejscach zamku. Powierzchnie lica odspojone od trzonu muru musza zostać przemurowane, możliwie przy wtórnym użyciu tych samych kamieni. Na powierzchni nie podlegającej przemurowaniu wykonana musi być wymiana osypującej się zaprawy. Wymagana tu jest wymiana zaprawy możliwie głęboko w strukturze muru. Spękania strukturalne i rozstępy muszą być wypełnione specjalną zaprawą poprzez wprowadzenie iniekcyjne. Osłabione wskutek przepalenia kamienie licowe proponuje się pozostawić in situ, ale wzmocnić preparatami konserwatorskimi. Kamienie całkowicie zniszczone przez ogień należy wymienić na nowe. Całość lica i strzępia murowe wymagają zabezpieczenie przeciwwilgociowego. Szczególnie ważne jest wykonanie przepony nieprzepuszczalnej na koronie murów. Proponowane prace konserwatorskie w rozumieniu technicznym dotyczą całości zachowanych jeszcze ruin zamku wraz z najbliższym otoczeniem. Muszą one być objęte pełnym zakresem postępowania konserwatorskiego, mającego na celu utrwalenie substancji zabytkowej poprzez przeprowadzenie niezbędnych zabiegów konserwatorskich. Planowany zakres projektu obejmuje następujące elementy: - Mur obwodowy; Odcinek północny, nadbudowa korony muru w pełnej szerokości o 0,5m w uporządkowanym wątku, naprawa lica od strony dziedzińca (wymiana spin i zniszczonych kamieni), założenie barierek ochronnych, Odcinek południowy, nadbudowa muru w pełnej szerokości o 1,5m, założenie barierek ochronnych. - Ostróża, wyrównanie korony muru do ustalonej rzędnej, wykonanie stropu żelbetowego, podniesienie muru ponad stropem o 1,2m, zamontowanie portalu w wejściu, wykonanie posadzki kamiennej we wnętrzu, opracowanie wnętrza do wprowadzenia funkcji użytkowej, - Gmach zachodni, wykonanie pomieszczenia piwnicy w partii południowej z uczytelnieniem reliktów bramy pierwot (Polish)
    0 references
    The main conservation problem of the relics of the walls of Rytro Castle is the disintegration of mortar and burnt through in the last grain stone fire in many places of the castle. The faces decoupled from the core of the wall must be walled, possibly with the same stones being used again. On a non-painable surface, a replacement of the mortar shall be carried out. It is necessary to replace the mortar as deep as possible in the structure of the wall. Structural cracks and stretch marks must be filled with special mortar by injecting. Weakened by burnout, it is proposed to leave the grain stones in situ, but strengthen with conservatory preparations. The stones completely destroyed by the fire should be replaced with new ones. The whole brick and masonry shreds require damp protection. It is particularly important to make an impermeable diaphragm on the wall crown. The proposed conservation works in the technical sense concern the entire ruins of the castle with its immediate surroundings. They must be covered by the full scope of conservation proceedings aimed at conserving the historical substance by carrying out the necessary conservation procedures. The proposed scope of the project shall include the following elements: — Peripheral wall; The northern section, the superstructure of the crown of the wall in full width of 0.5 m in an orderly thread, the repair of the wall from the courtyard side (replacement of spin and destroyed stones), the establishment of protective barriers, the southern section, the superstructure of the wall in full width by 1.5 m, the establishment of protective barriers. — Blade, levelling of the wall crown to a fixed order, construction of a reinforced concrete ceiling, raising the wall above the ceiling by 1.2 m, mounting the portal in the entrance, making a stone floor in the interior, designing the interior for the introduction of a functional function, – Western building, construction of a cellar room in the southern part with the relics of the priwot gate (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.06.01.01-12-0148/16
    0 references