Reconstruction of M L.N. Tolstý, large Kapu any (Q3100678)

From EU Knowledge Graph
Revision as of 13:53, 28 September 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project “Reconstruction of MŠ L.N.Tolstý, Veľký Kapušany” aims to reduce the energy intensity of the existing kindergarten on Sídl Street. L.N.Tolstého 89/2 in the village of Veľké Kapušany in the housing estate of L.N.Tolstý, in the district of Michalovce. There are currently 95 children attending kindergarten, of which 35 are placed in crèches. The present project will be implemented through one main activity “Reducing the energy intensity...)
Jump to navigation Jump to search
Project Q3100678 in Slovakia
Language Label Description Also known as
English
Reconstruction of M L.N. Tolstý, large Kapu any
Project Q3100678 in Slovakia

    Statements

    0 references
    250,033.93 Euro
    0 references
    294,157.56 Euro
    0 references
    85.0 percent
    0 references
    1 August 2020
    0 references
    1 June 2021
    0 references
    Mesto Veľké Kapušany
    0 references
    0 references

    48°33'13.10"N, 22°4'44.04"E
    0 references
    Projekt „Rekonštrukcia MŠ L.N.Tolstého, Veľké Kapušany“ sa zameriava na zníženie energetickej náročnosti jestvujúcej materskej školy na ulici Sídl. L.N.Tolstého 89/2 v intraviláne obce Veľké Kapušany na sídlisku L.N.Tolstého, v okrese Michalovce. Materskú školu v súčasnosti navštevuje 95 detí, z toho 35 je umiestnených v detských jasliach. Predkladaný projekt bude realizovaný prostredníctvom jednej hlavnej aktivity „Zníženie energetickej náročnosti MŠ L.N.Tolstého“, ktorá zahŕňa zateplenie obvodového a strešného plášťa a výmenu okenných výplní. Realizácia projektu je naplánovaná na 6 mesiacov.Dôvodom obnovy objektu je nevyhovujúci stav posudzovaných obvodových konštrukcií a z toho vyplývajúca ich znížená funkčnosť a vysoká energetická náročnosť.Cieľom projektu je zníženie spotreby energie a zvýšenie teploizolačných vlastnosti budovy materskej školy. Zateplenie celého objektu bude kontaktným zatepľovacím systémom, zateplenie sokla, zateplenie strešnej konštrukcie, výmena pôvodných okien, dverí, zasklených stien a copilitovej steny za nové okná, dvere a zasklené steny.Úspora mernej potreby tepla po ukončení realizácie projektu bude nižšia o 54%. (Slovak)
    0 references
    The project “Reconstruction of MŠ L.N.Tolstý, Veľký Kapušany” aims to reduce the energy intensity of the existing kindergarten on Sídl Street. L.N.Tolstého 89/2 in the village of Veľké Kapušany in the housing estate of L.N.Tolstý, in the district of Michalovce. There are currently 95 children attending kindergarten, of which 35 are placed in crèches. The present project will be implemented through one main activity “Reducing the energy intensity of MŠ L.N.Tolstý”, which includes insulation of the perimeter and roof covering and the replacement of window fillers. Implementation of the project is planned for 6 months.The reason for the renovation of the building is the poor state of the considered circuit structures and resulting their reduced functionality and high energy intensity.The aim of the project is to reduce energy consumption and increase the thermal insulation properties of the building of the kindergarten. The insulation of the whole building will be a contact insulation system, insulation of the plinth, insulation of the roof structure, replacement of original windows, doors, glazed walls and copilite walls for new windows, doors and glazed walls.Saving of specific heat needs after the completion of the project will be reduced by 54 %. (English)
    28 September 2021
    0 references

    Identifiers

    310041A444
    0 references