Prevent the risk of flooding and coastal erosion in the Ogre urban area by reconstructing the Ogre River’s non-sustaining protective dam (Q3057347)

From EU Knowledge Graph
Revision as of 18:12, 28 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl: translated_label)
Jump to navigation Jump to search
Project Q3057347 in Latvia
Language Label Description Also known as
English
Prevent the risk of flooding and coastal erosion in the Ogre urban area by reconstructing the Ogre River’s non-sustaining protective dam
Project Q3057347 in Latvia

    Statements

    0 references
    785,970.33 Euro
    0 references
    924,670.98 Euro
    0 references
    85.0 percent
    0 references
    28 July 2015
    0 references
    27 December 2015
    0 references
    Ogres novada pašvaldība
    0 references
    0 references

    56°49'9.12"N, 24°36'26.78"E
    0 references
    Projekta mērķis ir veikt Ogres upes neapplūstoša aizsargdambja Ogrē rekonstrukciju, samazināt augstu plūdu un krasta erozijas risku apdraudējumu pilsētas teritorijā, tādējādi nodrošinot iedzīvotājiem kvalitatīvu dzīves vidi un saimnieciskās darbības konkurētspēju un turpmāku pastāvēšanu, kā arī vides aizsardzību.Projekta mērķa grupa ir pašvaldība, pilsētas iedzīvotāji un komersanti, kurus ietekmējuši pirms tam bijušie plūdi un to radītās sekas. Projekta īstenošana novērsīs kanalizācijas sistēmu pārplūšanu un piesārņojuma nokļūšanu gruntsūdeņos un upē, tiks novērsti vides piesārņojuma riski un līdz ar to arī draudi 6020 iedzīvotāju veselībai.Projekta darbības:•Būvniecība - aizsargdambja Ogres pilsētā pārbūve, nostiprinot nogāzes, izbūvējot drenāžas sistēmas un dambja ietekmes uz gruntsūdens režīmu novērojumu (monitoringa) sistēmu, kā arī veicot labiekārtošanas darbus.•Būvuzraudzība – noslēgts līgums ar atbilstoši sertificētu izpildītāju, lai būvdarbi atbilstu visiem kvalitātes un būvdarbu normatīvu prasībām.•Autoruzraudzība - veiks tehniskā projekta izstrādātājs, lai būvdarbi notiktu saskaņā ar tehnisko projektu.•Publicitātes pasākumu nodrošināšana – veikti obligātie informatīvie un publicitātes pasākumi ievērojot vadlīnijas par ES Struktūrfondu projektu publicitāti t.i., publikācijas pašvaldības mājas lapā, lielformāta informācijas stends, pastāvīga informācijas plāksne.Projekta īstenošanas laiks pēc līguma noslēgšanas par projekta īstenošanu ir 5 mēneši un projekta kopējais budžets ir 1 403 157,74 EUR, no kuriem Eiropas reģionālā attīstības fonda finansējums ir 1 049 855.44 EUR. (Latvian)
    0 references
    The aim of the project is to reconstruct the Ogre river defence dam Ogre, to reduce the high risk of flooding and coastal erosion in the city area, thus ensuring high quality living environment and competitiveness of economic activity, as well as environmental protection.The target group of the project is local government, inhabitants of the city and merchants affected by previous floods and their consequences. Project implementation will prevent wastewater system flooding and pollution into groundwater and river, prevent risks of environmental pollution and thus also threats to the health of 6020 inhabitants.Project actions:•Construction – protective dam in Ogre City rebuilding of closing slopes, constructing drainage systems and dams impact on groundwater regime observation (monitoriing) system in the city of Ogre, for which construction works in Ogre City, strengthening of the slope, constructing project on a permanent project, building drainage systems and dams impact on groundwater regime observation (monitoriing) system, as well as carrying out general planning works in the building, project supervision for the project to be performed in accordance with the requirements of the project to be published. (English)
    15 July 2021
    0 references
    L’objectif du projet est de reconstruire un barrage protecteur non inflammable de la rivière Ogre à Ogre, afin de réduire les risques d’inondation et d’érosion côtière sur le territoire de la ville, assurant ainsi un environnement de vie de qualité et la compétitivité des activités économiques et la poursuite des activités économiques, ainsi que la protection de l’environnement. Le groupe cible du projet est la municipalité, les citadins et les commerçants touchés par les inondations précédentes et leurs conséquences. La mise en œuvre du projet empêchera l’écoulement des systèmes d’assainissement et de pollution dans les eaux souterraines et fluviales, les risques de pollution environnementale et donc la santé de 6020 habitants seront éliminés.Activités du projet:•Construction — reconstruction d’un barrage de protection dans la ville d’Ogre, renforcement des pentes, construction de systèmes de drainage et système de surveillance de l’impact du barrage sur le régime des eaux souterraines, ainsi que réalisation de travaux d’amélioration.•Contrôle de la construction — supervision — un contrat a été conclu avec un contractant dûment certifié afin que les travaux soient conformes à toutes les exigences de la réglementation de qualité et de construction. (French)
    25 November 2021
    0 references
    Ziel des Projekts ist es, einen nicht entflammbaren Schutzdamm des Flusses Ogre in Ogre zu rekonstruieren, das Risiko von Überschwemmungen und Küstenerosion auf dem Territorium der Stadt zu verringern, um so ein hochwertiges Lebensumfeld und die Wettbewerbsfähigkeit der wirtschaftlichen Aktivitäten und das Fortbestehen von wirtschaftlichen Aktivitäten sowie den Umweltschutz zu gewährleisten. Die Durchführung des Projekts wird den Fluss von Kanalisationen und die Verschmutzung in das Grundwasser und den Fluss verhindern, die Risiken der Umweltverschmutzung und damit die Gesundheit von 6020 Einwohnern beseitigen.Projektaktivitäten:•Konstruktion – Wiederaufbau eines Schutzdamms in der Stadt Ogre, Stärkung der Hänge, Errichtung von Entwässerungssysteme und ein System zur Überwachung der Auswirkungen des Staudamms auf das Grundwasser sowie die Durchführung von Verbesserungsarbeiten. (German)
    28 November 2021
    0 references
    Ogre, Ogres nov.
    0 references

    Identifiers

    5.1.1.0/15/I/001
    0 references