Requalification of the School Park – 3rd Phase (Q2881925)
Jump to navigation
Jump to search
Project Q2881925 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Requalification of the School Park – 3rd Phase |
Project Q2881925 in Portugal |
Statements
449,084.85 Euro
0 references
1 March 2018
0 references
30 January 2020
0 references
MUNICIPIO DE SETUBAL
0 references
Considerando a realidade do Parque Escolar concelhio torna-se imprescindível a realização de intervenções a nível de reabilitação das infraestruturas, a reparação de infiltrações, fissuras, pinturas de tetos e paredes, a remodelação de cozinhas e refeitórios assim como de instalações sanitárias, espaços exteriores e remoção de fibrocimento. (Portuguese)
0 references
Considering the reality of the Municipal School Park, it is essential to carry out interventions in the level of infrastructure rehabilitation, the repair of infiltrations, cracks, ceiling and wall paintings, the remodeling of kitchens and cafeterias as well as sanitary facilities, outdoor spaces and removal of fibrocement. (English)
7 July 2021
0 references
Setúbal, Setúbal (São Sebastião)
0 references
Identifiers
LISBOA-07-5673-FEDER-000053
0 references