13,974,816.0 Euro
0 references
16,440,959.99 Euro
0 references
85.0 percent
0 references
18 September 2015
0 references
17 November 2017
0 references
Satiksmes ministrija
0 references
Projekta mērķis ir veikt segas pārbūvi (paaugstinot segas nestspēju), kas ietver jauna asfaltbetona seguma izbūvi, būvuzraudzību, autoruzraudzību, kā rezultātā tiks nodrošināti autoceļu lietotājiem komfortabli un droši braukšanas apstākļi. Plānotais kopējais projekta īstenošanas ilgums 26 mēneši. Projekta plānotās kopējās izmaksas 19 214 335,90 euro. Projekta īstenošanas rezultātā tiks sakārtots valsts galvenā autoceļa A2 Rīga - Sigulda - Igaunijas rob. (Veclaicene) (abas brauktuves) posms 20,20 km garumā. Projektā ietvertā autoceļa posma maksimālā autotransporta dzenošās ass slodze pēc projekta īstenošanas būs 11,5 tonnas un maksimālā nekontrolētā transportlīdzekļa pilnā masa būs 44 tonnas. (Latvian)
0 references
The aim of the project is to rebuild the duvet (increasing the bearing capacity of the duvet), which includes construction of new asphalt concrete pavement, construction supervision, author supervision, as a result of which comfortable and safe driving conditions will be provided to road users. The total planned duration of the project is 26 months. The estimated total cost of the project is EUR 19214335,90. As a result of the implementation of the project, the main state motorway A2 Riga – Sigulda – the Estonian Rob will be arranged. (Veclaicene) (both carriageway) section 20.20 km. The maximum driving axle load on the road section covered by the project will be 11.5 tonnes and the maximum uncontrolled vehicle mass will be 44 tonnes. (English)
15 July 2021
0 references
L’objectif du projet est d’effectuer une reconstruction de la chaussée (augmentation de la capacité portante de la chaussée), qui comprend la construction de nouvelles chaussées en béton bitumineux, la supervision de la construction, la supervision de l’auteur, ce qui permettra aux usagers de la route de bénéficier de conditions de conduite confortables et sûres. Durée totale prévue de mise en œuvre du projet 26 mois. Le coût total du projet est estimé à 19 214 335,90 EUR. À la suite de la mise en œuvre du projet, la route principale A2 Riga — Sigulda-Estonian rob sera triée. (Veclaicene) (les deux chaussées) section 20,20 km. La charge maximale par essieu moteur du tronçon routier couvert par le projet sera de 11,5 tonnes après la mise en œuvre du projet et le véhicule non contrôlé maximal de 44 tonnes. (French)
25 November 2021
0 references
Garkalnes pag., Ropažu nov.
0 references
Garkalnes pag., Ropažu nov.