Construction of a wood wafer boiler room and its heating network in Challuy (58) (Q3696025)

From EU Knowledge Graph
Revision as of 01:01, 27 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Installation d’une chaufferie bois de 110 kW + Silo et 6 Sous-Stationen pour Chauffer 7 Bâtiments (1 997 m²) à Challuy, translated_summary)
Jump to navigation Jump to search
Project Q3696025 in France
Language Label Description Also known as
English
Construction of a wood wafer boiler room and its heating network in Challuy (58)
Project Q3696025 in France

    Statements

    0 references
    162,629.99 Euro
    0 references
    325,259.99 Euro
    0 references
    50.0 percent
    0 references
    1 September 2018
    0 references
    30 June 2019
    0 references
    Syndicat d'énergies, d'équipement et d'environnement de la Nièvre (SIEEEN chaleur)
    0 references
    0 references
    Installation d'une chaufferie bois de 110 kW + silo et 6 sous-stations pour chauffer 7 bâtiments (1997 m²) à Challuy (French)
    0 references
    Installation of a wood boiler room of 110 kW + silo and 6 substations for heating 7 buildings (1 997 m²) in Challuy (English)
    22 November 2021
    0 references
    Installation d’une chaufferie bois de 110 kW + Silo et 6 Sous-Stationen pour Chauffer 7 Bâtiments (1 997 m²) à Challuy (German)
    27 November 2021
    0 references

    Identifiers

    BG0018431
    0 references