Making energy-reducing investments in the EKJU production unit (Q3056875)
Jump to navigation
Jump to search
Project Q3056875 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Making energy-reducing investments in the EKJU production unit |
Project Q3056875 in Latvia |
Statements
136,564.37 Euro
0 references
398,509.16 Euro
0 references
34.27 percent
0 references
18 December 2017
0 references
17 December 2019
0 references
SIA "EKJU"
0 references
SIA EKJU mērķis projekta ietvaros ir veikt pasākumu kopumu, kas nodrošina efektīvu energoresursu izmantošanu, enerģijas patēriņa samazināšanu un siltumnīcefekta gāzu samazināšanu. Investīcijas plānots veikt Cecīļu ielā 12, Ieriķos, trīs ražošans ēkas Nr.8, Nr.9 un Nr.11, kas atrodas zem kadastra numura 4246 007 0242. Veicot augstākminēto pasākumu kopumu, uzņēmumam būs iespējams:-paaugstināt savu konkurētspēju, samazinot pašizmaksu;-paaugstināt ražošanas kapacitāti;-radīt papildus darba vietas;Lai uzņēmums varētu sasniegt izvirzīto mērķi, tas plāno veikt sekojošu aktivitāšu kopumu:-Īstenot energoefektīvāku ražošanas tehnoloģisko iekārtu iegādi;-Veikt ēku energoefektivitāti paaugstinošas vienkāršotus atjaunošanas darbus;-Piesaistīt profesionālus speciālistus projekta vadīšanai.Īstenojot augstāk minētās aktivitātes, plānots, ka projekta iesniedzējs sasniegs sekojošus rādītājus:-Siltumenerģijas ietaupījums līdz 774,37 MWh/gadā-Elektroenerģijas ietaupījums – 21,06 MWh/gadāProjektam ir augsta gatavības pakāpe, SIA EKJU ir veicis iepirkumus, piesaistījis finansējumu un izstrādājis tehnisko dokumentāciju, lai varētu veikt plānoto aktivitāšu kopumu. Kopējās attiecināmās izmaksas sastāda 494’899,19 EURProjektu plānots īstenot saskaņā ar MK noteikumu 34. punktu - ne ilgāk kā 24 mēnešus no dienas, kad noslēgts līgums par projekta īstenošanu (bet ne ilgāk kā līdz 2020. gada 31. decembrim). (Latvian)
0 references
The aim of SIA EKJ within the project is to implement a set of measures that ensure efficient use of energy resources, reduction of energy consumption and reduction of greenhouse gases. The investments are planned at Cecīļu iela 12, Ieriķi, three production facilities No.8, No 9 and No.11, which are located under the cadastral number 4246 007 0242. By carrying out the above-mentioned set of measures, the company will be able to: – increase its competitiveness by reducing costs;-Increase production capacity;- Create additional workplaces;-In order to achieve the set goal, the company plans to carry out the following set of activities:-Implementing more energy efficient production technological equipment;-To promote energy efficiency increasing the building performance of simplified renovation works;-Involve professional specialists for project management. The total eligible costs are EUR 494'899,19 The project is planned to be implemented in accordance with Paragraph 34 of the Cabinet Regulations – not more than 24 months from the date of conclusion of the contract for the implementation of the project (but not later than until 31 December 2020). (English)
15 July 2021
0 references
L’objectif de SIA EKJU dans le cadre du projet est de mettre en œuvre un ensemble de mesures garantissant une utilisation efficace des ressources énergétiques, la réduction de la consommation d’énergie et la réduction des gaz à effet de serre. L’investissement devrait être réalisé au 12, rue Cecilu, Ieriki, trois bâtiments de production no 8, no 9 et no 11, situés sous le cadastre numéro 4246 007 0242. En mettant en œuvre l’ensemble des mesures susmentionnées, l’entreprise sera en mesure:- d’accroître sa compétitivité en réduisant ses coûts;- d’augmenter la capacité de production;- de créer des emplois supplémentaires; pour que l’entreprise puisse atteindre l’objectif fixé, elle prévoit de mener un ensemble d’activités:- Mettre en œuvre l’achat d’équipements technologiques de production plus économes en énergie;-Produire des travaux de rénovation simplifiés améliorant l’efficacité énergétique des bâtiments; dans le cadre de la mise en œuvre des activités susmentionnées, il est prévu que le demandeur du projet atteigne les indicateurs suivants:-Economie d’énergie thermique jusqu’à 774,37 MWh/an-Économies d’électricité — 21,06 MWh/anLe projet a un degré élevé de préparation, SIA EKJU a procédé à des achats, attiré des financements et développé une documentation technique pour mener à bien les activités prévues. Le montant total des coûts éligibles s’élève à 494 899,19 EUR. Le projet devrait être mis en œuvre conformément à l’article 34 du règlement du Cabinet — pas plus de 24 mois à compter de la date de conclusion du contrat de mise en œuvre du projet (mais au plus tard le 31 décembre 2020). (French)
25 November 2021
0 references
Cecīļu iela 12, Ieriķi, Drabešu pag., Cēsu nov., LV-4139
0 references
Identifiers
4.1.1.0/17/A/018
0 references