Insulated network 6 kV m. Rzeszowa at a voltage of 15 kV – modernisation of three 110/SN stations: Rzeszów Staromieście, Staroniva and Rzeszów Centralna. (Q86097)

From EU Knowledge Graph
Revision as of 21:25, 30 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q86097 in Poland
Language Label Description Also known as
English
Insulated network 6 kV m. Rzeszowa at a voltage of 15 kV – modernisation of three 110/SN stations: Rzeszów Staromieście, Staroniva and Rzeszów Centralna.
Project Q86097 in Poland

    Statements

    0 references
    17,852,316.83 zloty
    0 references
    4,284,556.04 Euro
    13 January 2020
    0 references
    27,000,666.09 zloty
    0 references
    6,480,159.86 Euro
    13 January 2020
    0 references
    66.12 percent
    0 references
    15 June 2016
    0 references
    30 June 2019
    0 references
    PGE DYSTRYBUCJA S.A.
    0 references
    0 references

    50°0'25.9"N, 22°0'35.6"E
    0 references
    Projekt będzie realizowany w woj. podkarpackim, na terenie m. Rzeszowa w trzech lokalizacjach. Przedmiotem Projektu jest modernizacja trzech stacji WN/SN: Rzeszów Centralna, Rzeszów Staromieście oraz Staroniwa, której celem jest przystosowanie istniejącej sieci 6 kV znajdującej się na terenie miasta Rzeszowa do pracy na napięciu 15 kV. W ramach projektu na stacjach zostaną wymienione transformatory 110/SN na transformatory dwuuzwojeniowe o przekładni 110/15 kV. Z uwagi m.in. na znaczny stopień wyeksploatowania urządzeń 110 kV oraz potrzebę zwiększenia pewności zasilania, w stacjach Rzeszów Centralna i Staroniwa zostanie przebudowana rozdzielnia 110 kV do układu H 5 w technologii GIS oraz przebudowana rozdzielnia SN. W stacji WN/SN Rzeszów Centrala i Staroniwa wybudowany zostanie nowy budynek stacji z wnętrzową rozdzielnią 110 kV w systemie GIS, rozdzielnią 15 kV, stanowiskami transformatorów mocy, transformatorów PW i DG, stanowiskami BKR, innymi pomieszczeniami niezbędnymi do funkcjonowania GPZ. W stacji Rzeszów Staromieście zabudowana zostanie nowa rozdzielnia 15 kV. We wszystkich stacjach zostaną wymienione także transformatory mocy (po dwa w każdej stacji). (Polish)
    0 references
    The project will be implemented in the Podkarpackie Voivodeship, on the territory of Rzeszów in three locations. The subject of the Project is the modernisation of three WN/SN stations: Rzeszów Centralna, Rzeszów Staromieście and Staroniwa, whose aim is to adapt the existing 6 kV network located in the town of Rzeszów to work at a voltage of 15 kV. As part of the project, the 110/SN transformers will be replaced with 110/15 kV double winding transformers. Due to, among other things, the high level of operation of 110 kV devices and the need to increase power security, the Rzeszów Central and Staroniwa stations will reconstruct the 110 kV switchgear for the H 5 system in GIS technology and reconstructed SN switching system. At WN/SN Rzeszów Station, Centrala and Staroniwa will build a new station building with internal 110 kV switching room in the GIS system, 15 kV switching room, power transformers, PW and DG transformers, BKR stations, other rooms necessary for the operation of the GPZ. At the Rzeszów Staromieście station a new 15 kV distribution room will be built. All stations will also be replaced with power transformers (two in each station). (English)
    14 October 2020
    0 references

    Identifiers

    POIS.07.01.00-00-0001/16