Increasing energy efficiency of public buildings in Medgidia, Nicolae Balcescu Theoretical High School, school body and sports hall, Medgidia (Q2742713)

From EU Knowledge Graph
Revision as of 19:43, 6 October 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q2742713 in Romania
Language Label Description Also known as
English
Increasing energy efficiency of public buildings in Medgidia, Nicolae Balcescu Theoretical High School, school body and sports hall, Medgidia
Project Q2742713 in Romania

    Statements

    0 references
    0 references
    4,634,393.33 Romanian Leu
    0 references
    926,878.6660000001 Euro
    13 September 2021
    0 references
    5,452,227.44 Romanian Leu
    0 references
    1,090,445.4880000001 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    10 July 2018
    0 references
    30 November 2021
    0 references
    U.A.T. MUNICIPIUL MEDGIDIA
    0 references
    0 references

    44°28'54.55"N, 26°10'1.63"E
    0 references
    Obiectivul general al proiectului vizeaza cresterea eficientei energetice in cele doua corpuri ale Liceul Teoretic Nicolae Bălcescu, Corp școală și Corp sală de sport, din Medgidia prin derularea de lucrari de interventie cu scopul consolidarii corpului scoala si termoizolarii cladirilor, modernizarii instalatiilor de preparare si distribuire a agentului termic si a apei menajere calde, inclusiv utilizarea de surse regenerabile pentru asigurarea necesarului de energie, precum si alte lucrari conexe. Obiectivul general sustine Prioritatea de investitii 3.1 Sprijinirea eficientei energetice, a gestionarii inteligente a energiei si a utilizarii energiei din surse regenerabile in infrastructurile publice, inclusiv in cladirile publice, si in sectorul locuintelor, Sectiunea B- Cladiri publice. Prin intermediul acestui proiect vor fi sprijinite activitati specifice realizarii de investitii pentru cresterea eficientei energetice a cladirilor publice, respectiv: A. Lucrări de reabilitare termică a elementelor de anvelopă a clădirii:  Izolarea termică a faţadelor – parte opacă: se realizează cu sisteme compozite de izolare termică a fațadelor cu o grosime a termoizolației de 20 cm. – sala de sport  Izolarea termică a faţadelor – parte opacă: se realizează cu sisteme compozite de izolare termică a fațadelor cu o grosime a termoizolației de 20 cm. Corp scoala  Izolarea termică a faţadei – parte vitrată, prin înlocuirea tâmplăriei exterioare existente, inclusiv a celei aferente accesului în clădirea publică, cu tâmplărie termoizolantă dotată, după caz, cu dispozitive/fante/grile pentru ventilarea spaţiilor ocupate şi evitarea apariţiei condensului pe elementele interioare de anvelopă. – corp scoala  Termo-hidroizolarea acoperișului in zona vestiarelor: se realizează cu sisteme compozite de termo-hidroizolare cu o grosime a termoizolației de 10 cm. – sala de sport  Termo-hidroizolarea terasei se realizează cu sisteme compozite de termoizolare cu o grosime a termoizolației de 30 cm. – corp scoala  Izolarea termică a planşeului peste subsol neîncălzit se realizează cu sisteme compozite de izolare termică cu o grosime a termoizolației de 10 cm.- corp scoala B. Lucrări de reabilitare termică a sistemului de încălzire/a sistemului de furnizare a apei calde de consum  Înlocuirea cazanului din centrala termică proprie, în scopul creşterii randamentului şi al reducerii emisiilor echivalent CO2 – corp scoala  Înlocuirea corpurilor de încălzire cu radiatoare - corp scoala  Înlocuirea corpurilor de încălzire cu radiatoare – sala de sport  Înlocuirea instalaţiei de distribuţie a agentului termic pentru încălzire - corp scoala  Înlocuirea instalaţiei de distribuţie a agentului termic pentru încălzire - sala de sport  Înlocuirea instalaţiei de distribuţie a agentului termic pentru apă caldă de consum - corp scoala C. Instalarea unor sisteme alternative de producere a energiei electrice și/sau termice pentru consum propriu  Instalar (Romanian)
    0 references
    The general objective of the project aims to increase energy efficiency in the two bodies of Nicolae Bălcescu Theoretical High School, School Corps and Sports Hall Corps, in Medgidia by carrying out intervention works with the aim of strengthening the school body and thermal insulation of buildings, modernising the installations for the preparation and distribution of heat agent and hot domestic water, including the use of renewable sources to ensure energy needs, as well as other related works. The general objective supports the Investment Priority 3.1 Supporting energy efficiency, smart energy management and renewable energy use in public infrastructures, including public buildings, and housing sector, Section B – Public Buildings. Through this project will be supported activities specific to the realisation of investments to increase the energy efficiency of public buildings, namely: A. Thermal rehabilitation works of the tyre elements of the building: Thermal insulation of facades – opaque part: it is performed with composite systems of thermal insulation of facades with a heat insulation thickness of 20 cm. — gym Thermal insulation of facades – opaque part: it is performed with composite systems of thermal insulation of facades with a heat insulation thickness of 20 cm. School body Thermal insulation of the facade – glazed part, by replacing the existing exterior joinery, including the one related to access to the public building, with thermal insulation joinery equipped, as appropriate, with devices/flies/grids for ventilation of occupied spaces and avoiding the occurrence of condensation on the interior elements of the tyre. — school body Thermo-hydroisolation of the roof in the locker area: it is performed with composite thermo-hydroisolation systems with a thermal insulation thickness of 10 cm. — Thermo-hydroisolation of the terrace is performed with composite thermal insulation systems with a heat insulation thickness of 30 cm. school body The thermal insulation of the floor over the unheated basement is carried out with composite thermal insulation systems with a heat insulation thickness of 10 cm.- school body. Works on thermal rehabilitation of the heating system/of the hot water supply system for consumption Replacement of the boiler in its own thermal power plant, in order to increase the efficiency and reduce CO2 equivalent emissions – school body Replacement of heating bodies with radiators – body Replacement of heating bodies with radiators – sports hall Replacement of the heater distribution installation – school body Replacement of the heater distribution installation for heating – heating room – Replacement of the thermal installation for the heating installation (English)
    14 September 2021
    0 references
    Municipiul Medgidia, Romania
    0 references

    Identifiers

    111799
    0 references