Construction of the new Beauvaisis Theatre (Q3684247)

From EU Knowledge Graph
Revision as of 23:57, 26 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le théâtre du Beauvaisis a été construit de façon provisoire au lendemain de la seconde guerre mondiale. Malgré des réhabilitations, le site ne répond plus aux attentes d’accueil des spectateurs, des artistes et professionnels. Les installation et équipements scéniques sont même obsolètes. Pour y remédier, après de nombreuses études, la communauté d‚agglomération, propriétaire du théâtre depuis 2013, a choisi de reconstruire un nouvel équipemen...)
Jump to navigation Jump to search
Project Q3684247 in France
Language Label Description Also known as
English
Construction of the new Beauvaisis Theatre
Project Q3684247 in France

    Statements

    0 references
    2,200,000.0 Euro
    0 references
    13,353,720.37 Euro
    0 references
    16.47 percent
    0 references
    1 December 2014
    0 references
    31 December 2019
    0 references
    Communauté d'agglomération du Beauvaisis
    0 references
    0 references
    Le théâtre du Beauvaisis a été construit de façon provisoire au lendemain de la seconde guerre mondiale. Malgré des réhabilitations, le site ne répond plus aux attentes d’accueil des spectateurs, des artistes et professionnels. Les installations et équipements scéniques sont même obsolètes. Pour y remédier, après de nombreuses études, la communauté d’agglomération, propriétaire du théâtre depuis 2013, a choisi de reconstruire un nouvel équipement, en lieu et place de l’ancien. Ce dernier abritera 2 salles de spectacle de 669 et 184 places, des espaces pour les répétitions, les ateliers pédagogiques, un foyer, des équipements et installations scéniques performants. Lieu déjà incontournable de diffusion du spectacle vivant de la Région, ce projet de reconstruction répond à toutes les exigences que ce doit d’avoir un théâtre labellisé "scène nationale", label obtenu en janvier 2018, mais qui sera effectif à l'ouverture du nouvel équipement, soit en septembre 2019. De plus, signé par l’architecte, François Chochon, cet équipement a pour vocation de porter une nouvelle ambition culturelle et artistique pour tous les publics. Il constituera également un atout pour le développement du territoire. (French)
    0 references
    The Beauvaisis Theatre was built provisionally in the aftermath of the Second World War. Despite renovations, the site no longer meets the expectations of spectators, artists and professionals. Scenic installations and equipment are even obsolete. To remedy this, after numerous studies, the agglomeration community, owner of the theatre since 2013, has chosen to rebuild new equipment, instead of the old one. The latter will house 2 theatres with 669 and 184 seats, spaces for rehearsals, pedagogical workshops, a fireplace, efficient stage equipment and installations. Already an unavoidable venue for broadcasting the live performance of the Region, this reconstruction project meets all the requirements that it must have a theatre labelled “national stage”, label obtained in January 2018, but which will be effective at the opening of the new equipment, i.e. in September 2019. In addition, signed by the architect François Chochon, this equipment aims to bring a new cultural and artistic ambition for all audiences. It will also be an asset for the development of the territory. (English)
    18 November 2021
    0 references
    Le théâtre du Beauvaisis a été construit de façon provisoire au lendemain de la seconde guerre mondiale. Malgré des réhabilitations, le site ne répond plus aux attentes d’accueil des spectateurs, des artistes et professionnels. Les installation et équipements scéniques sont même obsolètes. Pour y remédier, après de nombreuses études, la communauté d‚agglomération, propriétaire du théâtre depuis 2013, a choisi de reconstruire un nouvel équipement, en lieu et place de l‘ancien. CE dernier abritera 2 salles de spectacle de 669 et 184 places, des espaces pour les répétitions, les ateliers pédagogiques, un foyer, des équipements et installation scéniques performants. Lieu déjà incontournable de diffusion du spectacle vivant de la Région, ce projet de Rekonstruktion répond à toutes les exigences que ce doit d‚avoir un théâtre labellisé „scène nationale“, Label obtenu en janvier 2018, mais qui sera effectif à l‘ouverture du nouvel équipement, soit en septembre 2019. De plus, signé par l’architecte, François Chochon, cet équipement a pour vocation de porter une nouvelle ambition culturelle et artistique pour tous les publics. Il constituera également un atout pour le développement du territoire. (German)
    27 November 2021
    0 references

    Identifiers

    PI0013875
    0 references