1,332,539.0 Euro
0 references
1,650,204.22 Euro
0 references
80.75 percent
0 references
11 December 2017
0 references
31 July 2021
0 references
VENTSPILS AUGSTSKOLA
0 references
Projekta "Irbenes radioteleskopu kompleksa modernizācijas 3. kārta" galvenais mērķis ir VeA IZI VSRC (Ventspils Augstskolas Inženierzinātņu institūta "Ventspils Starptautiskais radioastronomijas centrs") pabeigt Irbenes radioteleskopu kompleksa modernizāciju, kā arī stiprināt VSRC un VeA zinātnisko kapacitāti un izcilību, un nodrošināt iespējas sekmīgai integrācijai starptautiskās zinātniskās organizācijas, tādās kā EVN (European VLBI Network jeb Eiropas ļoti garas interferometrijas tīkls).Projekta mērķa sasniegšanai ir nepieciešamas investīcijas VeA zinātniskajā infrastruktūrā, kas ir plānotas kā ieguldījums Irbenes radioteleskopu modernizācijā un esošās infrastruktūras atjaunošanā, nodrošinot tās ilggadību, atbilstību vienmēr augošajām starptautiskajām prasībām un normatīviem, kā arī zinātniskā kompleksa darbības efektivitātes uzlabošanu.Projekts pēc OECD zinātņu nozaru FOS (Revised Field of Science and Technology) klasifikācijas, atbilstoši Frascati rokasgrāmatai ir klasificējams kā fizikālo zinātņu projekts, precīzāk, radioastronomijas un astrofizikas projekts.Projekts tiks īstenots kā ar saimniecisku darbību nesaistīts, jo vidējā svērtā ar saimniecisko darbību nesaistītā projekta daļa NPD% > 80% un ieguldījumus paredzēts izmantot projekta iesniedzēja pamatdarbībā, kurai nav saimniecisks raksturs, vai ierobežotas jomas darbībāProjekta īstenošana atbalsta RIS3 noteikto tautsaimniecības transformācijas virzienu un izaugsmes prioritāšu īstenošanu un specializācijas jomu attīstību, nodrošinot pētniekiem nepieciešamās infrastruktūras attīstību un uzturēšanu darba kārtībā, kas sekmē pētījumu izstrādi RIS3 atbalstītajās un citās jomās. Šī infrastruktūra un ar to strādājošie pētnieki var sniegt ieguldījumu šādās Latvijas Viedās Specializācijas stratēģijas specializācijas jomās:1.Zināšanu-ietilpīga bioekonomika – kosmiskās tehnoloģijas un ar tām saistītā kompetence (tālizpēte, GPS, utt.) ļauj sekmīgi veikt mežu inventarizācijas uzdevumus, mežu teritoriju energokrājas kartēšanu, koku sugu atpazīšanu, derīgās koksnes krājas aprēķinus, veikt izmaiņu monitoringu, attīstīt precīzās lauksaimniecības metodes utt. 2.Biomedicīna, medicīnas tehnoloģijas, biofarmācija un biotehnoloģijas – kosmosa pielietojumos attīstītās industriālās signālapstrādes metodes ļauj sekmīgi izstrādāt un piedāvāt jaunus pakalpojumus biosignālu medicīnas un medicīnas iekārtu izstrādē;3.Viedā enerģētika – jaunās paaudzes radioteleskopi ir lieliski sensoru tīklu poligoni dabiski šķēršļotā un zema trokšņa apstākļos, ko Irbenē nodrošina Aizsargjoslu likums. Savukārt, uzkrātā “machine-to-machine” datu apmaiņas kompetence ļauj risināt arī satelīts – satelīts, satelīts – zeme telekomunikāciju uzdevumus.4.Informācijas un komunikāciju tehnoloģijas – radioteleskopi ar uztverošajiem datu blokiem, HPC, straumēšanas un datu formatēšanas tehnoloģijas. Observatorijas pāriet no MARK5 uz MARK6 standartu – iekārta kompakta un ātrāka. RT komplekss atsevišķi ietekmē IKT attīstību LR, ātrās prototipēšanas laboratorija, kas pamatā ir domāta tieši VSRC, kamēr e-VLBI standarts – IKT virzību ES.Galvenās projekta darbības ietver:1. Ar būvniecību nesaistīti Irbenes radioteleskopu kompleksa darbības efektivitātes celšanas pasākumus, kas vērsti uz RT-32 radioteleskopa uztveršanas efektivitātes uzlabošanu;2. Irbenes radioteleskopu kompleksa atjaunošana un remontdarbi, kuru izpilde noslēgs Irbenes radioteleskopu kompleksa renovācijas darbus;3. VeA IZI VSRC zinātniskās infrastruktūras papildināšana Astrofizikas un Tālizpētes nodaļām, kā arī mehānikas un elektronikas laboratorijām, šo nodaļu sekmīgas darbības un attīstības nodrošināšanai, ceļot to zinātnisko kapacitāti un attīstot potenciālu.Projekta rezultātā tiks noslēgta Irbenes radioteleskopu kompleksa modernizācija, nodrošinot šī mega-objekta ilggadību; iegūts jauns aprīkojums Tālizpētes un Astrofizikas nodaļas; paplašināts mehānikas un elektronikas laboratoriju aprīkojuma klāsts; celta RT-32 uztveršanas efektivitāte 1,5 līdz 1,8 reizes. Visi šie rezultāti veicinās fundamentālās zinātnes attīstību, cels VSRC zinātnisko potenciālu un kapacitāti kā arī veicināts zinātnisko atklājumu veikšanu. Šis projekts ir ieguldījums nākotnē, ļaujot jaunajiem zinātniekiem strādāt ar laikam atbilstošu aprīkojumu.Kopējās projekta izmaksa ir EUR 1 650 204.22, no tiem 5%, EUR 82 510,22 ir Ventspils Augstskolas līdzfinansējums, 14,25 %, EUR 235 155 ir Valsts finansējums un 80,75%, EUR 1 332 539 ERAF finansējums.Projekta īstenošanas ilgums: 44 mēneši. Projekta ieviešanas sākuma datums: 11.12.2017. (Latvian)
0 references
The main objective of the project “3 rd stage modernisation of the Irbene radio telescope complex” is to complete the modernisation of the Irbene radio telescope complex, as well as to strengthen the scientific capacity and excellence of VIRAC and VeA, and to provide opportunities for successful integration of international scientific organisations such as EVN (European VLBI Network or European very long interferometry network). which are planned as a contribution to the modernisation of the Irbene radio telescopes and the renewal of the existing infrastructure, ensuring its longevity, compliance with the ever-growing international requirements and norms, as well as improving the efficiency of the scientific complex.The project according to the OECD classification of FOS (Revised Field of Science and Technology), according to the Frascati Manual, is to be classified as a physical science project, more precisely, a project of radio astronomy and astrophysics.The project will be implemented as a non-economic activity, because the weighted average non-economic part of the project is NPD% > 80 % and the investments are intended to be used in the project applicant’s non-economic core activity or in a limited area.The implementation of the project supports the implementation of the economic transformation directions and growth priorities defined by RIS3 and the development of specialisation areas, ensuring that the necessary infrastructure for researchers is developed and maintained on the agenda, which facilitates the development of research in RIS3 supported and other areas. This infrastructure and the researchers working with it can contribute to the following Latvian Smart Specialisation Strategy specialisations: bioeconomy — space technologies and related competence (remote research, GPS, etc.) allows successfully performing forest inventory tasks, mapping of forest areas energy stocks, recognition of tree species, calculation of useful wood collection, monitoring of changes, development of precision farming methods, etc. 2.Biomedicine, medical technologies, biopharmaceuticals and biotechnologies — industrial signal processing methods developed in space applications allow to successfully develop and offer new services in the development of biosignal medical and medical equipment;3.Since energy — the new generation of radio telescopes are excellent sensor network landfills in naturally obstructed and low noise conditions provided by the Protection Zone Law in Irbene. In turn, the accumulated competence of “machine-to-machine” data exchange also allows to solve satellite — satellite, satellite — earth telecommunication tasks.4.Information and communication technologies — radio telescopes with receiving data blocks, HPC, streaming and data formatting technologies. Observatories move from MARK5 to MARK6 standard — equipment compact and faster. RT complex individually affects the development of ICT in LR, a rapid prototyping laboratory, which is basically aimed specifically at VIRAC, while e-VLBI standard — ICT advancement in the EU.The main activities of the project include:1. Non-construction measures to increase the efficiency of the Irbene radio telescope complex, aimed at improving the efficiency of the reception efficiency of the RT-32 radio telescope;2. Renovation and repair of the Irbene radio telescope complex, the execution of which will conclude renovation works of the Irbene radio telescope complex;3. VEA IZI VIRAC scientific infrastructure for the Astrofysics and Talsi Research Departments, as well as for mechanics and electronics laboratories, ensuring the successful operation and development of these departments, increasing their scientific capacity and developing potential. The project will result in the completion of the modernisation of the Irbene radio telescope complex, ensuring the longevity of this mega object; new equipment has been obtained from the Divisions of Telescience and Astrophysics; an expanded range of mechanics and electronics laboratory equipment; RT-32 capture efficiency built 1.5 to 1.8 times. All these results will contribute to the development of fundamental science, increase the scientific potential and capacity of the VIRAC, as well as promote scientific discoveries. This project is an investment in the future, allowing young scientists to work with time-appropriate equipment.The total cost of the project is EUR 1 650 204.22, of which 5 %, EUR 82 510.22 is co-financed by Ventspils University College, 14.25 %, EUR 235 155 is State funding and 80.75 %, EUR 1 332 539 ERDF funding. Duration of the project: 44 months. Start date of project implementation: 11.12.2017. (English)
30 September 2021
0 references
Viraki, Ances pag., Ventspils nov., LV-3601
0 references
Identifiers
1.1.1.4/17/I/010
0 references