Improving pedestrian accessibility (Q3172836)

From EU Knowledge Graph
Revision as of 19:37, 10 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3172836 in Spain
Language Label Description Also known as
English
Improving pedestrian accessibility
Project Q3172836 in Spain

    Statements

    0 references
    38,261,687.5 Euro
    0 references
    76,523,375.0 Euro
    0 references
    50.0 percent
    0 references
    30 October 2018
    0 references
    31 May 2021
    0 references
    AYUNTAMIENTO DE TORRELAVEGA
    0 references

    43°20'55.43"N, 4°3'5.44"W
    0 references
    39087
    0 references
    "Esta operación pretende priorizar la mejora de la accesibilidad, conectividad y permeabilidad de los barrios vulnerables, para favorecer su integración con el resto de la ciudad y reducir el transporte privado potenciando la movilidad alternativa no contaminante, con el objetivo de reducir las emisiones de CO2. Incluye la posibilidad de invertir en infraestructuras públicas, elementos de movilidad y sistemas de gestión del tráfico. Las intervenciones definidas están previstas en el Plan de Movilidad Urbana Sostenible (PMUS) de Torrelavega y en el Plan Estratégico de Torrelavega 2016-2026 en cuanto a mejora de la movilidad urbana de la ciudad e incluyen actuaciones para la mejora de la accesibilidad peatonal de Torrelavega y la mejora de la conectividad entre el barrio de El Cerezo y el resto de la ciudad. En concreto se planifican las siguientes actuaciones:_x000D_ _x000D_ - Rehabilitación de las calles Ancha y Carrera_x000D_ _x000D_ - Rehabilitación del Paseo del Niño_x000D_ _x000D_ - Pasarela de conexión del río Saja-Besaya_x000D_ _x000D_ Las actuaciones se describen de forma detallada eb el documento ""Descripción de las actuaciones que forman parte de la operación L2"", anexado a esta Expresión de Interés" (Spanish)
    0 references
    "This operation aims to prioritize the improvement of accessibility, connectivity and permeability of vulnerable neighborhoods, to favor their integration with the rest of the city and reduce private transport by promoting non-polluting alternative mobility, with the aim of reducing CO2 emissions . Includes the possibility of investing in public infrastructures, mobility elements and traffic management systems. The defined interventions are foreseen in the Sustainable Urban Mobility Plan (SUMP) of Torrelavega and in the Torrelavega Strategic Plan 2016-2026 in terms of improvement of urban mobility in the city and include actions to improve pedestrian accessibility in Torrelavega and improve connectivity between the El Cerezo neighborhood and the rest of the city. Specifically, the following actions are planned:_x000D_ _x000D_ - Rehabilitation of Ancha and Carrera streets_x000D_ _x000D_ - Rehabilitation of the Paseo del Niño_x000D_ _x000D_ - Footbridge connecting the Saja-Besaya river_x000D_ _x000D_ The actions are described in detail in the document "" Description of the actions that are part of the L2 operation "", attached to this Expression of Interest" (English)
    0 references
    Torrelavega
    0 references

    Identifiers

    FCL3CN00101
    0 references