Linkage of Jēkabpils City Infrastructure to the TEN-T Network (Q3057588)

From EU Knowledge Graph
Revision as of 20:32, 25 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet «Connexion des infrastructures de la ville de Jekabpils au réseau RTE-T» est de créer une voie alternative pour le transport de marchandises, en assurant l’intégration de l’infrastructure de transport de la ville de Jēkabpils dans le réseau RTE-T afin d’éviter les perturbations d’infrastructures de qualité, de réduire la pollution et les niveaux sonores dans la ville et de séparer au moins partiellement le flux du transport...)
Jump to navigation Jump to search
Project Q3057588 in Latvia
Language Label Description Also known as
English
Linkage of Jēkabpils City Infrastructure to the TEN-T Network
Project Q3057588 in Latvia

    Statements

    0 references
    5,645,343.0 Euro
    0 references
    6,641,580.0 Euro
    0 references
    85.0 percent
    0 references
    27 February 2018
    0 references
    26 July 2022
    0 references
    Jēkabpils novada pašvaldība
    0 references
    0 references
    0 references
    Projekta “Jēkabpils pilsētas infrastruktūras sasaiste ar TEN-T tīklu” mērķis ir radīt alternatīvu maršrutu kravas transportam, nodrošinot Jēkabpils pilsētas transporta infrastruktūras integrāciju TEN-T tīklā, lai novērstu kvalitatīvas infrastruktūras pārrāvumus, samazinot piesārņojuma un trokšņa līmeni pilsētā un vismaz daļēji atdalot kravas transporta plūsmu no sabiedriskā transporta plūsmas un novirzot no blīvāk apdzīvotām Jēkabpils pilsētas daļām.Lai nokļūtu no autoceļa P76 uz P75, kas savienots ar autoceļu A6 TEN – T tīklu, šobrīd transports tiek virzīts pa Brīvības ielu, R.Blaumaņa un Zaļo ielu caur pilsētas centrālo daļu.Šis maršruts nav piemērots kravas transporta kustībai, tāpēc ir nepieciešams veikt transporta novirzīšanu no pilsētas centrālās daļas veidojot tiešu savienojumu starp autoceļu P76 un autoceļu P75, pārbūvējot Dolomīta ielu un Brīvības ielas posmu no R.Blaumaņa ielas līdz Brīvības ielas krustojumam ar Dolomīta ielu.Uz autoceļa P75 (Neretas iela) atrodas gaisa pārvads pilsētas Kļavu ielas šķērsošanai. Šis pārvads ir sliktā tehniskā stāvoklī, un ir nepieciešama tā pārbūve, lai nodrošinātu pārvietošanās efektivitāti un drošību. Sliktā tehniskā stāvoklī un neatbilstošs satiksmes drošības prasībām ir arī ceļa P75 (Neretas iela) posms no Vienības ielas līdz krustojumam ar Ledus ielu. Arī šim posmam ir nepieciešama pārbūve. Lai izveidotu kvalitatīvu un drošu satiksmes mezglu Neretas ielas posmā no krustojuma ar Zaļo ielu līdz pilsētas robežai , nepieciešams pārbūvēt šo posmu, izbūvējot taisnvirziena brauktuvi nojauktā satiksmes pārvada vietā un izbūvējot rotācijas apli Neretas ielas krustojumā ar Dolomīta ielu. Autoceļa P75 posms - Zīlānu iela no Rīgas ielas līdz krustojumam ar Ventas ielu un Zīlānu ielas posms no krustojuma ar Slimnīcas ielu līdz krustojumam ar Ķieģeļu ielu, ir fiziski nolietojies un neatbilstošs satiksmes drošības prasībām. Visi iepriekš minētie ceļu posmi ir, vienotā maršrutā, lai pilsētas infrastruktūra būtu sasaistīta ar TEN – T tīklu. Iepriekšminētās aktivitātes vērsta uz to, lai izslēgtu nepieciešamību kravas transportam iebraukt pilsētā. Projekta realizāciju noslēdzot, visi 100% projekta ietvaros pārbūvējamo ielu posmi atradīsies pilsētas administratīvajā teritorijā.Projekta īstenošanas rezultātā tiks veicināta pilsētas transporta infrastruktūras sasaiste TEN – T tīklā paaugstinot galveno ielu caurlaides spējas un saīsinot nepieciešamo pārvietošanās laiku un uzlabojot dzīves vides kvalitāti pilsētas iedzīvotājiem. Projekts papildinās īstenoto projektu “Rīgas, Brīvības, Zaļās, R. Blaumaņa un tām pieguļošo ielu tīkla rekonstrukcija”, kura ietvaros tika rekonstruēta Brīvības iela līdz R. Blaumaņa iela, kuru krustojumā šobrīd kravas transports veic pagriezienu izbraukšanai uz Neretas ielu. Īstenojot projektu, sadalot transporta slodzi un novirzot kravas transportu no R. Blaumaņa un Zaļās ielas, tiks veicināta projektu ilgtspēja.Projekta galvenās darbības:1.TEP un izmaksu un ieguvumu analīzes izstrāde;2.Īpašumtiesību jautājumu risināšana;3.Būvprojektu izstrāde;4.Būvniecība;5.Būvuzraudzība;6.Autoruzraudzība;7.Publicitāte;Plānotie būvdarbu rezultāti:1.Brīvības ielas pārbūve (Autoceļa P76 posms) 1.566 km garumā;2.Dolomīta ielas pārbūve 1.679 km garumā;3.Neretas ielas pārbūve (Autoceļa P75 posms) 1.204 km garumā;4.Neretas ielas pārvada pār Kļavu ielu pārbūve - 1 gab.;6.Izbūvēti lokveida krustojumi - 2 gab.;7.Zīlānu ielas pārbūve (Autoceļa A12 posms) 0.89 km garumāProjekta investīciju izmaksu kopsumma ir EUR 10 156 214.86, no kurām attiecināmās izmaksas sastāda EUR 6 641 580 un neattiecināmās izmaksas ir EUR 3 514 634.86. Kohēzijas fonda līdzfinansējums projektam tiks piesaistīts EUR 5 645 343.00 apmērā, valsts budžeta dotācija EUR 249 059.25 un Jēkabpils pilsētas pašvaldības līdzfinansējums attiecināmo izmaksu segšanai EUR 747 177.75. Projekta īstenošana plānota no 2018. gada februāra līdz 2022. gada jūlijam ieskaitot. (Latvian)
    0 references
    The aim of the project “Joint of Jēkabpils City Infrastructure with TEN-T Network” is to create an alternative route for freight transport, ensuring integration of Jēkabpils city transport infrastructure into the TEN-T network in order to prevent breaks of quality infrastructure by reducing pollution and noise levels in the city and at least partially separating the flow of freight transport from public transport from public transport stream and diverting from more densely populated parts of Jēkabpils city street. This transmission is in poor technical condition and needs to be rebuilt to ensure that mobility is efficient and safe. The road P75 (Neretas Street) from Vienības Street to the intersection with Ledus Street is also in poor technical condition and does not comply with the road safety requirements. This stage, too, requires rebuilding. In order to create a quality and safe traffic hub on the Neretas street section from the crossroads with Green Street to the city border, it is necessary to rebuild this section by constructing a straight-way carriage at the demolished traffic transfer and constructing a rotary circle at the intersection of Neretas Street with Dolomīta Street. Section P75 of the motorway – Zīlānu Street from Riga Street to the junction with Ventas Street and Zīlāns Street from the intersection with Slimnīcas Street to the junction with Ķieģeļu Street, has worn out physically and does not comply with traffic safety requirements. All the above road sections are a single route, so that the urban infrastructure is linked to the TEN-T network. The above activities are aimed at excluding the need for freight transport to enter the city. At the end of the project, all 100 % of street sections to be rebuilt within the framework of the project will be located in the administrative territory of the city.The project will help to link the urban transport infrastructure to the TEN-T network by increasing the throughput of the main streets and reducing the necessary travel time and improving the quality of life for residents of the city. The project will complement the project “Reconstruction of Riga, Brivibas, Greens, R. Blaumaņa and the adjacent streets”, in which Brivibas Street was reconstructed to R. Blaumaņa Street, at the intersection of which freight transport is making a turning point for departure to Neretas Street. Project’s main activities:1.TTEP and cost-benefit analysis; 2.Setting up of property rights;3.Building of projects; 5.Building of construction;6.Executive supervision; 7.Publicity;Planned construction of works:1.Building works; 4.Building of construction; 5.7 Construction of road 89.10.156 Co-financing from the Cohesion Fund will be attracted to the project in the amount of EUR 5 645 343.00, state budget grant EUR 249 059.25 and co-financing by Jekabpils City Municipality to cover eligible costs of EUR 747 177.75. The implementation of the project is planned from February 2018 to July 2022 inclusive. (English)
    15 July 2021
    0 references
    L’objectif du projet «Connexion des infrastructures de la ville de Jekabpils au réseau RTE-T» est de créer une voie alternative pour le transport de marchandises, en assurant l’intégration de l’infrastructure de transport de la ville de Jēkabpils dans le réseau RTE-T afin d’éviter les perturbations d’infrastructures de qualité, de réduire la pollution et les niveaux sonores dans la ville et de séparer au moins partiellement le flux du transport de marchandises du flux de transport public et le déplacement des parties les plus densément peuplées de la ville. Cette transmission est en mauvais état technique et doit être reconstruite pour garantir l’efficacité et la sécurité de la mobilité. Le tronçon de la route P75 (rue Neretas) de la rue Vienības à la jonction avec la rue de glace est également en mauvais état technique et non conforme aux exigences de sécurité routière. Cette phase nécessite également une reconversion. Afin de créer un point de circulation de haute qualité et sûr sur le tronçon de la rue Neretas de la jonction avec la rue Green jusqu’à la frontière de la ville, il est nécessaire de reconstruire cette section en construisant une chaussée droite sur le site de la traversée de circulation démolie et en construisant un cercle de rotation à la jonction de la rue Neretas avec la rue Dolomīta. Le tronçon de la route P75 — Zīlāna iela de la rue Riga à la jonction avec la rue Ventas et la rue Zīlāna de la jonction avec la rue slimnīcas jusqu’à la jonction avec la rue de la route de Ventas, est physiquement usé et ne répond pas aux exigences de la sécurité routière. Tous les tronçons routiers mentionnés ci-dessus sont sur un même itinéraire, de sorte que l’infrastructure urbaine est reliée au réseau RTE-T. Les activités ci-dessus visent à exclure la nécessité du transport de marchandises pour entrer dans la ville. À la fin du projet, tous les tronçons des rues à reconstruire dans le cadre du projet seront situés sur le territoire administratif de la ville. Grâce à la mise en œuvre du projet, le raccordement des infrastructures de transport urbain dans le réseau RTE-T sera favorisé par l’augmentation de la capacité des rues principales et la réduction du temps de déplacement nécessaire et l’amélioration de la qualité de vie des habitants de la ville. Le projet complétera le projet mis en œuvre «Reconstruction du réseau de Riga, Brīvības, Verts, R. Blauma’a et rues adjacentes», au sein duquel la rue Brivibas jusqu’à la rue R. Blauma’a a été reconstruite, à la jonction de laquelle le transport de marchandises fait un virage pour le départ vers la rue Neretas. En mettant en œuvre le projet, en répartissant la charge de transport et en déplaçant le transport de marchandises à partir de R. Blauma’a et Green Street, la durabilité des projets sera encouragée.Le projet principal darbības:1.TEP et le développement de l’analyse coûts-avantages;2.Règlement des questions relatives aux droits de propriété;3.Développement du projet de construction;4.Construction;5.Suivi de la construction;6.Droit d’auteur;7.Publicité;Construction prévue rezultāti:1.Brīvības reconstruction de la rue (section de la route P76) d’une longueur de 1,566 km; 2.Reconstruction de la rue Dolomīta 1,679 km;3.Reconstruction de la rue Neretas (section de la route P75) pour une longueur de 1,204 km;4.Reconstruction de la rue Neretas au-dessus de la rue K’avu — 1 pcs;6.La construction de jonctions d’arc — 2 pièces;7.Reconstruction de la rue Zilāns (section A12 de l’autoroute) pour 0,89 kmLe coût total d’investissement du projet est de 1 016 114,86 EUR, dont les coûts éligibles sont de 6 641 580 EUR et les coûts inéligibles sont de 3 514 634,86 EUR. Le cofinancement du Fonds de cohésion sera attiré par le projet pour un montant de 5 645 343,00 EUR, le budget de l’État subventionnera 249 059,25 EUR et le cofinancement de la municipalité de Jēkabpils pour couvrir les coûts éligibles de 747 777,75 EUR. Le projet devrait se dérouler de février 2018 à juillet 2022 inclus. (French)
    25 November 2021
    0 references

    Identifiers

    6.1.4.2/17/I/006
    0 references