Rehabilitation of the Public Space of Viana do Castelo – 8th Phase (Q2895692)

From EU Knowledge Graph
Revision as of 20:57, 21 October 2021 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 984,530.99 euro)
Jump to navigation Jump to search
Project Q2895692 in Portugal
Language Label Description Also known as
English
Rehabilitation of the Public Space of Viana do Castelo – 8th Phase
Project Q2895692 in Portugal

    Statements

    0 references
    4 October 2018
    0 references
    28 February 2021
    0 references
    MUNICÍPIO DE VIANA DO CASTELO
    0 references
    Q3000045 (Deleted Item)
    0 references

    41°41'32.53"N, 8°50'18.13"W
    0 references
    A operação constituída por 2 ações, uma de carácter material incidindo sobre a ARU Cidade Poente. Inclui a remodelação das redes de águas residuais, abastecimento de água, iluminação pública, a introdução de rede de ITUR. A 2ª ação de carácter imaterial diz respeito à animação urbana, permite reforçar a atratividade da cidade, gerando uma nova atmosfera urbana que visa, promover a atividade económica, valorizar os espaços do centro histórico. (Portuguese)
    0 references
    The operation consists of 2 shares, one of a material nature focusing on the ARU City West. It includes the refurbishment of wastewater networks, water supply, public lighting, the introduction of ITUR network. The 2nd action of immaterial character refers to urban animation, it allows to strengthen the attractiveness of the city, generating a new urban atmosphere that aims to promote economic activity, to enhance the spaces of the historical center. (English)
    8 July 2021
    0 references
    Viana do Castelo, União das freguesias de Viana do Castelo (Santa Maria Maior e Monserrate) e Meadela
    0 references

    Identifiers

    NORTE-05-2316-FEDER-000152
    0 references