Renewal and modernisation of the Special Primary School in Bánovce nad Bebravou (Q3109778)

From EU Knowledge Graph
Revision as of 23:07, 29 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q3109778 in Slovakia
Language Label Description Also known as
English
Renewal and modernisation of the Special Primary School in Bánovce nad Bebravou
Project Q3109778 in Slovakia

    Statements

    0 references
    589,613.75 Euro
    0 references
    693,663.24 Euro
    0 references
    85.0 percent
    0 references
    12 January 2016
    0 references
    10 January 2020
    0 references
    Špeciálna základná škola
    0 references
    Q3121977 (Deleted Item)
    0 references

    48°43'7.46"N, 18°15'33.05"E
    0 references
    Hlavným cieľom projektu je úspora energií a emisií vo všetkých miestach spotreby objektu. Navrhovaná je z toho titulu realizácia stavebných opatrení a modernizácie technického vybavenia budovy v rozsahu Hĺbkovej obnovy (321/2014, §9). Ide o zníženie energetickej náročnosti budovy, zabezpečenie energetickej hospodárnosti objektu na úroveň energetickej triedy A1 v zmysle požiadaviek zákona č. 555/2005 Z. z. o energetickej hospodárnosti budov v znení neskorších predpisov (najmä zákona č. 277/2015 Z. z.) a vyhlášky MDVRR SR č. 364/2012 Z. z. a 324/2016 Z. z., požiadaviek na vnútorné prostredie budov v zmysle zákona č.259/2008 a požiadaviek OP KŽP. Predmetom riešenia je aj úprava vstupu pre zabezpečenie bezbariérového prístupu verejnosti do objektu.Stavebné práce sú zamerané na zateplenie obvodových stien, striech a vybudovanie bezbariérového prístupu. Rešpektované sú jestvujúce zrekonštruované výplne otvorov. Riešená je modernizácia technológií budovy so zahrnutím využívania obnoviteľných zdrojov energie. V nadväznosti na tieto opatrenia sú navrhované nevyhnutné stavebné úpravy, prestupy, podhľady, kapotáže a vysprávky povrchov. (Slovak)
    0 references
    The main objective of the project is to save energy and emissions at all places of the building’s consumption. It is therefore proposed to implement construction measures and modernisation of the building’s technical equipment in the scope of Deep Renovation (321/2014, §9). The aim is to reduce the energy intensity of the building, to ensure the energy performance of the building to the level of energy class A1 as required by Act No 555/2005 on the energy performance of buildings, as amended (in particular Act No 277/2015) and to Decree No 364/2012 of the Ministry of Transport of the Slovak Republic and No 324/2016, requirements for the internal environment of buildings within the meaning of Act No 259/2008 and the requirements of the OP KŽP. The subject of the solution is also modification of the entrance to ensure barrier-free public access to the building. Construction works are aimed at insulation of perimeter walls, roofs and construction of barrier-free access. Existing refurbished fillings of holes are respected. Modernisation of building technologies, including the use of renewable energy sources, is being addressed. Following these measures, the necessary modifications, transfers, suspended ceilings, hoodings and surface management are proposed. (English)
    28 September 2021
    0 references
    L’objectif principal du projet est d’économiser de l’énergie et des émissions dans tous les lieux de consommation du bâtiment. Il est donc proposé de mettre en œuvre des mesures de construction et de modernisation des équipements techniques du bâtiment dans le cadre de la rénovation profonde (321/2014, § 9). L’objectif est de réduire l’intensité énergétique du bâtiment, d’assurer la performance énergétique du bâtiment au niveau de la classe d’énergie A1 comme l’exigent la loi no 555/2005 sur la performance énergétique des bâtiments, telle que modifiée (notamment la loi no 277/2015) et le décret no 364/2012 du ministère des transports de la République slovaque et no 324/2016, les exigences relatives à l’environnement intérieur des bâtiments au sens de la loi no 259/2008 et les exigences de l’OP KŽP. L’objet de la solution est également la modification de l’entrée afin d’assurer l’accès public sans barrière au bâtiment. Les travaux de construction sont destinés à l’isolation des murs périmètres, des toits et de la construction d’accès sans barrière. Les remplissages de trous déjà rénovés sont respectés. La modernisation des technologies du bâtiment, y compris l’utilisation de sources d’énergie renouvelables, est à l’étude. À la suite de ces mesures, les modifications nécessaires, les transferts, les plafonds suspendus, les capots et la gestion des surfaces sont proposés. (French)
    27 November 2021
    0 references

    Identifiers

    310041H334
    0 references