Thermal modernisation of public utility buildings of the Municipality of Malczyce: primary schools with junior high school and kindergarten (Q95530)

From EU Knowledge Graph
Revision as of 09:07, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q95530 in Poland
Language Label Description Also known as
English
Thermal modernisation of public utility buildings of the Municipality of Malczyce: primary schools with junior high school and kindergarten
Project Q95530 in Poland

    Statements

    0 references
    2,351,028.11 zloty
    0 references
    564,246.75 Euro
    13 January 2020
    0 references
    2,765,915.42 zloty
    0 references
    663,819.7 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 April 2016
    0 references
    31 October 2018
    0 references
    GMINA MALCZYCE
    0 references
    Przedmiotem projektu jest termomodernizacja 2 budynków użyteczności publicznej, stanowiących własność Gminy Malczyce: szkoły podstawowej z gimnazjum oraz publicznego przedszkola. Obiekty zlokalizowane są w miejscowości Malczyce, gm. Malczyce, pow. średzki, woj. dolnośląskie. W ramach projektu przeprowadzone zostaną prace w budynkach: I. Przedszkola: wymiana okien, drzwi zewn., docieplenie ścian zewn. i stropodachu, uzupełnienie systemu zarządzania energią o licznik ciepła, prace towarzyszące - wydatki niekwalifikowane; II. Szkoły podstawowej z gimnazjum: wymiana kotłowni węglowej na biomasę, docieplenie stropodachu i ścian zewn. sali gimnastycznej oraz ścian zewn. szkoły, wymiana: przeszkleń, drzwi stalowych, drewnianych, okien, montaż zaworów termostatycznych, zastosowanie automatyki pogodowej i czasowej, opomiarowanie zużycia energii, prace towarzyszące - wydatki niekwalifikowane; Zakres prac oparty został o najkorzystniejszy wariant opisany w audycie energet. Dzięki realizacji projektu osiągnięte zostaną efekty: ekonomiczne (zmniejszenie kosztów eksploatacji), ekologiczne (zmniejszenie zapotrzebowania na energię cieplną oraz emisji CO2). Projekt przyczyni się do zwiększenia świadomości ekologicznej poprzez bezkosztowe przeprowadzenie szkoleń: -pracowników techn. w zakresie obsługi urządzeń/syst. grzewczych i wentylacyjnych; - nauczycieli i uczniów w zakresie edukacji ekolog., dbałości o równowagę w środowisku poprzez ograniczenie emisji szkodliwych substancji, oszczędzanie energii oraz eksploatacji pomieszczeń z uwzględnieniem zasady regulacji temp i wietrzenia pomieszczeń, etc. Projekt nie wymaga pozwolenia na budowę. Wójt Gminy Malczyce w dn. 05.04.2016 dokonał zgłoszenia zamiaru rozpoczęcia robót bud. polegających na termomodernizacji budynków oraz w dn.08.04.2016 r.zgłoszenia zamiaru rozpoczęcia robót budowlanych polegających na wymianie instalacji centralnego ogrzewania, kotła i instalacji elektrycznej w budynkach. (Polish)
    0 references
    The subject of the project is the modernisation of 2 public utility buildings owned by the Municipality of Malczyce: elementary school with junior high school and public kindergarten. The facilities are located in Malczyce, Malczyce, Średzki, Dolnośląskie Voivodeship. As part of the project, works will be carried out in buildings: I. kindergartens: replacement of windows, external doors, insulation of external walls and ceilings, supplementing the energy management system with a heat counter, accompanying work – ineligible expenditure; II. Elementary school in middle school: replacement of coal boiler room for biomass, warming of ceilings and outer walls of the gym and outer walls of schools, exchange: glazing, steel, wooden doors, windows, installation of thermostatic valves, use of weather and time automation, measuring energy consumption, accompanying work – ineligible expenditure; The scope of the work is based on the most favourable option described in the energet audit. Thanks to the implementation of the project, the results will be achieved: economic (reduction of operating costs), green (reduction of demand for heat and CO2 emissions). The project will increase environmental awareness through cost-free training: —techn. workers in the field of operation of heating and ventilation equipment/systems; — teachers and pupils in the field of ecologist education., care for environmental sustainability by reducing emissions of harmful substances, saving energy and operation of the premises, taking into account the principle of temperature regulation and ventilation of rooms, etc. The project does not require a construction permit. Mayor of Malczyce commune in dn. 05.04.2016 notified the intention to start construction works consisting of thermal modernisation of buildings and on 08.04.2016 notification of the intention to start construction works consisting of the replacement of central heating, boiler and electrical installations in buildings. (English)
    15 October 2020
    0 references

    Identifiers

    RPDS.03.03.01-02-0052/16
    0 references