Construction of micro-installations of PV prosumenckie in the area of Dzierżoniowski County. (Q95389)

From EU Knowledge Graph
Revision as of 08:52, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q95389 in Poland
Language Label Description Also known as
English
Construction of micro-installations of PV prosumenckie in the area of Dzierżoniowski County.
Project Q95389 in Poland

    Statements

    0 references
    3,144,608.8 zloty
    0 references
    754,706.11 Euro
    13 January 2020
    0 references
    3,699,539.76 zloty
    0 references
    887,889.54 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2017
    0 references
    31 October 2018
    0 references
    POWIAT DZIERŻONIOWSKI
    0 references
    Przedmiotem projektu jest kompleksowe uzyskanie dostępu do alternatywnego źródła energii pochodzącego z energii słonecznej. Projekt polegać będzie na budowie mikroinstalacji PV prosumenckich w 13 obiektach (w których skład wchodzą instalacje zamontowane na 17 budynkach, 1 instalacja na zadaszeniu parkingu i 3 instalacje na trackerach wolnostojących). Obiekty będące instytucjami użytku publicznego (m. in. szkoły) wchodzą w skład jednostek organizacyjnych powiatu dzierżoniowskiego. Efektem wykonania projektu będzie zwiększenie udziału energii elektrycznej pochodzącej z odnawialnych źródeł. Bezpośrednio przyczyni się to do obniżenia kosztów za zużytą, na potrzeby własne instytucji użytku publicznego, energię. Ponadto wyposażenie tych obiektów w instalacje stanowiące wzorcowe przykłady demonstracyjne, będące najnowszymi rozwiązaniami w tej dziedzinie, które zapewnią uzyskanie najwyższych efektów ekologicznych, przyczyni się do promowania korzyści płynących z zastosowania technologii OZE wśród lokalnej społeczności. Dodatkowo wszystkie instalacje będą wyposażone w moduły komunikacyjne służące, głównie obiektom oświatowym, w procesie edukacji z zakresu ekologii i fizyki. Moduły komunikacyjne wyposazone będą w moduły dostępu do danych i wizualizacji, które ponadto będą promować korzyści płynące z zastosowania technologii OZE wśród szerokiej grupy odbiorców projektu. Przede wszystkim instalacje te przyczynią się do ograniczenia niskiej emisji poprzez redukcję zapotrzebowania na energię ze źródeł nieodnawialnych. Zakres rzeczowy projektu obejmuje: - wykonanie prac projektowych [13 kompletów dokumentacji technicznej, dla 13 obiektów], - roboty budowlano – montażowe związane instalacją systemów paneli fotowoltaicznych [ 1584 szt.] w systemie off-grid z bateriami akumulatorowymi, - rozruch wybudowanej infrastruktury, - prowadzenie systemu monitoringu służącego do wizualizacji danych i zarządzania informacją przez Internet. (Polish)
    0 references
    The aim of the project is to obtain comprehensive access to an alternative source of energy from solar energy. The project will consist of the construction of PV prosumer micro-installations in 13 facilities (including installations installed on 17 buildings, 1 installation on the roof of the car park and 3 installations on free-standing trackers). Buildings that are public use institutions (including schools) are part of the organizational units of Dzierżoniowski County. The project will result in an increase in the share of electricity from renewable sources. This will directly contribute to lowering the costs for the energy consumed, for the own use of public use, by the public authorities. Moreover, equipping these facilities with exemplary demonstration installations, which are the latest solutions in this field, which will ensure the highest environmental performance, will contribute to promoting the benefits of RES technologies among the local community. In addition, all installations will be equipped with communication modules, mainly for educational facilities, in the ecology and physics education process. Communication modules will be equipped with data access and visualisation modules, which will also promote the benefits of the use of RES technology among a wide range of project recipients. Above all, these installations will contribute to reducing low emissions by reducing the demand for non-renewable energy sources. The project’s material scope includes: — execution of design works [13 sets of technical documentation, for 13 objects], – construction and assembly works related to installation of photovoltaic panel systems [1584 pieces] in off-grid system with battery batteries, – commissioning of built infrastructure, – running a monitoring system for data visualisation and information management over the Internet. (English)
    15 October 2020
    0 references

    Identifiers

    RPDS.03.01.00-02-0054/16
    0 references