ERDF-ENERGETIC RENOVATION OF 180 DWELLINGS IN HARFLEUR-IMMOBILIERE LOWER SEINE (Q3681284)

From EU Knowledge Graph
Revision as of 23:26, 26 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): 180 Logements sammeln répartis sur 8 bâtiments collectifs disposés parallèlement sur la pente du site entouré d’espaces verts importants. Leur Bau, sous forme de barres et de plots, ont été édifiés au début des années 1960. Le chauffage, collectif, est assuré par une chaufferie et une sous-station. L’Eau Chaude Sanitaire est collective pour les bâtiments D à G, et individual pour A, B et C.La Conception Réalization Exploitation Maintenance (CREM...)
Jump to navigation Jump to search
Project Q3681284 in France
Language Label Description Also known as
English
ERDF-ENERGETIC RENOVATION OF 180 DWELLINGS IN HARFLEUR-IMMOBILIERE LOWER SEINE
Project Q3681284 in France

    Statements

    0 references
    1,076,404.59 Euro
    0 references
    3,588,015.29 Euro
    0 references
    30.0 percent
    0 references
    31 May 2021
    0 references
    IMMOBILIERE BASSE SEINE
    0 references
    0 references

    49°29'39.59"N, 0°7'11.75"E
    0 references
    76600
    0 references
    180 logements collectifs répartis sur 8 bâtiments collectifs disposés parallèlement sur la pente du site entouré d'espaces verts importants. Leur construction, sous forme de barres et de plots, ont été édifiés au début des années 1960. Le chauffage, collectif, est assuré par une chaufferie et une sous-station. L'Eau Chaude Sanitaire est collective pour les bâtiments D à G, et individuelle pour A, B et C.La Conception Réalisation Exploitation Maintenance (CREM) : Le contrat associe la conception et l'exploitation du chauffage à la réalisation des travaux afin de remplir des objectifs chiffrés d'efficacité énergétique. Le contrat signé le 28/12/2017, comprend une phase conception de 6 mois, une phase travaux de 18 mois et l'exploitation des installations collectives de chauffage et ECS du 01/09/2018 au 30/06/2032. (French)
    0 references
    180 collective dwellings spread over 8 collective buildings arranged parallel on the slope of the site surrounded by important green spaces. Their construction, in the form of bars and plots, was built in the early 1960s. The collective heating is provided by a boiler room and a substation. The Hot Water Sanitaire is collective for buildings D to G, and individual for A, B and C. Design Realisation Operation Maintenance (CREM): The contract combines the design and operation of heating with the execution of the works in order to meet quantified energy efficiency targets. The contract signed on 28/12/2017 includes a 6-month design phase, an 18-month work phase and the operation of the collective heating and ECS installations from 01/09/2018 to 30/06/2032. (English)
    18 November 2021
    0 references
    180 Logements sammeln répartis sur 8 bâtiments collectifs disposés parallèlement sur la pente du site entouré d’espaces verts importants. Leur Bau, sous forme de barres et de plots, ont été édifiés au début des années 1960. Le chauffage, collectif, est assuré par une chaufferie et une sous-station. L’Eau Chaude Sanitaire est collective pour les bâtiments D à G, et individual pour A, B et C.La Conception Réalization Exploitation Maintenance (CREM): Le contrat associe la concept et l‚exploitation du chauffage à la réalization des travaux afin de remplir des objectifs chiffrés d‘efficacité énergétique. Le contrat signé le 28/12/2017, comprend une phase concept de 6 mois, une phase travaux de 18 mois et l’exploitation des installations collectives de chauffage et ECS du 01/09/2018 au 30/06/2032. (German)
    27 November 2021
    0 references

    Identifiers

    18E01877
    0 references