Improvement of energy efficiency at the 2nd service hotel J.Čakstes bulvāris 7, Jelgava (Q3056923)
Jump to navigation
Jump to search
Project Q3056923 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of energy efficiency at the 2nd service hotel J.Čakstes bulvāris 7, Jelgava |
Project Q3056923 in Latvia |
Statements
526,373.26 Euro
0 references
619,262.66 Euro
0 references
85.0 percent
0 references
29 January 2020
0 references
28 October 2020
0 references
LATVIJAS LAUKSAIMNIECĪBAS UNIVERSITĀTE
0 references
Projekta ietvaros plānots veicināt energoefektivitātes paaugstināšanu Latvijas Lauksaimniecības universitātes 2.dienesta viesnīcā Jāņa Čakstes bulvārī 7, Jelgavā. Projektā paredzēts īstenot šādas darbības: - ārsienu un cokola siltināšana; - logu un durvju nomaiņa; - bēniņu pārseguma siltināšana;- jumta seguma nomaiņa;- apkures sistēmas un siltummezgla atjaunošanu; - kanalizācijas ārējo tīklu atjaunošana;- pārvietot ārējo gāzes vadu;- būvdarbu būvuzraudzība; - projekta vadība; - publicitātes pasākumi. Projekta ieviešanas laiks - 9 mēneši. Plānotās kopējās izmaksas - EUR 723 157,66 t.sk. 85% ERAF finansējums - EUR 560 252,13 un 15% valsts budžeta finansējums - EUR 98 868.02, publiskās neattiecināmās izmaksas - EUR 64 037,51Iznākuma rādītāji: 1) Primārās enerģijas gada patēriņa samazinājums sabiedriskajās ēkās 2020.gadā - 333.30 MWh; 2) Aprēķinātais siltumnīcefekta gāzu samazinājums 2020.gadā - 67.68 CO2 ekvivalenta tonnas. Plānotie rezultāti: 1) Sagatavota projekta pamatojošā dokumentācija - 2 līgumi; 2) Veikti ēkas energoefektivitātes būvdarbi - 1 līgums; 3) Nodrošināti būvuzraudzības pakalpojumi - 1 līgumi; 4) Realizēti publicitātes pasākumi, uzstādīta 1 gab. informatīvā plāksne; 5) Nodrošināta projekta vadība 5 mēnešus; (Latvian)
0 references
Within the framework of the project it is planned to promote energy efficiency improvement at the 2nd service hotel Jānis Čakstes Boulevard 7 of the Latvian University of Agriculture in Jelgava. The project will implement the following activities: — insulation of exterior walls and caps; — replacement of windows and doors; — insulation of attic cover;- replacement of roofing;- renovation of heating system and heating unit; — renovation of external sewerage networks;- moving the external gas pipeline;- supervision of construction works; — project management; Publicity measures. Project implementation time – 9 months. Estimated total costs – EUR 723157,66 incl. 85 % ERDF funding – EUR 560 252.13 and 15 % of the state budget envelope – EUR 98 868.02, public ineligible costs – EUR 64 037.51 Output indicators: 1) Reduction of annual consumption of primary energy in public buildings in 2020-333.30 MWh; 2) Estimated greenhouse gas reduction in 2020-67.68 CO2 equivalent tons. Expected results: 1) prepared supporting documentation of the project – 2 contracts; 2) Energy performance construction works of the building – 1 contract; 3) construction supervision services provided – 1 contracts; 4) publicity measures have been implemented, 1 pcs. informative plate installed; 5) Provided project management for 5 months; (English)
15 July 2021
0 references
Dans le cadre du projet, il est prévu de promouvoir l’amélioration de l’efficacité énergétique à l’hôtel 2ème service de l’Université d’Agriculture de Lettonie à Jana Čakste Boulevard 7, Jelgava. Le projet prévoit les activités suivantes: — isolation des parois extérieures et du socle; — remplacement des fenêtres et des portes; — isolation au sol grenier;- remplacement de la toiture;- renouvellement du système de chauffage et du chauffage; — restauration des réseaux d’assainissement extérieurs;- déplacement du gazoduc externe;- supervision de la construction; — gestion de projet; — mesures de publicité. Délai de mise en œuvre du projet — 9 mois. Coût total estimé à 723 157,66 EUR dont 85 % du financement du FEDER — 560 252,13 EUR et 15 % du financement du budget national — 98 868,02 EUR, coûts publics inéligibles — 64037,51 EURIndicateurs de résultats: 1) réduction de la consommation annuelle d’énergie primaire dans les bâtiments publics en 2020-333,30 MWh; 2) la réduction calculée des gaz à effet de serre en 2020-67,68 tonnes d’équivalent CO2. Résultats escomptés: 1) la documentation à l’appui du projet préparé — 2 contrats; 2) La construction de la performance énergétique d’un bâtiment a été réalisée — 1 contrat; 3) Des services de supervision de la construction ont été fournis — 1 contrat; 4) Mesures de publicité réalisées, 1 pcs. plaque informative installée; 5) Gestion de projet assurée pendant 5 mois; (French)
25 November 2021
0 references
Jāņa Čakstes bulvāris 7, Jelgava, LV-3001
0 references
Identifiers
4.2.1.2/19/I/013
0 references