Construction of a two-level junction of the railway of Tallinn-Narva and Sillamäe Harbour and the reconstruction of the section of the city of Sillamäe. Step I. (Q3067973)
Jump to navigation
Jump to search
Project Q3067973 in Estonia
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a two-level junction of the railway of Tallinn-Narva and Sillamäe Harbour and the reconstruction of the section of the city of Sillamäe. Step I. |
Project Q3067973 in Estonia |
Statements
5,996,223.51 Euro
0 references
7,054,380.6 Euro
0 references
85.0 percent
0 references
1 August 2016
0 references
1 January 2018
0 references
Transpordiamet
0 references
10916
0 references
Kavandatakse järgmisi LOd parandavad lahendused: rajatakse uus 9 m laiuse kattega tee; ehitatakse välja 3 eritasandilist ristmikku autoliiklusele ning eritasandiline raudteeristmik maantee läbilaskvuse suurendamiseks; korrastatakse samatasandilised ristmikud ja mahasõidud; ehitatakse välja koguja- ja kergliiklusteede võrgustik kogu projekti alal ning jalakäijate tunnel kohaliku ja kergliikluse eraldamiseks transiitliiklusest; korrastatakse teekattemärgistus ja teeviitade süsteem. (Estonian)
0 references
The following improvements to the LOD are proposed: a new 9 m wide road will be built; 3 different level junctions for car traffic will be built and a different level rail crossing will be built to increase road throughput; the same level intersections and exits shall be arranged; the construction of a network of collector and light traffic throughout the project area and a pedestrian tunnel to separate local and light traffic from transit traffic; the road marking and the road signage system shall be refurbished. (English)
16 August 2021
0 references
Les améliorations suivantes à la LSD sont proposées: une nouvelle route de 9 m de large sera construite; 3 jonctions de niveau différentes pour le trafic automobile seront construites et un passage à niveau différent sera construit pour augmenter le débit routier; les mêmes intersections et sorties doivent être disposées; la construction d’un réseau de collecteurs et de véhicules légers dans l’ensemble de la zone du projet et d’un tunnel piétonnier pour séparer le trafic local et léger du trafic de transit; le marquage routier et le système de signalisation routière doivent être remis à neuf. (French)
26 November 2021
0 references
Identifiers
2014-2020.10.01.16-0031
0 references