NPO-DRR_PC Ljutomer (Q3277606)

From EU Knowledge Graph
Revision as of 13:43, 27 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q3277606 in Slovakia
Language Label Description Also known as
English
NPO-DRR_PC Ljutomer
Project Q3277606 in Slovakia

    Statements

    0 references
    355,450.73 Euro
    0 references
    473,934.31 Euro
    0 references
    75.0 percent
    0 references
    8 December 2019
    0 references
    31 December 2021
    0 references
    OBČINA LJUTOMER
    0 references
    0 references

    46°31'5.99"N, 16°11'46.21"E
    0 references
    9240
    0 references
    V okviru projekta bo zgrajeno cestno omrežje z enostranskim hodnikom za pešce, vodovod, fekalna in meteornakanalizacija in javna razsvetljava z naslednjimi dolžinami:Prometna infrastruktura, v skupni dolžini 284,38 m:? Rekonstrukcija dostopne poti s priključkom na reg. cesto od km 0+005,77 do km 0+187,17, v dolžini 181,40 m.? Nova dostopna cesta v dolžini 102,98 m, v asfaltni izvedbi od km 0+187,17 do km 0+290,15, širina 5,5 m.Komunalna infrastruktura:? Meteorna kanalizacija:? Vzdrževalna dela obstoječega meteornega kanalizacijskega sistema v dolžini 195 m.? Izgradnja novega meteornega kanalizacijskega sistema, v dolžini 114 m.Fekalna kanalizacija, 200 m.Vodovod, v skupni dolžini 213 m:Vodna infrastruktura:? protipoplavni ukrepi - nasip na poplavno varno koto.Energetska infrastruktura:? Javna razsvetljava, v skupni dolžini 271 m. (Slovenian)
    0 references
    The project will build a road network with a single-sided pedestrian, plumbing, faecal and meteornanalisation corridor and public lighting with the following dolžinami:Prometna infrastructure, total length 284.38 m:? Reconstruction of the access path with connection to the road from km 0+ 005,77 to km 0+ 187.17, with a length of 181.40 m.? New accessible road in length 102.98 m, in asphalt version from km 0+ 187.17 to km 0+ 290.15, width 5.5 m.Communal infrastructure:? Meteor sewage:? Maintenance work of an existing meteor sewer system of 195 m in length? Construction of a new meteor sewerage system, in length 114 m.Phical sewerage, 200 m.Water, with a total length of 213 m: Water infrastructure:? floodplain measures — dyke to the flood safe angle.Energy infrastructure:? Public lighting with a total length of 271 m. (English)
    19 October 2021
    0 references

    Identifiers

    OP20.07524
    0 references