Until RES 2016 — DOLB Trebnje — Centre Komunala Trebnje (Q3271248)
Jump to navigation
Jump to search
Project Q3271248 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Until RES 2016 — DOLB Trebnje — Centre Komunala Trebnje |
Project Q3271248 in Slovakia |
Statements
347,764.26 Euro
0 references
347,764.26 Euro
0 references
100.0 percent
0 references
28 December 2016
0 references
15 May 2019
0 references
KOMUNALA TREBNJE D.O.O.
0 references
8210
0 references
Namen izgradnje DOLB Trebnje - Center je povečati proizvodnjo energije iz obnovljivih virov in s tem delež obnovljivih virov energije v bilanci končne rabe energije. Cilj operacije je izgradnja daljinskega sistema v dolžini 1.129 m. Predvidena je vgradnja kotla moči 750kW (Fröling Lambdamat 750) + 350kW (Fröling TI 350), predvidena prodana količina toplote po zaključku operacije je 1.719.000 kWh na leto. (Slovenian)
0 references
The purpose of the construction of DOLB Trebnje — Centre is to increase the production of energy from renewable sources and thus the share of renewable energy sources in the final energy consumption balance. The aim of the operation is to build a remote system with a length of 1.129 m. It is planned to install a 750 kW boiler (Fröling Lambdamat 750) + 350 kW (Fröling TI 350), the estimated amount of heat sold after the completion of the operation is 1 719 000 kWh per year. (English)
12 October 2021
0 references
L’objectif de la construction de DOLB Trebnje — Centre est d’augmenter la production d’énergie à partir de sources renouvelables et donc la part des sources d’énergie renouvelables dans le bilan de consommation finale d’énergie. L’objectif de l’opération est de construire un système à distance d’une longueur de 1,129 m. Il est prévu d’installer une chaudière de 750 kW (Fröling Lambdamat 750) + 350 kW (Fröling TI 350), la quantité estimée de chaleur vendue après l’achèvement de l’opération est de 1 719 000 kWh par an. (French)
27 November 2021
0 references
Identifiers
OP20.01366
0 references