Modernisation and expansion of the water and sewage management system in Skępe City and Municipality (Q98466)

From EU Knowledge Graph
Revision as of 10:37, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q98466 in Poland
Language Label Description Also known as
English
Modernisation and expansion of the water and sewage management system in Skępe City and Municipality
Project Q98466 in Poland

    Statements

    0 references
    3,102,019.28 zloty
    0 references
    744,484.63 Euro
    13 January 2020
    0 references
    8,101,382.3 zloty
    0 references
    1,944,331.75 Euro
    13 January 2020
    0 references
    38.29 percent
    0 references
    1 April 2019
    0 references
    31 August 2021
    0 references
    MIASTO I GMINA SKĘPE
    0 references
    0 references
    W ramach projektu: „Modernizacja i rozbudowa systemu gospodarki wodno-ściekowej na terenie Miasta i Gminy Skępe” zaplanowano do realizacji 2 zadania:Zadanie nr 1: „Budowa sieci kanalizacyjnej na ulicach Polnej, Widok, Widokowej, Kujawskiej, Sportowej, Kwiatowej, 21 stycznia, Płockiej, Poziomkowej, Storczykowej, Piaskowej, Kalinowej, Jaśminowej oraz w miejscowości Józefkowo”W ramach zadania zaplanowano do budowy sieć kanalizacji sanitarnej z przyłączami w miejscowości Skępe dla ulic: Polnej (od strony ul. Klasztornej), Widok, Widokowej, Kujawskiej, Sportowej, Kwiatowej, Płockiej, 21 Stycznia, Poziomkowej, Storczykowej, Kalinowej, Jaśminowej, Okopowej, Tulipanowej, oraz pobliskiej wsi Józefkowo. System kanalizacji projektowany do obsługi terenów położonych przy w/w ulicach. Zestawienie długości rurociągów i przepompowni:- sieć grawitacyjna kanalizacji sanitarnej – O200 – L= 5838,5m- sieć tłoczna kanalizacji sanitarnej – O50 - L=5,0m- sieć tłoczna kanalizacji sanitarnej – O63 - L=234,0m- sieć tłoczna kanalizacji sanitarnej – O75 - L=60m- sieć tłoczna kanalizacji sanitarnej – O90 - L=964m- przepompownie ścieków – kpl. 5 + 1 istn.- przyłącza grawitacyjne kanalizacji sanitarnej O160, ?L=1027,0m (szt. 243)- przyłącza grawitacyjne kanalizacji sanitarnej O200, ?L=56,5m (szt. 13)Zadanie nr 2: „Budowa Stacji Uzdatniania Wody w miejscowości Skępe, na terenie działek oznaczonych numerami ewidencyjnymi 293/4; 293/6; 293/7”Istniejący budynek stacji przewidziano do rozebrania wraz z dwoma zbiornikami retencyjnymi wody i odstojnikami.Zaprojektowano nowy parterowy budynek SUW, parterowy budynek techniczny, trzy nadziemne, stalowe zbiorniki retencyjne wody o średnicy zewn. 4,80 m (z ociepleniem), posadowione na żelbetowym fundamencie, wyniesionym na wys. 10 cm ponad teren. Zbiorniki ocieplone wełną mineralną o grubości 10 cm w płaszczu z blachy stalowej trapezowej, powlekanej. (Polish)
    0 references
    Within the framework of the project: “Modernisation and extension of the water and sewage management system in the City and the Skępe Municipality” is planned to perform 2 task: “Construction of sewage networks on the streets of Polna, View, View, Kujawska, Sportowa, Kwiatowa, 21 January, Płocka, level, Storczykowa, Piaskowa, Kalinowa, Jaśminowa and in Józefkowo”As part of the task, a sewerage network with connections in Skępe for streets was planned: The field (from the side of ul. Convent), View, View, Kujawska, Sportowa, Kwiatowa, Płocka, 21 January, level, Storczykowa, Kalinowa, Jaśminowa, Okopowa, Tulipowa, and nearby village Józefkowo. Sewage system designed to handle areas located in the above-mentioned streets. Combination of pipelines and pumping plants:- Gravity network of sanitary sewage system – O200 – L= 5838.5 m- sanitary drainage system – O50 – L=5.0m- sanitary drainage system – O63 – L=234.0m- sanitary drainage system – O75 – L=60m- sanitary drainage system – O90 – L=964m- sewage pumping plants – kpl. 5 + 1 istn.- gravitational connections of the sanitary sewer O160,?L=1027,0 m (pc. 243)- gravitational connections of sanitary sewage system O200,?L=56,5 m (pc. 13. Task No 2: “Construction of Water Treatment Station in Skępe, on the premises of parcels marked with registration numbers 293/4; 293/6; 293/7"The existing station building is planned to be demolished with two water retention tanks and standers.A new one-storey SUW building has been designed, a one-storey technical building, three above-ground water retention tanks with external diameter. 4.80 m (with warming), placed on reinforced concrete foundation, elevated to height. 10 centimeters above ground. 10 cm thick mineral wool tanks in a trapezoidal steel coated coat. (English)
    15 October 2020
    0 references

    Identifiers

    RPKP.04.03.00-04-0023/18
    0 references