126,878.35 Euro
0 references
149,268.65 Euro
0 references
85.0 percent
0 references
1 September 2020
0 references
1 February 2021
0 references
Obec Močenok
0 references
Miestom realizácie projektu je obec Močenok v okrese Šaľa. Bude sa jednať o výstavbu vodozádržných opatrení v obci Močenok za účelom zadržania dažďovej vody vsakovaním alebo retenciou v navrhovanom území a teda zníženiu celkového množstva vody pritekajúcej do verejnej dažďovej kanalizácie pri prívalových dažďoch s vplyvom na zníženie priebehu povodňovej vlny na napojených tokoch. Dotknutá parcela sa nachádza v centrálnej časti obce s prístupom z miestnej asfaltovej cesty. Na dotknutej parcele sa nachádza objekt Kultúrneho domu obkolesený trávnatými a lesnými porastami.V rámci projektu dôjde k realizácií nasledovných opatrení: Odvodnenie plochej strechy KD Tento stavebný objekt rieši návrh odvodnenia dažďovej vody plochej strechy objektu Kultúrneho domu, v súčasnosti je dažďová voda zvedená cez atikový žľab a tri fasádne zvody na južnej strane objektu do podzemnej kanalizačnej siete.V rámci tohto objektu je navrhovaná kombinácia nižšie uvedených opatrení pre retenciu dažďovej vody:SO 01.1 Zelená strecha KD 540,95 m2SO 01.2 Bioretenčné dažďové jazero 30 m2SO 01.3 Potrubie PVC DN 160 Bezpečnostný prepad z jazera do vsaku 1mSO 01.4 Potrubie drenážne DN 160 Odvedenie vody zo strechy KD do jazera 18 mSO 01.5 Potrubie drenážne DN 160 Odvedenie vody zo strechy KD do jazera 11 mSO 01.6 Potrubie drenážne DN 160 Odvedenie vody zo strechy KD do jazera 18 mNavrhovaná odvodňovaná plocha objektu SO 01: 540,95+30= 570,95 m2Vybudovaním zelenej strechy dôjde k zadržaniu dažďovej vody vsakovaním na streche KD recyklovanými geotextíliami za podpory záhradného substrátu a navrhovaných rastlín.Voda, ktorú nestihne zelená strecha zadržať bude zvedená cez atikový žľab do troch fasádnych dažďových zvodov, ktoré budú vedené pod zemou s vyústením do navrhovaného retenčného jazera, kde bude voda pri prívalových dažďoch ďalej vsakovať do podložia. Celý tento návrh počíta aj s bezpečnostným prepadom (v prípade dlhšie trvajúcich dažďoch) z retenčného jazera do vsakovacej ryhy dĺžky 10 m.Odvodnenie východnej šikmej strechy KDTento stavebný objekt rieši návrh odvodnenia dažďovej vody zo šikmej časti strechy objektu Kultúrneho domu n a východnej strane. V súčasnosti je dažďová voda zvedená cez odkvapový žľab a jeden zvod na východnej strane objektu na asfaltový chodník, odkiaľ odteká do priľahlej trávnatej plochy.V rámci tohto objektu je navrhovaná kombinácia nižšie uvedených opatrení pre retenciu a vsakovanie dažďovej vody t tejto časti strechy:SO 02.1 Potrubie PVC DN 160 Odvedenie vody zo strechy KD do záhrady 10 mSO 02.2 Bioretenčná dažďová záhrada 6m2SO 02.3 Potrubie PVC DN 160 Bezpečnostný prepad zo záhrady do vsaku 1mSO 02.4 Potrubie drenážne DN 160 na vsakovanie 10 mNavrhovaná odvodňovaná plocha objekt SO 01: 22,1 + 6 = 28,1 m2.Úpravou ukončenia dažďového zvodu dôjde k zadržaniu dažďovej vody vsakovaním priamo v blízkosti KD za podpory záhradného substrátu a navrhovaných rastlín v dažďovej záhrade.Voda, ktorú nestihne retenčná záhrada zadržať, bude zvedená bezpečnostným prepadom (v prípade dlhšie trvajúcich dažďov) z retenčnej záhrady do vsakovacej ryhy dĺžky 5m.Súčasťou tohto stavebného objektu je aj oprava strešnej krytiny KD, ktorá je v technicky nevyhovujúcom stave a pre zadržanie všetkej dažďovej vody dopadnutej na krytinu je potrebná výmena existujúcej krytiny a latovania, vrátane výmeny dažďového žľabu a zvodu.Odvodnenie plochej strechy prístavby KD a chodníkaTento stavebný objekt rieši návrh odvodnenia dažďovej vody z plochej časti strechy prístavby objektu Kultúrneho domu na severnej strane. V súčasnosti dažďová voda je zvedená cez atikový žľab a jeden zvod na severnej strane objektu na asfaltový chodník, odkiaľ odteká do priľahlej trávnatej plochy.V rámci tohto objektu je navrhovaná kombinácia nižšie uvedených opatrení pre retenciu a vsakovanie dažďovej vody z tejto časti strechy:SO 03.1 Potrubie PVC DN 160 Odvedenie vody zo strechy KD do nádrže 11 mSO 03.2 Podzemná retenčná nádrž 12 m3SO 03.3 Potrubie PVC DN 160 Bezpečnostný prepad z nádrže do vsaku 1 mSO 03.4 Potrubie drenážne DN 160 na vsakovanie 10 mSO 03.5 Potrubie PVC DN 160 Odvedenie vody z drenáže do nádrže 10 mSO 03.6 Potrubie drenážne DN 160 na vsakovanie z chodníka 56 mNavrhovaná odvodňovaná plocha objektu SO 01: 21,2 + 178,4+33,6=232,2m2Vybudovaním zelenej strechy dôjde k zadržaniu dažďovej vody vsakovaním priamo na streche KD recyklovaním geotextíliami za podpory záhradného substrátu a navrhovaných rastlín.Voda, ktorú nestihne zelená strecha zadržať bude zvedená cez atikový žľab do fasádneho dažďového zvodu, ktorý bude následne vedený pod zemou s vyústením do navrhovanej retenčnej nádrže, kde sa (Slovak)
0 references
The place of implementation of the project is the municipality of Močenok in the district of Šaľa. It will be the construction of water retention measures in the municipality of Močenok in order to retain rainwater by soaking or retaining in the proposed area and thus reducing the total amount of water flowing into the public rain sewer in case of torrential rainfall with the effect of reducing the course of the flood wave on the connected flows. The parcel concerned is located in the central part of the municipality with access from the local asphalt road. On the affected plot there is a building of the Cultural House surrounded by grassy and forest cover.The project will implement the following measures: Drainage of the flat roof KD This building object solves the proposal for the drainage of the rainwater of the flat roof of the building of the Cultural House, currently the rainwater is drained through the attic gutter and three facade downhills on the south side of the building to the underground sewerage network.The combination of the following measures for rainwater retention:SO 01.1 Green roof KD 540 is proposed within this building. 95 m2SO 01.2 Bioretention rain lake 30 m2SO 01.3 PVC pipe DN 160 Safety overflow from lake to bag 1mSO 01.4 Pipe drainage DN 160 Driving water from KD roof to lake 18 MSO 01.5 Pipe drainage DN 160 Drainage water from the roof KD to lake 11 MSO 01.6 Pipe drainage DN 160 Driving water from KD roof to lake 18 mProposed drainage area SO 01: 540.95+ 30= 570.95 m2Building the green roof will contain rainwater by soaking on the roof of KD recycled geotextiles with the support of the garden substrate and the proposed plants.Water that does not manage the green roof to contain will be drained through the attic trough into three facade rainfalls, which will be led below the ground with the result in the proposed retention lake, where the water will be further infused into the subsoil in the torrential rainfall. The whole proposal also foresees a safety overflow (in the case of prolonged rainfall) from the retention lake to the inlet groove of 10 m long.The drainage of the eastern inclined roof KDThis building is designed to drain the rainwater from the oblique part of the roof of the building of the Cultural House n and the east side. Currently, the rainwater is drained through the gutter and one downhill on the east side of the building on the asphalt path, from where it flows into the adjacent grassy area.In the framework of this building, a combination of the following measures for rainwater retention and infiltration of this part of the roof is proposed:SO 02.1 PVC pipe DN 160 Water drainage from the roof KD to the garden 10 MSO 02.2 Bioretention rain garden 6m2SO 02.3 Pipe PVC DN 160 Safety overflow from the garden to the bag 1mSO 02.4 Pipe drainage DN 160 for infiltration 10 mProposed drainage area object SO 01: 22,1 + 6 = 28,1 m².The correction of the end of the rainwater will result in the retention of rainwater by soaking directly near the KD with the support of the garden substrate and the proposed plants in the rain garden.Water that can not be held by the retention garden will be carried out by safety overflow (in the case of longer lasting rains) from the retention garden to the 5 m long line.The part of this building is also the repair of the roof covering KD, which is in a technically unsatisfactory condition and for the retention of all the rainwater impacted on the roofing is necessary to replace the existing roofing and lathing, including the replacement of the rain gutter and downhill.The drainage of the flat roof of the extension KD and the pavement This building object solves the proposal for the drainage of rainwater from the flat part of the roof of the building of the Cultural House on the north side. At present, rainwater is drained through an attic gutter and one downpipe on the north side of the building on the asphalt path, from where it flows into the adjacent grassy area.In this building, a combination of the following measures for rainwater retention and infiltration from this part of the roof is proposed:SO 03.1 PVC pipe DN 160 Driving water from the roof KD to the tank 11 MSO 03.2 Underground retention tank 12 m3SO 03.3 PVC pipe DN 160 Safety overflow from the tank into the bag 1 MSO 03.4 Pipe drainage DN 160 for infiltration 10 MSO 03.5 Pipe PVC DN 160 Driving water from drainage to tank 10 MSO 03.6 Pipe drainage DN 160 for infiltration from pavement 56 mProposed drainage area SO 01: 21,2 + 178,4+ 33,6=232,2m2Building the green roof, the rainwater will be intercepted directly on the roof of the KD by recycling geotextiles with the support of the garden substrate and the proposed plants.Water that cannot be held by the green roof will be drained through the attic gutter to the facade rainwater, which will then be led below the ground with the result in the proposed retention tank, where the (English)
28 September 2021
0 references
Le lieu de mise en œuvre du projet est la municipalité de Močenok, dans le district de Ša’a. Il s’agira de la construction de mesures de rétention d’eau dans la municipalité de Močenok afin de retenir l’eau de pluie par trempage ou rétention dans la zone proposée et ainsi réduire la quantité totale d’eau qui s’écoule dans les égouts pluviaux publics en cas de pluie torrentielle, ce qui aura pour effet de réduire le cours de la vague d’inondation sur les débits connexes. La parcelle concernée est située dans la partie centrale de la commune avec accès par la route asphaltée locale. Sur la parcelle touchée il y a un bâtiment de la Maison culturelle entourée de couvert herbeux et forestier.Le projet mettra en œuvre les mesures suivantes: Drainage du toit plat KD Cet objet de construction résout la proposition de drainage de l’eau de pluie du toit plat du bâtiment de la Maison culturelle, actuellement l’eau de pluie est drainée à travers la gouttière grenier et trois descentes de façade du côté sud du bâtiment jusqu’au réseau d’égouts souterrains.La combinaison des mesures suivantes pour la rétention d’eau de pluie:SO 01.1 Toit vert KD 540 est proposée à l’intérieur de ce bâtiment. 95 m2SO 01.2 biorétention lac de pluie 30 m2SO 01.3 tuyau de PVC DN 160 Débordement de l’eau du lac de drainage du lac de drainage 1mSO 1mSO 01.4 Tuyau DN 160 Driv D’eau de drainage du lac de drainage 160 MSO DSO DSO 540.95+ 30= 570,95 m2Bâtir le toit vert contiendra de l’eau de pluie en trempage sur le toit des géotextiles recyclés KD avec le support du substrat du jardin et des plantes proposées.L’eau qui ne gère pas le toit vert à contenir sera drainée à travers le grenier dans trois pluies de façade, qui seront conduits sous le sol avec le résultat du lac de rétention proposé, où l’eau sera encore infusée dans le sous-sol dans les pluies torrentielles. L’ensemble de la proposition prévoit également un débordement de sécurité (en cas de pluie prolongée) du lac de rétention à la rainure d’entrée de 10 m de long.Le drainage du toit incliné est KD Ce bâtiment est conçu pour drainer l’eau de pluie de la partie oblique du toit du bâtiment de la Maison culturelle n et du côté est. Actuellement, l’eau de pluie est drainée à travers la gouttière et une descente sur le côté est du bâtiment sur le chemin asphalté, d’où elle s’écoule dans la zone herbeuse adjacente.Dans le cadre de ce bâtiment, une combinaison des mesures suivantes pour la rétention d’eau de pluie et l’infiltration de cette partie du toit est proposée:SO 02.1 Tuyau PVC DN 160 DN 160 drainage de l’eau du toit KD au jardin 10 MSO 02.2 biorétention jardin pluvial 6m2SO 02.3 Tuyau PVC DN 160 Débordement de sécurité du jardin au sac 1mSO 02.4 drainage du tuyau DN 160 pour l’infiltration 10 mObjet de drainage projeté SO 01: 22,1 + 6 = 28,1 m².La correction de la fin de l’eau de pluie entraînera la rétention de l’eau de pluie par trempage directement près du KD avec le soutien du substrat du jardin de jardin et des plantes proposées dans le jardin pluvial.L’eau qui ne peut pas être conservée par le jardin de rétention sera effectuée par un débordement de sécurité (dans le cas de pluies plus durables) du jardin de rétention à la ligne de 5 m de long.La partie de ce bâtiment est également la réparation du toit couvrant KD, qui est dans un état techniquement insatisfaisant et pour la rétention de toute l’eau de pluie impactée sur la toiture est nécessaire pour remplacer la toiture existante et la laque, y compris le remplacement de la paroi de l’eau de pluie. À l’heure actuelle, l’eau de pluie est drainée par une gouttière grenier et une descente du côté nord du bâtiment sur le chemin asphalté, d’où elle s’écoule dans la zone herbeuse adjacente.Dans ce bâtiment, une combinaison des mesures suivantes pour la rétention et l’infiltration de l’eau de pluie de cette partie du toit est proposée:SO 03.1 Tuyau PVC DN 160 DN 160 Conduite de l’eau du toit KD jusqu’au réservoir 11 MSO 03.2 Réservoir de rétention souterraine 12 m3SO 03.3 Tuyau de PVC DN 160 Débordement de sécurité du réservoir dans le sac 1 MSO 03.4 drainage DN 160 pour l’infiltration 10 MSO 03.5 Tuyau PVC DN 160 Drivage de l’eau de drainage de l’eau de drainage de l’eau de drainage de l’O.M.M.O. 21,2 + 178,4+ 33,6=232,2m2Construire le toit vert, l’eau de pluie sera interceptée directement sur le toit du KD par le recyclage des géotextiles avec le support du substrat de jardin et des plantes proposées.L’eau qui ne peut être retenue par le toit vert sera drainée à travers la gouttière grenier à l’eau de pluie de façade, qui sera ensuite conduit sous le sol avec le résultat dans le réservoir de rétention proposé, où le (French)
27 November 2021
0 references
Identifiers
310021S489