Valada sewage treatment plant (Q2981990)

From EU Knowledge Graph
Revision as of 15:06, 15 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Jump to navigation Jump to search
Project Q2981990 in Portugal
Language Label Description Also known as
English
Valada sewage treatment plant
Project Q2981990 in Portugal

    Statements

    0 references
    2,144,385.29 Euro
    0 references
    29 January 2016
    0 references
    31 May 2020
    0 references
    CARTÁGUA - ÁGUAS DO CARTAXO, S.A.
    0 references
    0 references
    0 references

    39°9'42.91"N, 8°47'10.46"W
    0 references
    Remodelação da ETAR de Valada e construção do sistema intercetor. O sistema intercetor compõe-se de 3 setores, cada um deles composto por uma estação elevatória e uma conduta elevatória. A ETAR existente permite atualmente o tratamento de águas residuais de 1,3% da população do município do Cartaxo. Graças a esta intervenção, 12,5% da população do Cartaxo passará a ter acesso a um sistema de saneamento adequado. (Portuguese)
    0 references
    Redevelopment of the Valada treatment plant and construction of the interceptor system. The interceptor system consists of 3 sectors, each consisting of a lifting station and a lifting conduit. The existing sewage treatment plant currently allows waste water treatment for 1.3 % of the population of the municipality of Cartaxo. Thanks to this intervention, 12.5 % of the population of Cartaxo will have access to an adequate sanitation system. (English)
    9 July 2021
    0 references
    Cartaxo
    0 references

    Identifiers

    POSEUR-03-2012-FC-000011
    0 references