Construction of a natural and geological park with educational function in Bobowa (Q85816)

From EU Knowledge Graph
Revision as of 07:17, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q85816 in Poland
Language Label Description Also known as
English
Construction of a natural and geological park with educational function in Bobowa
Project Q85816 in Poland

    Statements

    0 references
    1,136,852.66 zloty
    0 references
    272,844.64 Euro
    13 January 2020
    0 references
    1,337,473.72 zloty
    0 references
    320,993.69 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 June 2019
    0 references
    GMINA BOBOWA
    0 references
    0 references
    0 references

    49°42'46.8"N, 20°57'27.4"E
    0 references
    Projekt zlokalizowany będzie w mieście Bobowa, Gmina Bobowa, pow. gorlicki, woj. małopolskie. Działka 399/4 znajduje się w płn-zach części miasta. Bezpośrednie otoczenie Parku stanowią ważne ośrodki życia społeczno-gospodarczego miasta: targowisko, sklepy, restauracje, droga woj. nr 981, linia i stacja kolejowa. Od centrum miasta przyszły park oddalony jest zaledwie o 1,5km. Na projekt złożą się roboty i usługi wg kategorii: 1) Wynagrodzenia za opracowanie planów i projektów: opracowanie dokumentacji projektowej i studium wykonalności - nieinfrastrukturalne. 2) Roboty budowlane - infrastrukturalne; wg kosztorysu 8 zadań: roboty agrotechniczne, zakładanie zieleni, rośliny, układ komunikacyjny, droga technologiczna, oczko wodne z fontanną, mała architektura, sieć wodociągowa i przyłącza. Wniosek o uzyskanie pozwolenia na budowę z 28.12.2016 r. 3) Informacja i promocja - nieinfrastrukturalne. 4) Nadzór budowlany - nieinfrastrukturalne. Zgodnie z "Wytycznymi w zakresie kwalifikowalności" za kwalifikowane uznano wydatki nieinfrastrukturalne oraz wydatki na: roboty agrotechniczne, zakładanie zieleni, rośliny. Realizacja części zadań infr. objęta jest limitem 30% udziału w wydatkach kwalifikowanych (wk): układ komunikacyjny, droga technologiczna, oczko wodne z fontanną, mała architektura zostały zaliczone do wk wyłącznie do wysokości 30% udziału. Niekwalifikowane zadanie: sieć wodociągowa i przyłącza. Wszystkie zostaną poniesione przez Gminę Bobowa, która jest właścicielem nieruchomości i będzie właścicielem powstałego majątku. Sposób i struktura zarządzania projektem w fazie realizacji związane są z Jednostką Realizującą Projekt. (Polish)
    0 references
    The project will be located in the town of Bobowa, Bobowa Municipality, Gorlicki, Małopolskie Voivodeship. Plot 399/4 is located in north-west part of the city. The immediate surroundings of the Park are important centers of the city’s socio-economic life: marketplace, shops, restaurants, road no. 981, line and railway station. The future park is only 1.5 km from the city centre. The project will consist of works and services according to the following categories: 1) Remunerations for drawing up plans and projects: development of project documentation and feasibility study – non-infrastructured. 2) Construction works – infrastructure; according to the estimate of 8 tasks: agrotechnical robots, greenery, plants, communication system, technological road, water mesh with fountain, small architecture, water supply network and connections. Application for construction permit from 28.12.2016 3) Information and promotion – non-infrastructured. 4) Construction supervision – non-infrastructured. Under the ‘Eligibility Guidelines’, non-infrastructural expenditure and expenditure for: agrotechnical robots, greenery, plants. The implementation of part of the infr. tasks is subject to a limit of 30 % of the share in eligible expenditure (wk): the communication system, the technological road, the water mesh with the fountain, the small architecture was included in the wk only up to 30 % of the share. Ineligible task: water mains and connections. All of them will be borne by Bobov Municipality, which owns the property and owns the property. The manner and structure of project management in the implementation phase are related to the Project implementation unit. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.05.00-00-0202/16
    0 references