Feasibility study E22 (Q2660665)

From EU Knowledge Graph
Revision as of 14:47, 27 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
No description defined
Language Label Description Also known as
English
Feasibility study E22
No description defined

    Statements

    0 references
    0 references
    0 references
    400,000.0 Swedish krona
    0 references
    39,600.0 Euro
    28 April 2021
    0 references
    800,000.0 Swedish krona
    0 references
    79,200.0 Euro
    28 April 2021
    0 references
    50.0 percent
    0 references
    50.0 percent
    0 references
    16 May 2018
    0 references
    15 February 2019
    0 references
    Netport Science Park AB (Svb)
    0 references
    0 references
    37435
    0 references
    I förstudien ska Netport Science Park bedöma vilka förutsättningar som bör uppfyllas av en avgränsad elvägspilot på E22 och vilket vägavsnitt som lämpar sig. I förstudien kommer det lokala näringslivet involveras genom intervjuer och workshops. Med hjälp utav kartläggningar, beräkningar och konsultationer kommer projektets mål att nås. Intressenter kommer att intervjuas där relevanta frågeställningar kommer att tas upp. Resultatet av förstudien ska klargöra om det finns förutsättningar för en möjlig elvägspilot som uppfyller krav och kriterier för att gå vidare med ett genomförandeprojekt för att ta fram en plan för realisering av en elvägspilot. På sikt förväntas projektet leda till ett fossilfritt transportsystem genom elektrifiering av tunga transporter. (Swedish)
    0 references
    In the feasibility study, Netport Science Park will assess what conditions should be met by a delimited electric road pilot on the E22 and which road section is suitable. In the feasibility study, local business will be involved through interviews and workshops. With the help of surveys, calculations and consultations, the goal of the project will be achieved. Stakeholders will be interviewed where relevant issues will be addressed. The results of the feasibility study must clarify whether there are conditions for a possible electric road pilot that meets the requirements and criteria to proceed with an implementation project to develop a plan for the realisation of an electric road pilot. In the long term, the project is expected to lead to a fossil-free transport system through electrification of heavy transport. (English)
    29 April 2021
    0 references
    Dans le cadre de l’étude préalable, Netport Science Park évaluera quelles conditions devraient être remplies par un pilote de route électrique limité sur l’E22 et quel tronçon de route convient. Dans le cadre de l’étude préalable, les milieux d’affaires locaux participeront à des entrevues et à des ateliers. À l’aide d’enquêtes, de calculs et de consultations, les objectifs du projet seront atteints. Les intervenants seront interrogés lorsque les questions pertinentes seront abordées. Le résultat de l’étude préalable doit préciser s’il existe des conditions pour qu’un éventuel pilote de route électrique réponde aux exigences et aux critères de réalisation d’un projet de mise en œuvre visant à élaborer un plan de réalisation d’un pilote de route électrique. À long terme, le projet devrait déboucher sur un système de transport exempt de fossiles grâce à l’électrification des transports lourds. (French)
    25 November 2021
    0 references

    Identifiers

    20201703
    0 references