Improvement of Vukovar Water Infrastructure — Phase II (Q2734615)

From EU Knowledge Graph
Revision as of 20:14, 29 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q2734615 in Croatia
Language Label Description Also known as
English
Improvement of Vukovar Water Infrastructure — Phase II
Project Q2734615 in Croatia

    Statements

    0 references
    221,837,433.0 Croatian kuna
    0 references
    28,838,866.29 Euro
    2 June 2021
    0 references
    314,144,301.0 Croatian kuna
    0 references
    40,838,759.13 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    25 July 2017
    0 references
    31 December 2021
    0 references
    VODOVOD GRADA VUKOVARA d.o.o.
    0 references
    0 references
    0 references

    45°20'15.47"N, 18°55'46.67"E
    0 references
    32000
    0 references
    Projekt obuhvaća ulaganja u sustave vodoopskrbe i odvodnje i pročišćavanja otpadnih voda u svrhu postizanja zahtjeva Direktiva EU. Ciljna skupina su stanovnici priključeni na postojeći sustav odvodnje te oni koji će nakon provedbe biti priključeni na sustav odvodnje te novi UPOV te svi stanovnici priključeni na vodoopskrbu. Provedba projekta podijeljena je u dvije faze kroz dva operativna programa (OPZO i OPKK). Ukupni prihvatljivi troškovi 2. faze (OPKK) su 314.14 milijuna HRK, od čega se 221.83 milijuna HRK-a odnosi na bespovratna sredstva. (Croatian)
    0 references
    The project covers investments in water and waste water supply and treatment systems to achieve the requirements of the EU Directives. The target group includes residents connected to the existing drainage system and those who will be connected after implementation, as well as a new UPOV and all inhabitants connected to a water supply. The implementation of the project is divided into two phases through two Operational Programmes (OPJO and OPCC). The total eligible costs of phase 2 (OPCC) are HRK 314.14 million, out of which 221.83 million HRK refers to grants. (English)
    3 June 2021
    0 references
    Le projet prévoit des investissements dans les systèmes d’approvisionnement en eau, d’assainissement et de traitement des eaux usées afin de satisfaire aux exigences des directives de l’UE. Le groupe cible est les habitants connectés au système de drainage existant et ceux qui seront connectés au système de drainage et au nouveau UPOV et tous les résidents connectés à l’approvisionnement en eau après la mise en œuvre. La mise en œuvre du projet est divisée en deux phases à travers deux programmes opérationnels (OPZO et OPKK). Le total des coûts éligibles de la phase 2 (OPKK) s’élève à 314,14 millions de HRK, dont 221,83 millions de HRK pour des subventions. (French)
    29 November 2021
    0 references

    Identifiers

    KK.06.4.2.08.0001
    0 references