Energy renovation of the Gorna Draganets’ regional school at Gornji Draganets 231, primary education (Q2733031)
Jump to navigation
Jump to search
Project Q2733031 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of the Gorna Draganets’ regional school at Gornji Draganets 231, primary education |
Project Q2733031 in Croatia |
Statements
543,587.5 Croatian kuna
0 references
1,054,434.38 Croatian kuna
0 references
85.0 percent
0 references
7 September 2018
0 references
7 November 2020
0 references
OSNOVNA ŠKOLA ČAZMA
0 references
43240
0 references
Projektom je predviđeno ostvarenje uštede godišnje potrebne energije za grijanje od 51,16 % što se postiže s: a) Sanacija krova iznad grijanog prostora (postavljanje mineralbe vune zamjena pokrova), b) Izolacija vanjskog zida grijanog prostora etics fasadnjm sustavom c) Projektom je predviđeno uklanjanje postojećih slojeva poda i postava toplinske izolacije poda d) zamjena drvene stolarije novom PVC stolarijom e) rampa za savladavanje visinskih razlika u skladu s Pravilnikom o osiguranju pristupačnosti građevina osobama s invaliditetom i smanjene pokretljivosti f) zamjena rasvjetnih tijela LED rasvjetom g) ugradnja plinskog kondenzacijskog kotla h) ugradnja toplovodnog sustava radijatorskog grijanja i) ugradnja ventilacija kuhinje. (Croatian)
0 references
The project provides for savings of 51.16 % per year of energy needed for heating to be achieved with: (a) Resolution of the roof above the heated space (positioning of the wool replacement with mineral wool replacement), b) Insulation of the external wall of the thermal space of the ETICS phase by system c) The design is intended to remove existing floor layers and floor insulation of the floor and D) the replacement of wooden joinery of carpentry of wood with new PVC joinery (s) under the Ordinance on ensuring accessibility of buildings to persons with disabilities and reduced mobility (f) replacement of LED lighting g) installation of gas condensing boiler (h), installation of the hot-water radiator and the galley ventilation installation. (English)
3 June 2021
0 references
Le projet prévoit une économie de 51,16 % de l’énergie annuelle nécessaire pour le chauffage, ce qui est réalisé par: a) Rénovation du toit au-dessus de l’espace chauffé (mise en place du couvercle de remplacement en laine minérale), b) isolation du mur extérieur de l’espace chauffé Système de façade ETICS c) Le projet prévoit la suppression des couches de sol existantes et l’installation d’une isolation thermique du plancher d) le remplacement de la menuiserie en bois par une nouvelle menuiserie en PVC e) la rampe pour surmonter les différences d’altitude conformément à l’ordonnance sur la garantie de l’accessibilité des bâtiments pour les personnes handicapées et la mobilité réduite f) le remplacement des appareils d’éclairage par un éclairage LED g) l’installation de chaudière à condensation au gaz h) l’installation d’un système de chauffage par radiateur thermique et) l’installation de la ventilation de cuisine. (French)
29 November 2021
0 references
Identifiers
KK.04.2.1.04.0168
0 references