17 km renewal of drinking water system in the Grand Abymes Fund — 2018 Emergency Plan (Q3685572)

From EU Knowledge Graph
Revision as of 18:16, 18 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3685572 in France
Language Label Description Also known as
English
17 km renewal of drinking water system in the Grand Abymes Fund — 2018 Emergency Plan
Project Q3685572 in France

    Statements

    0 references
    4,620,000.0 Euro
    0 references
    5,775,000.0 Euro
    0 references
    80.0 percent
    0 references
    23 February 2018
    0 references
    31 December 2023
    0 references
    EAU D'EXCELLENCE
    0 references
    L’étage de distribution du compteur de caraque est long 58 km. Ce compteur est alimenté directement par le feeder de Belle Eau Cadeau nous observons depuis plusieurs années une baisse significative de la pression sur ce réseau de Belle-Eau-Cadeau. Par voie de conséquence : les réservoirs et les habitations situées sur les points hauts ont du mal à être alimentés. L’objet de ce projet est le renouvellement du réseau de distribution de l’étage de Caraque dans les Grands-Fonds sur la commune des Abymes. Il s’agit de la première et la deuxième tranche d’un programme de renouvellement des réseaux et des branchements qui a été décomposé en 6 phases opérationnelles. Cela représente ainsi un total 17 km du réseau d’eau potable incluant le report et le renouvellement des branchements, ainsi que la mise en œuvre de compteurs et de vannes de renouvellement de sectorisation. Les impacts attendus des travaux sont :  La réduction du débit des fuites de 100 m3/h et les pertes d’eau sur le réseau de distribution sur le secteur de Grands-Fonds Abymes et Gosier.  L’augmentation des volumes disponibles en matière d’eau potable pour d’autre périmètre notamment pour les Grands Fonds Gosier  L’amélioration du rendement de réseau de distribution sur le secteur de Grands-Fonds Abymes. (French)
    0 references
    The distribution floor of the caraque meter is 58 km long. This meter is powered directly by the feeder of Belle Eau Gifteau we have observed for several years a significant decrease in the pressure on this network of Belle-Eau-Cadeau. As a consequence: reservoirs and dwellings located on the high points have difficulty in being fed. The purpose of this project is the renewal of the distribution network of the Caraque floor in the Grands-Fonds in the commune of Abymes. This is the first and second tranche of a network and branch renewal programme that has been broken down into six operational phases. This represents a total of 17 km of the drinking water system, including the postponement and renewal of connections, as well as the implementation of metering and sectorisation renewal valves. The expected impacts of the work are: Reduction of leak flow by 100 m³/h and water losses on the distribution system on the Abymes and Gosier Grand-Fonds area. Increasing the volume of drinking water available for other areas, notably for the Grand Gosier Funds Improving the efficiency of the distribution system in the Abymes Grand fonds area. (English)
    18 November 2021
    0 references

    Identifiers

    GP0019404
    0 references